Design of Footbridges

Dutch solutions for bicycle and pedestrian bridges

Adriaan Kok • ipv Delft & The Netherlands


ipv Delft creative engineers • Dutch Design Manual for Footbridges

mail: adriaankok@ipvdelft.nl • Dutch Regulations for Footbridges


website: ipvdelft.nl or ipvdelft.com • Dutch Design drivers & solutions
8th Australian Small Bridges Conference • Lessons Learned
27-28 Nov 2017, Surfers Paradise Australia
bridges
ipv Delft
• infrastructure
• urban furniture
• architecture
• lighting
footbridge footbridge aquaduct

bench footbridge footbridge tunnel

canopy footbridge lamp shade bicycle parking


bridges
ipv Delft
• Footbridges
CROW publication 342 Summary CROW publication 342
Dutch, by ipv Delft English, by ipv Delft

BRIEF DUTCH DESIGN MANUAL FOR BICYCLE AND PEDESTRIAN BRIDGES


BRIEF DUTCH
BRIEF DUTCH DESIGN MANUAL DESIGN MANUAL
FOR BICYCLE AND PEDESTRIAN BRIDGES FOR BICYCLE
As one of the Netherland’s main bridge design offices, ipv Delft has focused on
designing bicycle and pedestrian bridges for two decades. The company has used
their extensive experience in bridge design to write this publication. This design
AND PEDESTRIAN
manual focuses on the fundamentals of bridge design, answering practical questions
regardign issues such as bridge width and slopes. It also lists the things that should
be taken into account before starting on the actual design and it offers insight in
BRIDGES by ipv Delft
the Dutch regulations regarding loads and collision forces. General advice on cost re-
duction is also included and several of the company’s projects are shown to illustrate
the theoretical contents. The Brief Dutch Design Manual for Bicycle and Pedestrian
Bridges therefore is a vital source of both practical information and bridge design
inspiration.

This publication is an English summary of the Dutch Design Manual for Bicycle and
Pedestrian Bridges, which was published by CROW in 2014 and written by ipv Delft.

www.ipvdelft.com
www.crow.nl

ipv Delft creative engineers


+31 15 750 25 75
info@ipvdelft.nl

in cooperation with
Free Download:
ipvdelft.com / publications

Dutch Design Manual


Structure: Follows the Development Process

Traffic Network
Analysis of
Context
Requirements
Users

Design Checklist

Alignment
Design
Bridge Design
Development
Budget

Dutch Design Manual


Structure: Follows the Development Process

Traffic Network Why


Analysis of
Context
Requirements
Users For Whom

Design Checklist

Alignment
Design
Bridge Design
Development
Budget What

Dutch Design Manual


Intended Users: All involved disciplines & stakeholders

• Management
• Urban Planning
• Architects

BRIEF DUTCH DESIGN MANUAL FOR BICYCLE AND PEDESTRIAN BRIDGES


• Structural engineering BRIEF DUTCH
DESIGN MANUAL
• Traffic engineering
BRIEF DUTCH DESIGN MANUAL
FOR BICYCLE AND PEDESTRIAN BRIDGES FOR BICYCLE
As one of the Netherland’s main bridge design offices, ipv Delft has focused on
AND PEDESTRIAN
• Maintenance
designing bicycle and pedestrian bridges for two decades. The company has used
their extensive experience in bridge design to write this publication. This design
manual focuses on the fundamentals of bridge design, answering practical questions
regardign issues such as bridge width and slopes. It also lists the things that should
be taken into account before starting on the actual design and it offers insight in
BRIDGES by ipv Delft
the Dutch regulations regarding loads and collision forces. General advice on cost re-
duction is also included and several of the company’s projects are shown to illustrate

• Contractors
the theoretical contents. The Brief Dutch Design Manual for Bicycle and Pedestrian
Bridges therefore is a vital source of both practical information and bridge design
inspiration.

This publication is an English summary of the Dutch Design Manual for Bicycle and
Pedestrian Bridges, which was published by CROW in 2014 and written by ipv Delft.

• Advocates
www.ipvdelft.com
www.crow.nl

ipv Delft creative engineers


+31 15 750 25 75
info@ipvdelft.nl

• Local stakeholders

in cooperation with

Dutch Design Manual


Intended Goal: Create Understanding
Between representatives of Technical & Social requirements

City
Officials
(social)

we
try

sho
we

u
ld !
Design(er)

we
tr
!

y
do

(technical)
(social)

(City) Citizens
Engineers Advocates
can’t we ? we try
(technical) (social)

Dutch Design Manual


Involvement of disciplines & stakeholders: De-Siloing the Process
Analysis of Requirements Design Development
Client Network Context Users Checklist Alignment Design
Management      
Engineering      
Traffic      
Urban planning      
Lighting     
Maintenance     
Consultants
Engineer      
Architect      
Subsoil    
Local
Businesses     
Citizens     
Advocates    
Contractor 

Dutch Design Manual


Structure: Follows the Development Process

Traffic Network
Analysis of
Context
Requirements
Users

Design Checklist

Alignment
Design
Bridge Design
Development
Budget

Dutch Design Manual


The Netherlands
UK
Germany

France

Ita
ly
Spain

Context (international) The Netherlands in Europe


The Netherlands Australia
17 mln inhabitants 23.4 mln inhabitants

Context (international) The Netherlands compared to Australia


Sydney

307 km
Amsterdam

m
km

Rotterdam

0k
24
60

Canberra
Germany
Belgium

Context (national) The Netherlands compared to Sydney - Canberra Region


Sydney

Amsterdam

Rotterdam

Canberra

Meuse Rhine

Network (national) Dutch network compared to Sydney - Canberra Region


Network (national) transport over water and road
Network (international) The Netherlands, a hub for Europe
Foundation Piles
almost always
required
-4m
+8m

