Professional Documents
Culture Documents
SPE
Sub-Supplier
Project
HAU GIANG BIOMASS POWER PLANT PROJECT
SPE
(2 x 10MW)
Prepared SARTAJ
Checked JOY
110m3 RICE HUSK BUNKER
Approved JOY
Discipline MEC
INDEX
1. Introduction ........................................................................................................................................ 3
2. Scope of the work .............................................................................................................................. 3
3. Reference Codes and Standards ...................................................................................................... 3
4. Materials ............................................................................................................................................ 3
5. Design Philosophy ............................................................................................................................. 3
6. Hopper Pressure Calculation ............................................................................................................ 4
7. Hopper Calculation ............................................................................................................................ 7
Design of Horizontal stiffener for Hopper _ 2.7 MTR LVL ......................................................................... 9
8. Basic Geometry of STAAD Model ................................................................................................... 28
• Layout, General Arrangement (Member Properties) ................................................................. 30
9. Unity Stress Ratio ............................................................................................................................ 32
2
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
1. Introduction
This Design Report explains the design of 110m3 Rice Husk bunker for Hau Giang Biomass Power
Plant Project. Bunker to be designed considering Welded construction with American codes and JIS/
American sections.
The objective of this document is to present analysis and design calculations of 110m3 Rice Husk. The
bunker is subject to internal vertical and horizontal loads.
CODE TITLE
4. Materials
5. Design Philosophy
Following design philosophy & assumptions have been used for analysis & design of 110m3 Rice Husk
Bunker.
a) The side wall and bunker hopper stiffeners are calculated using Roark’s stress strain.
c) The bunker is made of rolled JIS sections and it is load cell mounted bunker.
as per 3D snip,
vartical & horizontal
stiffners are also
modelled. have you
modelled plate of
bunker as well? if yes
then mentione that
also & show in 3D.
3
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
4
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
b= 5
H1 = 2.07
P1=0.5xH1xPhB
x' b= 0 m P2 =PhBxH2
H2 = 5.735 x'a = 0 m
P2 =0.5xPhCxH2
θ = 58
xb= 2.275 m
xa= 2.375 m
b= 5
a = 5.2 a1 = 0.45
b1 = 0.45
5
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
FILLING EMPTYING
Z xa xb xa' xb' az bz A U R=A/U Zof 1-e-Z/Zof Zoe 1-e-Z/Zoe Pw @z Ph @ Z Pv @ Z Pw @z Ph @ Z Pv @ Z
0.7 2.38 2.28 0.00 0.00 5.20 5.00 26.00 20.40 1.27 5.53 0.12 3.54 0.18 1.36 2.96 5.92 2.06 5.72 5.72
1.4 2.38 2.28 0.00 0.00 5.20 5.00 26.00 20.40 1.27 5.53 0.22 3.54 0.33 2.56 5.57 11.13 3.75 10.41 10.41
2.07 2.38 2.28 0.00 0.00 5.20 5.00 26.00 20.40 1.27 5.53 0.31 3.54 0.44 3.58 7.77 15.54 5.08 14.11 14.11
2.77 2.38 2.28 0.29 0.28 4.62 4.44 20.54 18.13 1.13 4.92 0.43 3.15 0.59 4.39 9.53 19.06 5.97 16.58 16.58
