You are on page 1of 2

PROPOSED BAS TYPICAL I/O POINT SCHEDULE FOR PRASARANA HQ

POINTS TYPE
DO DI AI AO HLI

RETURN AIR/ EXHAUST AIR TEMPERATURE


CIRCUIT BREAKER - OPEN/ CLOSED STATUS

KILOWATT HOUR (KWH) - TOTAL ENERGY


INCOMING MAIN AC POWER FAIL ALARM

OVERCURRENT/ EARTH FAULT STATUS


HIGH TEMPERATURE TRIP ALARM

CARBON MONOXIDE (CO) SENSOR

MOTORISED DAMPER ACTUATOR


WATER DIFFERENTIAL PRESSURE

MODULATING CONTROL VALVE


CIRCUIT BREAKER - TRIP ALARM
AUTO/ MANUAL MODE STATUS

CARBON DIOXIDE (CO2) SENSOR


RETURN WATER TEMPERATURE

WATER FLOW RATE OUTGOING


WATER FLOW RATE INCOMING
SUPPLY WATER TEMPERATURE

DIGITAL WATER METER (DWM)


DIGITAL POWER METER (DPM)
OUTDOOR AIR TEMPERATURE

EXHAUST AIR TEMPERATURE


HIGH TEMPERATURE ALARM

AIR PRESSURE DIFFERENTIAL


HIGH WATER LEVEL ALARM

BATTERY CHARGER STATUS


BREAKER STATUS (OUTPUT)

LOW WATER LEVEL ALARM


ON/OFF VALVE ACTUATOR

SUPPLY AIR TEMPERATURE

RETURN WATER PRESSURE


SUPPLY WATER PRESSURE
BREAKER STATUS (INPUT)

OUTDOOR AIR HUMIDITY


DESCRIPTION :

POWER FAILURE ALARM


START/STOP COMMAND

VARIABLE SPEED DRIVE

VARIABLE SPEED DRIVE


RETURN AIR HUMIDITY

WATER CONSUMPTION
TEMPERATURE ALARM

PEAL POWER DEMAND


FAIL TO START ALARM
BREAKER TRIP STATUS

ROOM TEMPERATURE
FILTER DIRTY ALARM
TRIP / FAULT ALARM
ON/OFF COMMAND

POWER FACTOR (PF)


FUEL LEVEL ALARM
RUN/ STOP STATUS

APPARENT POWER
AIR FLOW STATUS
COMMON ALARM

REACTIVE POWER
GENERAL ALARM

RUNNING HOURS

VOLTAGE (R, Y, B)