-7m

10 - 20 m
+ 10 m

• Marshy River Delta


peat, clay & sand
+ 322 m
26% below sea level

Context (national) ground level and subsurface conditions


1995 flood

Flood Risk Areas


26% below sea level
29% above sea level
risk of flooding by river

Context (national) flooding risk


- 15 ºC in Winter + 35 ºC in Summer

Context (national) 50 ºC temperature difference


Natural Constraints Exploring the world

Limited Resources Open to new ideas

Context (national) resourcefull by constraints


Travel Time bike & car
equal up to 7.5 km
15
km
ch
Bea

7.5 km

Amsterdam
rt
po
Air

Network (regional) travel time in dense populated areas


8 mln people
with all needs within
cycling distance

Amsterdam

Rotterdam

Eindhoven

Network (national) travel time in dense populated areas


Dutch King

• 18 million bikes
• > 14 million trips / day
• 35.000 km bike path

• 2500 km highway
• 8 million cars

Network (national) Cycling Facts


Network (national) need for a lot of bridges
Users
Not intended
Not intended vehicle,
Hooligans, ...
Determine
• Needed Space
• Road Planning
Regular
• Loads Occasionally
Cyclists, Pedestrians,
• Abuse Mopeds, Disabled vehicles Maintenance,
Prevention Emergency
Services

Special
Other
Disabled, Elderly,
Utility
Children
companies
...

Users all potential users


bridges
Users
bridge &
Intersecting
for a footbridge
crossing a road regular regular regular

special special special occasional

not intended not intended not intended other


75 cm 25 - 80 cm 25 cm
width sway distance

2,5 m vertical
clearance

Users cyclists measurements


32.5 cm 62.5 cm
railing wall

50 cm
extra width in curve

Users cyclists distance to objects


Deck Width Hovenring two lanes - two directions

cm 32.5 75 25 75 25 75 25 75 32.5
4.4 m

Users cyclists deck width


minimum width one way minimum width two way in curve

32.5 75 32.5 cm 32.5 50 75 25 75 32.5 cm

1.4 m 2,9 m

Users cyclists deck width


0,7 m 0,8 m 0,85 m

Users pedestrians measurements


max. 20 m max. 0.5 m

≥ 0,9 m

≥ 1,8 m ≥ 1,2 m

≥ 0,9 m

Users pedestrians deck width


∆ H > 13 m Railing min. 1.2 m →
∆ H 1-13 m Railing 1 m →
stairs & slopes min. Railing 0.85 m →

Australia (hand) railing height


pedestrians 1.2 m
cylists 1.4 m
disabled, children 0.7 m

Users railing height


Dutch Fx, Fy 3 kN/m
Australia Fx, Fy ? 0.75 - 3 kN/m (crowds)
Openings < 0.1 m (wire) - 0.125 m
Fy Fx
< 0.1 m

Ø 0.5 m

Users railing openings and loads


ipv Delft
• railing designs
type & infill

wire wire cable mesh

glass wood lamellas bars - balusters

structural structural structural decorative


Railing height ? Railing 1 & 1.4 m Railing 0.7, 1.2 & 1.4 m ?
cyclists cyclists
pedestrians pedestrians
children

1.4 m
1m
J. Pesch Bridge, Brisbane Toowong Crossing, Brisbane Proprietary Barrier Cairns

Users Australian railing examples


Users unintended use - climable railing
inward inclined wires cable mesh near petting zoo

Users unintended use - climable railing


standard anti-throw-screen

2.5 m

Users unintended use - anti-throw-screen


integrated stainless steel cable mesh anti-throw-screen

Users unintended use - anti-throw-screen


Concentrated Load 7 kN
0n surface of 0.1 x 0.1 m

Uniformly Distributed Load 5 kN/m² (5 kPa)


Reduction allowed using formula:
Uniform load = 2.0 + (120/bridge length +30) kPa
Allowed when no crowds are expected. With minimum of 2.5 kPa

Users pedestrians & cyclists loads


Maintenance Vehicle specifications
• 2 axles with a 3 m wheelbase;
• Axle load of 25 kN (2500 kg);
• 2 wheels / axle, with a 1.75 m track width;
• 0,25 m x 0,25 m contact surface / wheel.

Users standard maintenance vehicle loads


• 9 metric tons maintainance vehicle - Hovenring

Users Heavy maintenance vehicle loads


Unauthorized Vehicle specifications:
• 2 axles with a 3 m wheelbase
• Characteristic axle load of 40 kN & 80 kN
• 2 wheels per axle, with a 1,3 m track width
• 0,2 m x 0,2 m contact surface per wheel.

Users Unauthorized vehicle loads


min. 4.6 m - 7 m (no collision load)
vertical clearance

Users vertical clearance car traffic


Road Collision Load on Bridge Deck (Fdx) Eurocodes Dutch appendix
Highways 500 kN 2000 kN
Roads outside urban areas 375 kN 1500 kN
Roads within urban areas 250 kN 100 kN
carparks 75 kN 100 -200 kN
loads for bridges for all traffic types

Collision Load Reduction for


Clearances > 4.8 m
Collision Load reduces lineairly
4.8 m 100%
7.0 m 0%

Users collsion loads by car traffic on the bridge deck


Road Collision Load on Supports (Fdx) Eurocodes Dutch appendix
Highways 1000 kN 2000 kN
Roads outside urban areas 750 kN 1500 kN
Roads within urban areas 500 kN 1000 kN
carparks 50-150 kN 100 -200 kN

No Collision Load when


Distance support - axis closest lane
Highways > 20 m
Roads outside urban areas > 15 m
Roads wthin urban areas > 10 m
carparks > 5 m

Users collsion loads by car traffic on supports


Collision Loads Commonly used Signage Portals
Collision Loads Custom designed Anti-Collision Portals
Think Filter !