3.47 2.38 2.28 0.58 0.56 4.04 3.89 15.71 15.86 0.99 4.30 0.55 2.75 0.72 4.94 10.72 21.43 6.39 17.75 17.75
4.17 2.38 2.28 0.87 0.83 3.46 3.33 11.54 13.59 0.85 3.69 0.68 2.36 0.83 5.18 11.24 22.47 6.34 17.61 17.61
4.87 2.38 2.28 1.16 1.11 2.88 2.78 8.00 11.32 0.71 3.07 0.80 1.97 0.92 5.06 10.99 21.97 5.83 16.20 16.20
5.57 2.38 2.28 1.45 1.39 2.30 2.22 5.12 9.05 0.57 2.45 0.90 1.57 0.97 4.56 9.90 19.80 4.94 13.73 13.73
6.27 2.38 2.28 1.74 1.67 1.72 1.67 2.87 6.78 0.42 1.84 0.97 1.18 1.00 3.69 8.00 16.00 3.79 10.54 10.54
6.97 2.38 2.28 2.03 1.94 1.14 1.11 1.27 4.51 0.28 1.22 1.00 0.78 1.00 2.53 5.48 10.97 2.54 7.05 7.05
7.805 2.38 2.28 2.38 2.28 0.45 0.45 0.20 1.80 0.11 0.49 1.00 0.31 1.00 1.01 2.20 4.40 1.01 2.81 2.81
6
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
7. Hopper Calculation
Vertical Stiffners are placed at 1m c/c & Horizontal Stiffners are placed at 0.7m c/c
as shown in the drawing
Plate will act as two way supported Element, Supported Between Vertical & Horizontal Stiffners
Length of Plate = 1m
Vertical Stiffners are placed at , a = 1 m c/c
Horizontal Stiffners are placed at Clear span,b = 0.7 m c/c 0.625 0.70 0.75
Yield stress of Steel, Fy = 250 N/mm2 Mx 0.0765 0.0718 0.0686
a/b = 0.70 My 0.0547 0.055 0.0546
19 KN/m
1 /0.7
0.67 Knm
M σ
=
I Y
670000.0 1000 x d2
=
165.0 6
7
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
Allowable Deflection = 2t
= 16 mm > 1.1 mm
SAFE
8
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
19.00 Kn/m
5m
0.7
Check for C250X90X9
D= 250 mm
Area = 4407 mm2
Ixx = 41800000 mm4
Iyy = 2940000 mm4
Cxx = 125 mm
Cyy = 24 mm
Width of Flange, bf = 90 mm
Thickness of Flange, tf = 13 mm
Thickness of Web, tw = 9 mm
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
Calculation along XX Axis of Member
Yc = 168.5 mm
Yt = 89.5 mm
Ixx = 6.65E+07 mm4
Zxx Comp = 3.95E+05 mm3
Zxx Tension = 7.43E+05 mm3
9
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 39583333.33
3.95E+05
σ Actual= 100 N/mm2
Permissible Stresses
10
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
19.00 Kn/m
4.7 m
0.7
Check for C200X80X7.5
D= 200 mm
Area = 3133 mm2
Ixx = 19500000 mm4
Iyy = 1680000 mm4
Cxx = 100 mm
Cyy = 22.1 mm
Width of Flange, bf = 80 mm
Thickness of Flange, tf = 11 mm
Thickness of Web, tw = 7.5 mm
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
Calculation along XX Axis of Member
Yc = 143.4 mm
Yt = 64.6 mm
Ixx = 3.36E+07 mm4
Zxx Comp = 2.35E+05 mm3
Zxx Tension = 5.20E+05 mm3
11
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 34975833.33
2.35E+05
σ Actual= 149 N/mm2
Permissible Stresses
12
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
19.00 Kn/m
4.5 m
0.7
Check for C200X80X7.5
D= 200 mm
Area = 3133 mm2
Ixx = 19500000 mm4
Iyy = 1680000 mm4
Cxx = 100 mm
Cyy = 22.1 mm
Width of Flange, bf = 80 mm
Thickness of Flange, tf = 11 mm
Thickness of Web, tw = 7.5 mm
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
Calculation along XX Axis of Member
Yc = 143.4 mm
Yt = 64.6 mm
Ixx = 3.36E+07 mm4
Zxx Comp = 2.35E+05 mm3
Zxx Tension = 5.20E+05 mm3
13
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 32062500
2.35E+05
σ Actual= 137 N/mm2
Permissible Stresses
14
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
19.00 Kn/m
4.3 m
0.7
Check for C200X80X7.5
D= 200 mm
Area = 3133 mm2
Ixx = 19500000 mm4
Iyy = 1680000 mm4
Cxx = 100 mm
Cyy = 22.1 mm
Width of Flange, bf = 80 mm
Thickness of Flange, tf = 11 mm
Thickness of Web, tw = 7.5 mm
