ESTIMATED DIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT
COST
(1) (2) (3) (4) (5)
I. Mobilization 21,047.50
II General Requirements 285,040.00
III. Concrete Breaking / Disposal 22,680.90
IV. Excavation / Disposal / Trimming 9,752.33
V. Backfilling / Compaction 8,648.64
VI. Reinforced Concrete Works 319,992.02
VII. Scaffolding 286,137.60
VIII. Masonry Works and plastering 386,111.88
IX. Tile Works 101,052.00
X. Doors & Windows 61,873.77
XI. Steel Works / Signages 167,527.81
XII. Ceiling Works (CR's & 3rd floor only) 34,517.00
XIII. Painting Works 87,232.60
XIV. Roof & Roor Framing 67,785.20
XV. Septic Tank (2.3x1.6*2.2) 48,747.24
XVI. Plumbing Works 71,549.55
XVII. Electrical Works 146,101.20
Total 2,125,797.24
________________________ __________________________
ENGR. MARK E. DE JOYA JUANITO M. DUMASIG JR.
CE-III Plumbing Estimator
_______________________________
GENESIS D. CAMAGANACAN
Electrical Estimator Checked by:
1
OCM=Overhead, Contingencies and Miscellaneous _______________________________
2
MOB./DEMOD= Mobilization and Demobilization ENGR. LUIS R. UBANDO
3
VAT= Value Added Tax CE-IV
Project Reference Number 1003-001-2018
Name of the Project
PROVED
2) StoreyBUDGET
w/ RoofCOST
Deck Building @ Libis, Concepcion I, Marikina City
PROJECT NAME AND LOCATION
MARK-UPS IN PERCENT TOTAL MARK-UP TOTAL INDIRECT
VAT 3 COST ( 10% OCM +
OCM (15%) PROFIT (10%) % VALUE 1.5 A.R.I. )
(11) (12% (12)
(6) (7) (9) (10) (5)X(9)
[(5)+(10)] (10)+(11)
_______________________________ ____________________________
ENGR. JOSEPHINE G. EVANGELISTA HON. MARCELINO R. TEODORO
Asst. City Engineer City Mayor
Recommending Approval:
_______________________________
ENGR. KENNEDY V. SUENO
City Engineer
Project Reference Number 1003-001-2018
proposed multi-purpose two (2)
storey w/ roof deck building
libis, concepcion I
marikina city
Mode of Implementation:
By Contract
By Administration
pcion I, Marikina City
TOTAL COST
UNIT COST
( Direct & Indirect )
(14)
(13)
(13/
(5)+(12)
(3)
2,790,108.88
2,790,108.88
83,703.27
2,873,812.15
______________________________
HON. MARCELINO R. TEODORO
BACK UP COMPUTATIONS
ITEM OF WORK: NA
LOCATION: Libis St., Concepcion I, Marikina City
II General Requirements
temporary barracks /warehouse 50.00 sqm 1,300.00 65,000.00
perimeter fence 24.00 lm 1,300.00 31,200.00
H- frame (60 DAYS) 132.00 sets 900.00 118,800.00
PPE 25.00 sets 2,800.00 70,000.00
water / power consumption 1.00 lot 40.00 40.00
Sub-total 285,040.00
Concreting Works
RMC, 4000 psi, 3/4, 28 days 17.92 c.m. 5,650.00 101,242.35
Super thoroseal, cementisious 1.00 gal 650.00 650.00
VII. Scaffolding
1/2 plywood 59.00 pcs 650.00 38,350.00
2x3x12 rough lumber 502.00 pcs 297.00 149,094.00
cwn 2" 48.00 kls 80.00 3,840.00
cwn 3" 91.00 kls 80.00 7,280.00
cwn 4" 48.00 kls 80.00 3,840.00
Concrete nail 3" 11.00 kls 90.00 990.00
Concrete nail 4" 11.00 kls 90.00 990.00
material cost 204,384.00
labor cost 81,753.60
Sub- Total 286,137.60
VIII. Masonry Works and plastering
chb laying
6" CHB 2,405.00 pcs 21.00 50,505.00
4" CHB 387.00 pcs 19.00 7,353.00
w. sand 19.00 c.m. 1,290.00 24,510.00
cement 170.00 bags 275.00 46,750.00
12mm defbar 68.00 pcs 227.70 15,483.60
10mm defbar 98.00 pcs 158.70 15,552.60
#16 tie wire 22.00 kls 80.00 1,760.00
plastering w/ grooves
cement 270.00 bags 275.00 74,250.00
w. sand 23.00 c.m. 1,290.00 29,670.00
Sahara 249.00 bags 40.00 9,960.00
material cost 275,794.20
labor cost 110,317.68
Sub- Total 386,111.88
BILL OF QUANTITIES
ITEM
DESCRIPTION QUANTITY UNIT AMOUNT
NO.
__________________________
Project Title: Proposed Multi-Purposed Building
Location: Mountain Hills HOA, Champaca Ext., Fortune, Marikina City
XII. Ceiling Works (CR's & 2nd floor only 46,707.30 2.49 21
0.47
0.14 0.14
0.13
3.00 3.00
1.72
0.13
2.07 2.07
1.27 1.27
3.00
1.72
2.07
0.89
0.58
0.53
8.79
52.00
1,247,821.01
71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98
3.00
1.72 1.72
1.89 1.89
1.19 1.19
0.83
1.89 1.89
1.19
0.89
0.83 0.83
1.12
0.58 0.58
0.53 0.53
DETAILED ESTIM
Item Description Quantity Unit Unit Cost ESTIMATED
No. Direct Cost
(1) (2) (3) (4) (5)
DETAILED ESTIMATE
MARK-UPS IN PERCENT Total Mark-Up VAT
OCM(15%) Profit (10%) % VALUE 5%[(5)+(6)+(7)]
(6) (7) (8) (9) (10)
TOTAL TOTAL
DIRECT COST COST
(11) (12)
6,577.34 27,624.84
89,075.00 374,115.00
7,087.78 29,768.68
3,047.60 12,799.93
2,702.70 11,351.34
99,997.51 419,989.53
89,418.00 375,555.60
120,659.96 506,771.84
31,578.75 132,630.75
19,335.55 81,209.32
52,352.44 219,880.25
10,786.56 45,303.56
27,260.19 114,492.79
21,182.88 88,968.08
15,233.51 63,980.75
22,359.23 93,908.78
44,466.15 186,757.83
663,121.16 2,785,108.88
Name of the Procuring Entity
BILL OF QUANTITIES
Item Description Quantity Unit Unit Cost VAT TOTAL
No. DIRECT COST
Two Million Seven Hundred Eighty Five Thousand One Hundred Eight and 88/100
2,785,108.88
P 2,785,108.88
TWO MILLION SEVEN HUNDRED EIGHTY FIVE THOUSAND ONE HUNDRED EIGHT AND 88/100
Date :
Project Proposed Three-Storey w/ Roofdeck Multi-Purpose Hall
Location Libis St., Concepion Uno, Marikina City
Subject Actual Expenses: 377,888.28