Collision Loads Anti-Collision Portals proven usefull


5.5 - 12 m vertical clearance

Users vertical clearance commercial vessels


30 m vertical clearance

Users vertical clearance sailing ships


Users sailing in the Netherlands
Alignment movable bridges to prevent large height differences
7.5 - 8.5 m vertical clearance

Users vertical clearance railroads


Ramp Success Factors
• Height Difference
• Grade
• Directness
• Alternatives
• Flat Stretches

Users - Alignment ramp success factors


Reducing Height Difference
• Minimize structural deck height
• Lowering crossed area

lowered intersection

Users - Alignment reducing Height Difference


Ramp Grade
11%
Ramp Difficulty: Z = H²/L
10%
9%
target normal
8% circumstances
7%
less wind nuisance
6% less comfortable
5%
4%
Max. Z = 0.2
3%
more wind nuisance
2% more comfortable
1%
Target Z = 0.075 Min. Z = 0.033
0 1 2 3 4 5 6 7 8 9 10
average grade (%) height (m)

Users - Alignment ramp grade


Directness, Alternatives, Flat stretches

95m 5.8%
265m, 2.1%

190m 2.9%

225m, 2.4%
200m 2.8%

25 m Flat stretches 105m 5.2%


• over 3 -5 m height
• in bends in ramp
• at end of ramp

Users - Alignment directness, alternative routes, flat stretches


Structure: Follows the Development Process

Traffic Network Why


Analysis of
Context
Requirements
Users For Whom

Design Checklist

Alignment
Design
Bridge Design
Development
Budget What

Dutch Design Manual


Traffic Network
Finding the best bridge location

Analyse
• Network demand


- regular users
- number of users
A
• Route restrictions A’
• Adjacent route (A’, B’) B’

Dutch Design Manual


Network as Design Driver
dge
Bri
Ro
ad n t
me
alig
d
l r oa
i a
r t er
A

Hig
hw
ay
A
Cycle Network

2
Utilitarian
Recreational

Eindhoven Highway bridge Traffic Network - Alignment


e
r i dg
d B
a
Ro e
t i ng r i dg
i s B
Ex in g
xist
E
ing
en
0
43
118

d
Wi

New Bridge over On Ramp

350
1
25.60

talud 1:2

6189
50

d
3% R162

36728
oa
1981
6

al R
25.09

e r i
Art

Hig
19.81

0
350
New On Ramp
2
24.10

hw
544
19.40

R14
topboog
= R3000

24.50

ay
24.40

A
27.75+

2
24.15

621
8
R17
500

750
R148250

24.00
500

63
557
500
3500

19.68
0

350
500

R10885

19.79
58655
36292

19.54

20.99

LANGSDOORSNEDE
SCHAAL 1:100
Slagboom novotel op basis luchtfoto

Eindhoven Highway bridge Alignment by Traffic Engineers


19.30
20.79

19.10
Existing Road Bridge

Widening Existing Bridge

Eindhoven Highway bridge Existing Road Bridge


0

dge
43
118

Proposed Alignment ge ri
B rid ting
b
g xi s
• 5 Radii 16, 17, 108, 115, 145 m t in e
x is in g
• Varying Width 3.5 - 6.2 m E i d en
w
• Span Lenght ?

350
1
25.60

talud 1:2

Hig
6.2 m

h
6189

wa
50

16 m
3% R162

36728
1981
6

A2
25.09

a d
l Ro
e r ia 19.81

0
Ar

350
2
24.10

544
m
n Ramp
19.40

R14
topboog
= R3000

3.5 m
New O

145
24.50

24.40

27.75+
24.15

17 m
621
8 6.2 m

R17
500

750
R148250

4.00
500

63
108 m
115 m

557
500
3500

3.5 m 0
0

350
500

R10885

58655
36292

3.5 m

Eindhoven Highway bridge Analysis Proposed Alignment 1


20.99

SNEDE Slagboom novotel op basis luchtfoto

20.79
19.30
*
* *
*

*
e
*
*

g
ge

*
d
*
*

Optimized Alignment r i
*
*

*
d b
*
* ASLIJN TRACE

Bri

*
*
*

g
*
*

n
ix sti

*
*
* *
*

*
*
*
Using Grasshopper plugin for Rhino
in

*
*
*

e
ist
*
*

ng

*
*
*

Ex eni
*
*

*
• 2 Radii
*
*

*
*
*

wid
19, 130 m
*
*

*
*
*

*
*
* * VOEG OVERGANG VIADUCT

*
*
*

• 1 Width 4.5 m
*
*

*
*
*

*
*
*

*
*
*
*

*
• 1 Span Lenght 17 m
*

*
*
Overgang bestaand viaduct (KW8) naar nieuwe brug,
nieuw tracé over toerit (KW7)

*
Start overgang van lessenaars- naar dakprofiel

*
WERKGRENS
*

*
Positie landhoofd brug over toerit (KW7)

* Uitvoering nader te detailleren.

*
eg

Hig
* VOEG

w *

*
er
BRUG OVER OPRIT - AANLANDING

*
k k *

*
Fo *
*
ny

*
ho *

h
t

*
*
An

19 m
*

wa
R19120

*
*

*
*

17 m

*
*

*
*
eg *

A2
*
w *
er 25.09

*
kk *

*
Fo *

*
y *
on

*
*

*
th

ad
*
An

*
*
*

*
o

*
*

*
*

*
l
*

*
a

*
*

eri

*
* 19.81

*
*

*
Art

*
*
* 24.10

*
*

4.5 m

*
19.40

*
*

p
topboog

am
* = R3000

*
R
*

O n

* *

*
*

New
24.50 *

*
Eventueel benodigde afscherming van
steunpunten langs toerit nader detailleren.

*
*

* * *
24.40 * R19120

*
*

*
*
*

*
*
*

* *

*
*
R130000
*

*
24.15
ASLIJN TRACE
*

*
*

19 m *

*
* *
Positie landhoofd brug over toerit (KW7)

*
Uitvoering nader te detailleren

*
*
Onderzijde steunpunt, poer of positie watergang

* *
zo uitwerken dat de beoogde functionaliteit
van de watergang is gewaarborgd.