CURRENT (R, Y, B)
ROOM HUMIDITY
ON / OFF STATUS

FREQUENCY (HZ)
KILOWATT (KW)
ACTIVE POWER
OC/ EF STATUS

BTU METER
QUANTITY

FIRE MODE
DESCRIPTION LOCATION DO DI AI AO AO

A) AIRCOND SYSTEM

1 CHILLER SYSTEM

1.1 CHILLER GF 3 3 3 3 3 3 1 1 3 3 3

1.2 CHILLED WATER PUMP (CHWP) GF 3 3 3 3 3 3 3 3 3

1.3 CONDENSER WATER PUMP (CWP) GF 3 3 3 3 3 3 3 3 3

1.4 CHILLED WATER BY-PASS - COMMON HEADER GF 1 1 1 1 1

1.5 COOLING TOWER L1 3 3 3 3 3 3 3 3 3

1.6 A/C MAKE UP TANK L1 1 1 2

1.7 A/C EXPANSION TANK ROOF 1 1 2

2 AIR HANDLING UNITS (AHU)

2.1 AHU GF 4 4 4 4 4 4 4 4

2.2 AHU L1 2 2 2 2 2 2 2 2

2.3 AHU L2 2 2 2 2 2 2 2 2

2.4 AHU L3 2 2 2 2 2 2 2 2

2.5 AHU L4 2 2 2 2 2 2 2 2

2.6 AHU L5 2 2 2 2 2 2 2 2

2.7 AHU L6 2 2 2 2 2 2 2 2

2.8 AHU L7 2 2 2 2 2 2 2 2

2.9 AHU L8 2 2 2 2 2 2 2 2

2.10 AHU L9 2 2 2 2 2 2 2 2

2.11 AHU L10 2 2 2 2 2 2 2 2

2.12 AHU L11 2 2 2 2 2 2 2 2

2.13 AHU L12 2 2 2 2 2 2 2 2

3 FAN COIL UNITS (DUCTED FCU)

3.1 FCU GF 9 9 9 9 9 9

3.2 FCU L1 2 2 2 2 2 2

3.3 FCU L2 1 1 1 1 1 1

3.4 FCU L3 1 1 1 1 1 1

3.5 FCU L4 3 3 3 3 3 3

3.6 FCU L5 1 1 1 1 1 1

3.7 FCU L6 1 1 1 1 1 1

3.8 FCU L7 1 1 1 1 1 1

3.9 FCU L8 1 1 1 1 1 1

3.10 FCU L9 1 1 1 1 1 1

3.11 FCU L10 1 1 1 1 1 1

3.12 FCU L11 1 1 1 1 1 1

3.13 FCU L12 2 2 2 2 2 2

4 FAN COIL UNITS (NON-DUCTED FCU)

4.1 FCU GF 3 3 3 3 3

4.2 FCU L1 10 10 10 10 10

4.3 FCU L8 32 32 32 32 32

5 PRECISION AIRCOND FOR SERVER ROOM L6 2 2 2 2 2 2 2

B) MECHANICAL VENTILATION SYSTEM

1 SMOKE SPILL FAN - ATRIUM (FOR BOMBA) ROOF 2 2 2 2 2 2

2 FRESH AIR FAN - ATRIUM (FOR BOMBA) GF 2 2 2 2 2 2

3 SMOKE SPILL FAN - BALLROOM (FOR BOMBA) GF 3 3 3 3 3 3

4 FRESH AIR FAN - BALLROOM (FOR BOMBA) GF 3 3 3 3 3 3

5 PRESSURASATION FAN (FOR BOMBA) ROOF 3 3 3 3 3 3

6 EXHAUST FAN - MAIN TOILET ROOF 2 2 2 2 2

7 EXHAUST FAN - KITCHEN GF 1 1 1 1 1

8 EXHAUST FAN - M&E ROOM GF 8 8 8 8 8

C) DOMESTIC COLD WATER SYSTEM

1 WATER SUCTION TANK GF 1 1 1 2

2 WATER STORAGE TANK ROOF 1 1 1 10

3 WATER SUCTION PUMP (DUTY & STANDBY) GF 2 2 2 2 1

4 WATER DISTRIBUTION PUMP (DUTY & STANDBY) ROOF 3 3 3 3 1

Page 1 of 2
D) RAIN WATER HARVESTING SYSTEM

1 RAIN WATER HARVESTING TANK L1 1 1 2

2 DISTRIBUTION PUMP L1 2 2 2 2 2

E) ELECTRICAL SYSTEM

1 MSB (NON ESSENTIAL) GF 1 1 1 1

1A OUTGOING (NON ESSENTIAL) GF 1 1 1 1

1B OUTGOING (ESSENTIAL) GF 4 4 4

2 MSB (ESSENTIAL) GF 1 1 1

2A OUTGOING (NON ESSENTIAL) GF 1 1 1 1

2B OUTGOING (ESSENTIAL) GF 13 13 13

3 GENERATOR SET GF 1 1 1 1 1 1 1 1 1 1

4 SUB SWITCH BOARD (SSB) - NORMAL GF 14 14 14 14 1

5 DISTRIBUTION BOARD GF 52 52 52 52 52 52

6 UPS GF 1 1 1 1 1 1 1 1

7 TRANSFORMER (TX) GF 1 1 1 1 1

F) ELEVATOR SYSTEM ROOF 10 10 10 10 10

H) OTHERS

H1 ENERGY MANAGEMENT SYSTEM

SUB-TOTAL 204 25 0 230 238 193 11 1 1 1 2 11 0 0 1 1 5 0 28 0 1 1 13 0 0 0 24 2 3 1 6 2 1 1 0 0 0 0 0 12 12 0 0 1 0 0 1 0 2 0 0 0 0 0 0 0 0 0 0 30 29 0 69 18 1 0

TOTAL 229 768 38 59 88

GRAND TOTAL 1182

Page 2 of 2