You are on page 1of 27

LNG/C Boiler & Turbine Controls

Presentation 2011

1
Company history/philosophy

1979: Founded by three automation engineers at Kockums.

1980: Texon acquires Kockums Marine Process Automation


150 boiler control systems installed of them 15 LNG/C.

2007: Acquired by Kockumation Group. Kockumation group


consist of Kockum Sonics, Texon Automation & Polarmarine.

Business philosophy:
Turn key solutions including design, hardware, software, field
equipment, installation, commissioning and functional guarantee

Long term partnership:


Texon can still support combustion control system produced in the
1970´s!

2
Typical projects
Texon Automation has for 40 years been involved in designing
and producing ships automation systems, in particular controls
for LNG carriers. Typical turnkey projects have included the
following control and monitoring systems:

Automatic Combustion Controls (ACC)


Burner Management System (BMS)
Main Engine/Turbine controls
Miscellaneous controls (steam temperature, water
level, feed pump, etc.)
Low Duty Compressor controls
Consumption and venting gas flow measurement
systems
Engine monitoring systems

3
Recent references LNG/C
Owner Vessel Remark
GOLAR Hilli Boiler Controls, Turbine Controls
GOLAR Khannur Boiler Controls, Turbine Controls
GOLAR Gimi Boiler Controls, Turbine Controls
GOLAR Golar Spirit Boiler Controls
GOLAR Golar Freeze Boiler Controls, Turbine Controls
GOLAR Gandria Boiler Controls, Turbine Controls
GOLAR Golar Spirit Boiler Controls, (FSRU Conversion)
GOLAR Golar Freeze Boiler Controls, (FSRU Conversion)

HÖEGH Norman Lady Boiler Controls , Feed Pump Control. LSMGO firing

NGSCO Al Khaznah Boiler Controls


NGSCO Ish Boiler Controls
NGSCO Shahamah Boiler Controls
NGSCO Gasha Boiler Controls

SOVCOMFLOT SCF Arctic Boiler Controls, Tank Pressure Controls,Compressor Controls


SOVCOMFLOT SCF Polar Boiler Controls, Tank Pressure Controls

4
Typical project steps
Onboard survey
– Current system is examined
– List of field equipment to be replaced is established (see slide further ahead)
– Areas of improvement are identified
– Report along with firm offer for upgrading is sent to customer

Supply & Engineering


– Engineering of system
– Submission of design approval to class
– Fabrication of complete system
– Factory acceptance test in presence of surveyor from class/owner.
– Training of officers on the new system
– Shipment

Installation Supervision
– Installation of system
– Installation of field equipment
– Installation of new cabling if required
continues on next slide..

5
Typical project steps continued....
Fuel Oil burning commissioning
– Fine tuning of process parameters once the boilers are in normal operation.
– Site acceptance test / Dock trials

Gas burning commissioning


– Gas burning commissioning as soon as gas firing is possible
– Dual Fuel / Gas only commissioning

Optimization of burning process


– Fine tuning of system done during first laden voyage
– Training of onboard crew

6
Critical field equipment scrutinized during onboard survey
Fuel oil control valve, actuator and positioner
Fuel gas control valve, actuator and positioner
Drum level control valve, actuator and positioner
Inlet vanes, actuator, linkage, flaps and positioner
Steam pressure and flow transmitters
Fuel (oil + gas) pressure and flow transmitters
Air flow transmitters
Drum level and flow transmitters
Oxygen analyzers
Atomizing steam pressure controls
Fuel oil pump pressure and temperature controls
Igniters
Flame scanners
Burner actuators: igniters, registers, fuel valves
Solenoid valves for burner actuators

7
P&ID for LSMGO change over

8
Boiler control panels in ECR and PLC-Cabinets

9
PLCs, I/O modules made for onboard arrangements

10
PLCs, I/O modules made for onboard arrangements

11
Turbine control with telegraph and HMI

12
Control functions in boiler control system

Texon Automation presentation 2009 13


Boiler Overview on HMI

Texon Automation presentation 2009 14


Burner Overview on HMI

Texon Automation presentation 2009 15


Burner Overview on HMI

Texon Automation presentation 2009 16


Burner Overview on HMI

Texon Automation presentation 2009 17


Burner Overview on HMI

Texon Automation presentation 2009 18


Burner Overview on HMI

Texon Automation presentation 2009 19


Burner Overview on HMI

Texon Automation presentation 2009 20


Burner Overview on HMI

Texon Automation presentation 2009 21


Burner Overview on HMI

Texon Automation presentation 2009 22


Burner Overview on HMI

Texon Automation presentation 2009 23


Burner Overview on HMI

Texon Automation presentation 2009 24


Burner Overview on HMI

Texon Automation presentation 2009 25


Burner Overview on HMI

Texon Automation presentation 2009 26


THANK YOU FOR YOUR ATTENTION!

Texon Automation presentation 2009 27