*
*
*
*

24.00

*
*
*

130 m

*
4.5 m

*
*
* * *

*
17 m
*

* * * * * *

*
*

* * * * * *
*

* * *

*
* * *

*
* * * * *
*

* * *

*
17 m
* *
*

* WERKGRENS *
*

* * *
*

*
* * * * *
* *
*

*
* * * * * *
*
19.5
*

* *

17 m
*

* * * * * * *
*

*
*
*

*
*
**
*

EINDE BESTAANDE BRUG


106.07
ARAMETERS IN FUNCTIE VAN DE COORDINATEN NIVEAU BRUGDEK
ANGS DE ASLIJN [m] NAP [m]

Eindhoven Highway bridge Optimized Alignment 1


HOOGTE HANDREGEL
NOORD
H1a [m]

HOOGTE HANDREGEL
ZUID
H1b [m]

HOOGTE BOVENREGEL
NOORD
H2a [m]

HOOGTE BOVENREGEL
ZUID
business area

entre sroad
city c acces

ad
s ro
s
ce
ac

Enschede Bridge Context


Business Area

Visibillity

Visibillity
New Bridge Old, Characteristic Trees

City Centre

Enschede Bridge Context - Alignment Constraints


bridge position

required height 4,6m traffic lights


line of sight

low traffic
light
2,5

stopping distance stopmarker

R 75 m (5x)
R 180 m (5x)

Enschede Bridge Final Alignment


prefab deck
1 pier type

Enschede Bridge Modular Construction


Facts & Figures
• bridge length 280 m
• ramp length 150 m
• width 3.5 m
• lightingelement
• budget: €2.0 million
• costs: €1.4 million

Enschede Bridge Facts & Figures


g e
B rid
a d dg
e
g Ro B r i
in ting
ist xis
Ex g E
nin
i de
W

Hig
hw
d

ay
a
Ro

Ne
l

A2
ia
ter

w
Ar

On
Ra
m p
New Bridge over On Ramp

Eindhoven Highway bridge Optimized Alignment 1


Only Railing
DROON
Highest Point Anti-Throw-Screen
DIUZ

20º
4.5 m

ZUID NOORD
3m

a2H

b2H
α α

α α
1.2 m
H2b

H2a
H1b

H1a
a1H

b1H
PAN KEDGURB VIN NIV BRUGDEK NAP
GNIDRAHREV .K.B B.K. VERHARDING

grating
0.8 m

stainless steel edge element prefab concrete deck integrated lighting anti-throw-screen
( cable mesh infill )

Eindhoven Highway bridge Deck Principle On Ramp Bridge


DZUID
ROON NOORD
DIUZ
ZUID NOORD

* anti-throw-screen ( cable mesh infill )


*
78
4.54579
m 78
336 750 250 750 250 750 250 750 337

prefab barrier with


2.8 m lighting element
H2b

α
H1b

H1a
NIV
B.K. VER

reused
existing
cladding

new prefab concrete girders widened existing road bridge

Eindhoven Highway bridge Deck Principle Widened Existing Bridge


adaptive Anti-Throw-Screen

1 pier type

only high where required

Eindhoven Highway bridge Impressions


in height changing Anti-Throw-Screen

Eindhoven Highway bridge Impressions


Existing Guide rail

Cladding Existing Bridge

Cladding & Barrier


with illuminated
translaucent panels

Eindhoven Highway bridge Impressions


Cylists increase Waiting Time Cars

g e
B rid
a d dg
e
g Ro B r i
in ng

Exi
ist ti
Ex Exis

stin
g
nin
de

g
Wi

Of R
mpa
Hig
hw
d

ay
a
Ro

Ne
l

A2
ia Vertical Clearance
ter

w
Ar

On
• On Ramp +5 m

Ra
• Highway +7 m

m p
New Bridge over On Ramp

Eindhoven Highway bridge Possible improvements of the alignment


Network as Design Driver
dge
Bri
ad t 1
Ro
m en
alig
d
l r oa
i a 2
r t er en
t
A m
alig

Cycle Network
Utilitarian
Recreational

Hi
gh
wa
yA
2
Eindhoven Highway bridge Traffic Network Analysis - Alignment Options
Arterial Road Existing Road Bridge

Of Ramp
No Cyclists using

New
Traffic Lights
140 m

arian
Utilitari

Existing
On R

Utilit
amp
an

Recreational

tional
c r e a
Re Nearby Construction Site

Highway A2

arian
Utilit

Eindhoven Highway bridge Traffic Network Analysis - Alternative Alignment


60000 40000 60000

Arch Bridge PROJECT


Modular Truss Bridge 2000

EHN.20 FIETSVERBINDING ANTHONY FOKKERWEG-A2/N2


OPDRACHTGEVER
GEMEENTE EINDHOVEN
ONDERDEEL
AANZICHT CONCEPT 1
TEKENINGNUMMER DATUM VERSIE STATUS
EHN.20.SO.TEK.01 2.05.2017 0.9 CONCEPT PROJECT
GETEKEND SCHAAL EENHEID FORMAAT EHN.20 FIETSVERBINDING ANTHONY FOKKERWEG-A2/N2

4000
AANZICHT
SCHAAL 1:500
WW 1:500 MM A3 OPDRACHTGEVER
GEMEENTE EINDHOVEN
ONDERDEEL
Oude Delft 39 2611 BB Delft 015 750 25 75 info@ipvdelft.nl
V:\4_projecten\EHN.20_brug_A2-N2_Eindhoven\2_tekeningen\1_SO\DWG\EHN.20_2D-TEKENINGEN_v07(WW).dwg
AANZICHT CONCEPT 3
TEKENINGNUMMER DATUM VERSIE STATUS
4995 EHN.20.SO.TEK.03 2.05.2017 0.9 CONCEPT
8000 GETEKEND SCHAAL EENHEID FORMAAT
WW 1:500 MM A3

Oude Delft 39 2611 BB Delft 015 750 25 75 info@ipvdelft.nl


V:\4_projecten\EHN.20_brug_A2-N2_Eindhoven\2_tekeningen\1_SO\DWG\EHN.20_2D-TEKENINGEN_v07(WW).dwg

55291

A-symmetrical Cable-stayed Bridge


PROJECT
EHN.20 FIETSVERBINDING ANTHONY FOKKERWEG-A2/N2
OPDRACHTGEVER
GEMEENTE EINDHOVEN
ONDERDEEL
Symmetrical Cable-stayed Bridge PROJECT