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
Calculation along XX Axis of Member
Yc = 143.4 mm
Yt = 64.6 mm
Ixx = 3.36E+07 mm4
Zxx Comp = 2.35E+05 mm3
Zxx Tension = 5.20E+05 mm3
15
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 29275833.33
2.35E+05
σ Actual= 125 N/mm2
Permissible Stresses
16
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
19.00 Kn/m
4.1 m
0.7
Check for C200X80X7.5
D= 200 mm
Area = 3133 mm2
Ixx = 19500000 mm4
Iyy = 1680000 mm4
Cxx = 100 mm
Cyy = 22.1 mm
Width of Flange, bf = 80 mm
Thickness of Flange, tf = 11 mm
Thickness of Web, tw = 7.5 mm
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
Calculation along XX Axis of Member
Yc = 143.4 mm
Yt = 64.6 mm
Ixx = 3.36E+07 mm4
Zxx Comp = 2.35E+05 mm3
Zxx Tension = 5.20E+05 mm3
17
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 26615833.33
2.35E+05
σ Actual= 113 N/mm2
Permissible Stresses
18
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
19.00 Kn/m
3.9 m
0.7
Check for C200X80X7.5
D= 200 mm
Area = 3133 mm2
Ixx = 19500000 mm4
Iyy = 1680000 mm4
Cxx = 100 mm
Cyy = 22.1 mm
Width of Flange, bf = 80 mm
Thickness of Flange, tf = 11 mm
Thickness of Web, tw = 7.5 mm
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
Calculation along XX Axis of Member
Yc = 143.4 mm
Yt = 64.6 mm
Ixx = 3.36E+07 mm4
Zxx Comp = 2.35E+05 mm3
Zxx Tension = 5.20E+05 mm3
19
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 24082500
2.35E+05
σ Actual= 103 N/mm2
Permissible Stresses
20
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
19.00 Kn/m
1m
0.7
Check for C150X75X6.5
D= 150 mm
Area = 2371 mm2
Ixx = 8610000 mm4
Iyy = 1170000 mm4
Cxx = 75 mm
Cyy = 22.8 mm
Width of Flange, bf = 75 mm
Thickness of Flange, tf = 10 mm
Thickness of Web, tw = 6.5 mm
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
Calculation along XX Axis of Member
Yc = 113.4 mm
Yt = 44.6 mm
Ixx = 1.58E+07 mm4
Zxx Comp = 1.39E+05 mm3
Zxx Tension = 3.54E+05 mm3
21
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 1583333.333
1.39E+05
σ Actual= 11 N/mm2
Permissible Stresses
22
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
19.00 Kn/m
0.55 m
0.7
Check for C150X75X6.5
D= 150 mm
Area = 2371 mm2
Ixx = 8610000 mm4
Iyy = 1170000 mm4
Cxx = 75 mm
Cyy = 22.8 mm
Width of Flange, bf = 75 mm
Thickness of Flange, tf = 10 mm
Thickness of Web, tw = 6.5 mm
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
Calculation along XX Axis of Member
Yc = 113.4 mm
Yt = 44.6 mm
Ixx = 1.58E+07 mm4
Zxx Comp = 1.39E+05 mm3
Zxx Tension = 3.54E+05 mm3
23
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 478958.3333
1.39E+05
σ Actual= 3 N/mm2
Permissible Stresses
24
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
For Vertcal Plates Stiffners will be mainly design for Internal design Pressure
Length of Stiffner = 1m
Stiffners are placed at 1 m c/c
Maximum Design Load = 19 KN/m2
19 Kn/m
1m
Plate Thk. = 8 mm
Plate Width = 280 mm =35T
25
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
σ = M/z = 700000
1.96E+05
σ Actual= 4 N/mm2
Permissible Stresses
26
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
27
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
28
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
3D Rendered View
29
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
30
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
FRAME ARRANGEMENT
31
CLIENT : EPC CONTRACTOR :
HAU GIANG BIOENERGY JOINT PECC2
STOCK COMPANY
JOB NO.: UE-742 STRUCTURAL BOM FOR BOILER-1 DATE: 01-09-2023
Can be optimised
further.
32