AANZICHT CONCEPT 2 EHN.20 FIETSVERBINDING ANTHONY FOKKERWEG-A2/N2


TEKENINGNUMMER DATUM VERSIE STATUS OPDRACHTGEVER

EHN.20.SO.TEK.02 2.05.2017 0.9 CONCEPT GEMEENTE EINDHOVEN


ONDERDEEL
GETEKEND SCHAAL EENHEID FORMAAT
AANZICHT AANZICHT CONCEPT 5
SCHAAL 1:500
WW 1:500 MM A3
TEKENINGNUMMER DATUM VERSIE STATUS
EHN.20.SO.TEK.01 02.05.2017 0.9 CONCEPT
Oude Delft 39 2611 BB Delft 015 750 25 75 info@ipvdelft.nl GETEKEND SCHAAL EENHEID FORMAAT
AK 1:500 MM A3 (420x297)
V:\4_projecten\EHN.20_brug_A2-N2_Eindhoven\2_tekeningen\1_SO\DWG\EHN.20_2D-TEKENINGEN_v07(WW).dwg

Oude Delft 39 2611 BB Delft 015 750 25 75 info@ipvdelft.nl

Eindhoven Highway bridge Alternative Alignment - Bridge Options


V:\4_projecten\EHN.20_brug_A2-N2_Eindhoven\2_tekeningen\1_SO\DWG\EHN.20_2D-TEKENINGEN_v06(WW)(AK).dwg
Facts & Figures
• length main span 104 m
• lenght ramps 660 m
• width 5 m
• costs bridge € 1.5 million euro
• total costs € 8.2 million euro

Eindhoven Highway bridge Arch Bridge


Eindhoven Highway bridge Modular Truss Bridge
4469

2000

750 250 750 250

2795
811
3750

1090
492

TOELICHTING
- OP DEZE TEKE
IPV DELFT
- DEZE TEKENIN
- PRODUCTIETEK

5500 -
WORDEN VOOR

ALLE MATEN
- PEILMATEN IN
- GRADEN IN HE
- COORDINATEN

PROJECT
GRA.01.Haal

Eindhoven Highway bridge Modular Truss Bridge


OPDRACHTGEVER
Provincie Fl
ONDERDEEL
AANZICHTEN
TEKENINGNUMME
IPV.00.VO.TE
Eindhoven Highway bridge Alternative Alignment - Cable-stayed Bridge
Advantages Arch Bridge
• Structurally / Cost Efficient
• No Piers in Highway
- No obstruction of sightlines
- Less hindrance due to construction

131.5 m

Eindhoven Highway bridge Arch Bridge


Eindhoven Highway bridge Arch Bridge
Eindhoven Highway bridge Arch Bridge
Facts & Figures
• length main span 104 m
• lenght ramps 660 m
• width 5 m
• costs bridge € 1.5 million euro
• total costs € 8.2 million euro

Eindhoven Highway bridge Arch Bridge Reference


Grashopper Optimized Ramps

Eindhoven Highway bridge Ramps Arch Bridge Reference


hoogteverschil: ca. 8 meter
lengte: ca. 288 meter
Eindhoven Highway bridge Arch Bridge Reference
Cables / Rods

5m
5000

3750

625 750 250 750 250 750 250 750 625

1.2 m

VERHOOGDE SCHAMPKANT

GEÏNTEGREERDE
VERLICHTING
CA. 200
N.T.B.

0,65 m
DOORSNEDE
AL 1:20
Concrete Deck Steel Edge Girders
PROJECT
EHN.20 FIETSVERBINDING ANTHONY FOKKERWEG

Eindhoven Highway bridge Arch Bridge - Deck Cross Section


OPDRACHTGEVER
GEMEENTE EINDHOVEN
ONDERDEEL
PRINCIPE DEKDOORSNEDE MET VERHOOGDE SCHA
Eindhoven Highway bridge Arch Bridge - Details Bridge Deck
Wishbone Configuration Leaning Arches Configuration
under construction under design

Eindhoven Highway bridge Arch Bridge - Structural Optimization (Grashopper)


Narrowing Deck Grashopper model

Straight Deck Grashopper model

Eindhoven Highway bridge Arch Bridge - Structural Optimization


Vertical Cable Alignment

Crossed, Netted Cable Alignment

Eindhoven Highway bridge Arch Bridge - Structural Optimization


Other Cable Alignments

21.1 m (1/6 L)

Arch Height

Eindhoven Highway bridge Arch Bridge - Structural Optimization


Eindhoven Highway bridge Arch Bridge
hand rail with Integrated Lighting

Infill - Stainless Stteel Cable Mesh

Extra High Curb / EdgeSCHAMPKANT


VERHOOGDE (0.2 m)

Integrated Arch Illumination


GEÏNTEGREERDE
VERLICHTING

CA. 200
0,2 m

N.T.B.
2%

0,3 m

0,65 m
Potential Damper

Eindhoven Highway bridge Arch Bridge - Details Edge Girder & Railing
Eindhoven Highway bridge Arch Bridge - Railing Infill
Eindhoven Highway bridge Arch Bridge - Anti-Throw-Screen
Eindhoven Highway bridge Arch Bridge - Arch illumination
Eindhoven Highway bridge Arch Bridge - Arch illumination
Eindhoven Highway bridge Arch Bridge - Arch illumination
hand rail with Integrated Lighting,
Wiring & fixation Points
top cable - Stainless Cable

Eindhoven Highway bridge Arch Bridge - Details Railing


custom aluminium extrusion profile

LED deck lighting fixation point LED facial lighting

Eindhoven Highway bridge Arch Bridge - Handrail Principle Hovenring


Eindhoven Highway bridge Arch Bridge - Handrail Principle Hovenring
Eindhoven Highway bridge Arch Bridge - a Solution for All Requirements
a
Se
rth
No

7.5 km
Rijswijk The hague

recreational
route

Rijswijk Swing Bridge Network Analysis


Schie Canal

Rijswijk

3
Ha
rb
ou
r 4

A 4
ay
h w
i g
H The Hague
1

Rijswijk Swing Bridge Possible bridge locations in the context


Location 1: Fixed arch bridge
• preferred by department of waterways • ramps of 300 at 3.5% needed
• required vertical clearance of 7 m • estimated costs € 4 million

bikepath
tramtrack & road

bikepath/road
%
3,5

A 4
ay 7m
h w
hig
%
3,5

highway A4

Rijswijk Swing Bridge Possible bridges in the context


Location 2: Double drawbridge

• connects directly to existing routes • short steep 2.5 m high ramps


• no supports and fenders in waterway • estimated costs € 6 million

harbour entrance

3m

existing
bikepaths

Rijswijk Swing Bridge Possible bridges in the context


Location 3: Asymmetric cable-stayed swing bridge

• less susceptible to windforces • ramps partly integrated in embankment


• supports and fenders in waterway • estimated costs € 4 million

3m

Rijswijk Swing Bridge Possible bridges in the context


Location 4: Symmetric cable-stayed swing bridge

• bridges both canal and harbour entrance • ramps partly integrated in embankment
• lot of supports and fenders in waterway • estimated costs € 5.5 million

3m

obsolete
bridge

Rijswijk Swing Bridge Possible bridges in the context


Preferred concept
• direct connection between existing routes
• minimal hindrance during construction
• estimated costs acceptable

RijswijkSwing
Rijswijk bridgeBridge
swing bridge at location
Concept 3
evaluation
ramps (H: 1.7 m)
integrated in route
turning space

RijswijkSwing
Rijswijk swingBridge
bridge Bridge
rampdesign
design
3m

21 m

Rijswijk Swing Bridge Bridge design


Rijswijk Swing Bridge Bridge design
Pivot Point

Gear
Unit

Counter Weight
Maintenance
Platform

Rijswijk Swing Bridge Bridge design


Maintenance
Platform

Rijswijk Swing Bridge Bridge design


Facts & Figures
• length 110 m
• width 3,5 m
• costs: €2.4 million

Rijswijk swing Swing


Rijswijk bridge Bridge
result, facts & figures
Result
Traffic Network
Finding the best bridge location

Analyse
• Network demand


- regular users
- number of users
A
• Route restrictions A’
• Adjacent route (A’, B’) B’

Dutch Design Manual


Traffic Network: Start with the Crossings

Because Crossings are: A


• Hard to Integrate
• Hard to Upgrade
• Advertisers / Kickstarters
• Gapclosers

Dutch Design Manual


Context
Location specific requirements & potential benefits

Analyse
• Urban Planning
A
• Local Wishes
A’
• Ecology
• Land Ownership
B’
• Cables and Pipelines
• Subsurface Conditions
• Potential Benefits
B

Dutch Design Manual


Context as Driver

prefab deck
1 pier type

Enschede Bridge Modular Construction


Context as Driver

visibillity spare visibillity


commercial characteristic traffic
buildings trees lights

Enschede bridge Meandering Alignment Fitting in the Context


voor: Gemeente Heerhugowaard ontwerp ipv Delft © 2012

Heerhugowaard Station bridge Alignment Fitting in the Contect


Possible main span materials bonus
• steel no bonus
• stainless steel € - 125.000,-
• high performance concrete € - 175.000,-
• fiber re-inforced composite € - 175.000,-

main span contour

Heerhugowaard Station bridge Main Span Contour - Optimal Materials


Facts & Figures
• bridge length 154 m
• ramp length 120 m
• width 3.5 m mainspan, 4m straight slopes, 6 m corners
• costs: €1.7 million

Main Span Ramps


High Performance Concrete On Site Concrete

Heerhugowaard Station bridge Maintenance Free Main Span


Haarlem submerged bridge Context
required height 2.5 m

rain water pump

Haarlem submerged bridge Cross Section


Facts & Figures
• length 110 m
• width 5 m
• slope < 4%
• costs: €1.1 million

Haarlem submerged bridge Result


future technology museum
Hovenring Evoluon Light Needle
A2

Westcorridor Eindhoven
Eindhoven Hovenring Fitting in with existing landmarks
Waalwijk bridges Referring to history
Waalwijk bridges Referring to history
ipv Delft creatieve ingenieurs
Waalwijk bridges Referring to history
Facts & Figures
• length 7.9 m
• width 2 m
• costs: €92.000,-

ultra high strenght


concrete (UHSC)

Waalwijk bridges Referring to history - leading to innovation


Dronryp movable bascule bridge Referring to history
Dronryp movable bascule bridge Referring to history
Dronryp movable bascule bridge Referring to history
Steenwijk movable liftbridge An city entrance ready for the future
Facts & Figures
• length 20 m
• width 18 m
• costs: €1.200.000
• clearance width 8 m

Steenwijk movable liftbridge An city entrance ready for the future


Facts & Figures
• length 95 m
• width 18 m
• costs: €11.000.000
• clearance width 22 m

Gouda drawbridge low drawbridge fitting in with the Dutch landscape


Gouda drawbridge low drawbridge fitting in with the Dutch landscape
port railyard Structural Railing hanging Stairs Dyke

Rotterdam Waalhaven bridge sparing the context


foundation
abutment
steel pipe pile old bridge

Midden Delftland bridge sparing the context


1995 flood

Flood Risk Areas


26% below sea level
29% above sea level
risk of flooding by river

Context (national) flooding risk


more room : normal channel : normal

more room : high channel: high

Context (national) river retention types


floating roll-out-bridge hydrodynamic bridge

pop-up bridge hydrodynamic bridge

Context (national) bridge concepts to cross flooded area


porous dam floating bridge

williow bridge floating bridge

Context (national) bridge concepts to cross flooded area


Floating concrete bridge

Context (national) bridge concepts to cross flooded area


Floating concrete bridge - cross section

Context (national) bridge concepts to cross flooded area


Floating concrete bridge - module princple

Context (national) bridge concepts to cross flooded area


porous dam

Context (national) bridge concepts to cross flooded area


Hydrodynamic bridge

Context (national) bridge concepts to cross flooded area


Hydrodynamic bridge - cross section

Context (national) bridge concepts to cross flooded area


Hydrodynamic bridge - low maintenance

Context (national) bridge concepts to cross flooded area


hydrodynamic bridge - module princple

Context (national) bridge concepts to cross flooded area


Hydrodynamic bridge

Olst Fortmond bridge hydrodynamic bridge to cross flooded area


Hydrodynamic bridge - low maintenance

Olst Fortmond bridge hydrodynamic bridge to cross flooded area


hydrodynamic bridge

Zwolle Westenholte bridge hydrodynamic bridge to cross flooded area


Tidal Floodplain Noordwaard ede
Merw
ew
river n

5.5 km

a
se

11 km

Depoldering Noordwaard bridges bridges for a tidal floodplain


water height +0.4 m -0.7 m water height to 2 m

water height +0.7 m - 1.35 m water height +2 m - 3 m

Depoldering Noordwaard bridges bridges for a tidal floodplain


Bridge Types Tidal Floodplain Noordwaard

25 creek bridges 3 bridges in old dike

7 inlet / dike bridges 13 pumping stations

Depoldering Noordwaard bridges bridges for a tidal floodplain


creek bridge

Depoldering Noordwaard bridges bridges for a tidal floodplain


creek bridge
5.1 m

perch for birds steel railing 4.4 m


to dry wings spray metalized
with bronze steel railing 0.5 m
spray metalized 1m
with bronze

prefab concrete girders


porous concrete
on site cast edge
porous concrete
on site cast edge

Depoldering Noordwaard bridges bridges for a tidal floodplain


Bronze Railing

seawater resistant steel railing


spray metalized with bronze (200 micron)

Depoldering Noordwaard bridges bridges for a tidal floodplain


inlet / dike bridge

Depoldering Noordwaard bridges bridges for a tidal floodplain


bridge in old dike

Depoldering Noordwaard bridges bridges for a tidal floodplain


Birds Perch

Depoldering Noordwaard bridges bridges for a tidal floodplain


Birds Perch - canoeist assist

Depoldering Noordwaard bridges bridges for a tidal floodplain


Pumping Stations as Viewing Platforms

Depoldering Noordwaard pumping stations experience the tidal floodplain


Contextual Benefits
• Lowering intersection for
comfortable ramps
• Ramps as sound barriers

lowered intersection

Eindhoven Hovenring benefits from the context


Contextual Benefits
• Signage portals as high traffic filter

Eindhoven Hovenring benefits from the context


Contextual Benefits
• bridge deck casted directly on existing earth dam
• Using in soil casted piles

principeprofielen
3,5 m

stainless steel
railing

0,3 m eart
h da
m
in soil casted piles
Contextual Benefits
• bridge deck casted directly on existing earth dam
• Using in soil casted piles

Breda Werkdonken bridge benefits from the context


Foundation Piles
almost always
required

10 - 20 m
Flood Risk Areas
26% by sea
29% by rivers

Context (national) ground level and subsurface conditions


Foundation: steel pipe piles

bridge directly mounted


on steel pipe piles

Context - foundation common pile types


Foundation: steel pipe piles

bridge directly mounted


on steel pipe piles

Context - foundation common pile types


Foundation: steel pipe piles 1.25 m

6m 6m 6m

Context - foundation common pile types


Foundation: concrete prefab piles

Context - foundation common pile types


Foundation: concrete prefab piles

Context - foundation common pile types


Foundation: steel sheet piles

Context - foundation common pile types


Foundation: steel screw piles

Context - foundation common pile types


List of requirements
Gathering all requirements

Design Checklist Network

Network Context
Context
Users

Br
Regulations

id
ge
us
Building Codes s ed

er
os s

s
r
C er
Us

Dutch Design Manual


Hot Dip Galvanized bolted structures in Australia

Bridge Design corrosion prevention


Hot Dip Galvanized bolted structures in Australia

Bridge Design corrosion prevention


Size of Hot Dip Galvanizing bath
determines maximum size structural parts

Bridge Design corrosion prevention


Hot Dip Galvanized bolted structures in the Netherlands

New Guardrail

Guardrail after approx. 15 years

Bridge Design corrosion prevention


Spray Metalizing with Zinc in the Netherlands

Bridge Design corrosion prevention - spray metalizing


Spray Metalized Structure without bolted connections

Bridge Design corrosion prevention - spray metalizing


Bronze Railing

seawater resistant steel railing


spray metalized with bronze (200 micron)

Bridge Design corrosion prevention - spray metalizing


required height 2.5 m

rain water pump

Bridge Design corrosion prevention - vacuum closed cross section


Facts & Figures
• length 110 m
• width 5 m
• slope < 4%
• costs: €1.1 million

Bridge Design corrosion prevention - offshore coating


Composite deck - grip layer

Bridge Design decking materials


Wooden Deck - grip layers

Bridge Design decking - materials


Steel Deck - grip layer

Bridge Design decking - materials


Concrete Deck - grip layer

Bridge Design decking - materials


Ultra High Strength Concrete Deck - integrated grip

Bridge Design decking - materials


Structure above deck: structural railing

Bridge Design structural types


Structure above deck: structural railing

Bridge Design structural types


Structure above deck: structural railing

Bridge Design structural types


Structure above deck: structural railing

Bridge Design structural types


Structure above deck: cable-stayed bridge

Bridge Design structural types


Structure above deck: cable-stayed bridge

Bridge Design structural types


Structure above deck: cable-stayed bridge

Bridge Design structural types


Structure above deck: cable-stayed bridge

Bridge Design structural types


Structure above deck: Arch bridge

Bridge Design structural types


Structure above deck: Arch bridge

Bridge Design structural types


Structure above deck: Arch bridge

Bridge Design structural types


Structure below & above deck

Bridge Design structural types


Structure below & above deck: lens truss

Bridge Design structural types


Structure below & above deck: lens truss

Bridge Design structural types


Structure below & above deck: irregular truss

Bridge Design structural types


Structure below deck

Bridge Design structural types


bridges
Structure
Below
Deck

steel concrete composite

prefab concrete steel steel steel

prefab concrete prefab concrete prefab / on site concrete prefab concrete


Prefab Concrete Decks

concrete + polystyrene infill on site + high strenght concrete concrete type tbd

DSAFKFJK;LJ;LAKJFASD
DSAFKFJK;LJ;LAKJFASD
DSAFKFJK;LJ;LAKJFASD
ASDLFKSAKJFH;SADF
ASDLFKSAKJFH;SADF
ASDLFKSAKJFH;SADF
\A'S;LDFKJLAKSFJLASDF
\A'S;LDFKJLAKSFJLASDF
\A'S;LDFKJLAKSFJLASDF
ASF;KASLFJASDF
ASF;KASLFJASDF
ASF;KASLFJASDF

33 3333 17 17 17

73 7373

Bridge Design structure below deck - materials


RSNEDE
EDE
ORSNEDE
0
Prefab Concrete Girders with custom edges

Bridge Design structure below deck - materials


Prefab Concrete Girders with custom edges

Bridge Design structure below deck - materials


Wooden structure

Bridge Design structure below deck - materials


Composite structure

Bridge Design structure below deck - materials


Composite structure

Bridge Design structure below deck - materials


Steel structure with steel trough deck

Bridge Design structure below deck - materials


Integration of functionality

Structure Design Integration of traffic lights, lighting and signage


Integration of functionality

Bridge Design bench as technical space


Integration of functionality - bench as technical space
F

Hydraulisch

) 01 : 1 ( A-A
Hydraulics Electrics Hydraulics
C

Bridge Design bench as technical space


Integration of functionality

Poem for the Integrated


waiting users • traffic signs
• lighting
• barriers

Bridge Design integration of poem, signs, lighting and barriers


Integration of functionality
Facts & Figures
• length 15 m
• width 4 m
• costs: approx. €900.000 Integrated
incl. excavation new canal & embankments • traffic signs
• clearance width 8 m • lighting
• barriers

Assen simple movable bridge with bench as technical space


A Thorough Analysis

Traffic Network Why


Analysis of
Context
Requirements
Users For Whom

Design Checklist

Alignment
Design
Bridge Design
Development
Budget What

Dutch Design Manual


Create Understanding
Between representatives of Technical & Social requirements

City
Immerse yourself in the Officials
Requirements of other (social)
Stakeholders and

we
become the Hub

try

sho
we

u
ld !
Design(er)

we
tr
!

y
do

(technical)
(social)

(City) Citizens
Engineers Advocates
can’t we ? we try
(technical) (social)

Dutch Design Manual


Start with the Crossings

Because Crossings are: A


• Hard to Integrate
• Hard to Upgrade
• Advertisers / Kickstarters
• Gapclosers

Dutch Design Manual


Contextual Benefits
• Lowering intersection for
comfortable ramps

Eindhoven Hovenring benefits from the context


Contextual Benefits
• Casting bridge deck directly on existing earth dam
• Using in soil casted piles

Breda Werkdonken bridge benefits from the context


Think Modular !
• Economies of Scale
by repeating parts

prefab deck
1 pier type

Enschede Bridge Modular Construction


Think Filter !
• Signage portals as high traffic filter

Collision Loads Anti-Collision Portals - Cost-saving Filters


Think Filter !

Users Unauthorized vehicle loads - use a filter


Seek Integration !

custom aluminium extrusion profile

LED deck lighting fixation point LED facial lighting

Lighting Design Custom Handrail with Integrated Lighting


Seek Integration !

Users Not intended visitors (Latin American mayor delegation 2017)


Seek Integration !

Integral Design Integration of traffic lights, lighting and signage


Seek Integration !

Integral Design Integration of gantry & footbridge


Tender Smart: Develop Client Side what you know best !

Budget Tender & Contract format


Conclusions
To develop bridges that satify all involved and their requirements:

• Analyse requirements thouroughly Traffic Network

BRIEF DUTCH DESIGN MANUAL FOR BICYCLE AND PEDESTRIAN BRIDGES


Analyse
• Involve all from the start BRIEF DUTCH DESIGN MANUAL Context
BRIEF DUTCH
DESIGN MANUAL

• Create understanding & openess


FOR BICYCLE AND PEDESTRIAN BRIDGES FOR BICYCLE
As one of the Netherland’s main bridge design offices, ipv Delft has focused on
AND PEDESTRIAN
Users
designing bicycle and pedestrian bridges for two decades. The company has used
their extensive experience in bridge design to write this publication. This design
manual focuses on the fundamentals of bridge design, answering practical questions
BRIDGES
• Start with the crossings
regardign issues such as bridge width and slopes. It also lists the things that should by ipv Delft
be taken into account before starting on the actual design and it offers insight in
the Dutch regulations regarding loads and collision forces. General advice on cost re-
duction is also included and several of the company’s projects are shown to illustrate
the theoretical contents. The Brief Dutch Design Manual for Bicycle and Pedestrian
Bridges therefore is a vital source of both practical information and bridge design

Design Checklist
inspiration.

• Seek - Modularity
This publication is an English summary of the Dutch Design Manual for Bicycle and
Pedestrian Bridges, which was published by CROW in 2014 and written by ipv Delft.

www.ipvdelft.com
www.crow.nl

Alignment
- Contextual Benefits
ipv Delft creative engineers

Design
+31 15 750 25 75
info@ipvdelft.nl

- Filters Bridge Design

- Integration & Optimization


in cooperation with

Budget

• Outsource Only what you can’t do yourself Free Download: ipvdelft.com / publications

- Be open to practical custom new solutions.


- Bridges are almost never standard solutions. Thanks for your Attention !
- A custom solution can be best and cheapest.

Adriaan Kok ipv Delft creative engineers mail: adriaankok@ipvdelft.nl website: ipvdelft.nl or ipvdelft.com