KONTROL WDR - MT.

KASIM 17-Nov-21

CODE DESCRIPTION OF WORK Ori/Add Group PIC Progress Status Story Writer Status WDR

KAPAL MT. KASIM 0%


Tank Cleaning & Sludge Removal De - slopping
G-3 100.00%
(Ex.Product Oil)
1 COT NO.1 (P) Ori Cleaning Patma 100% DONE Paisal
2 COT NO.1 (S) Ori Cleaning Patma 100% DONE Paisal
3 COT NO.2 (P) Ori Cleaning Patma 100% DONE Paisal
4 COT NO.2 (S) Ori Cleaning Patma 100% DONE Paisal
5 COT NO.3 (P) Ori Cleaning Patma 100% DONE Paisal
6 COT NO.3 (S) Ori Cleaning Patma 100% DONE Paisal
7 COT NO.4 (P) Ori Cleaning Patma 100% DONE Paisal
8 COT NO.4 (S) Ori Cleaning Patma 100% DONE Paisal
9 COT NO.5 (P) Ori Cleaning Patma 100% DONE Paisal
10 COT NO.5 (S) Ori Cleaning Patma 100% DONE Paisal
11 SLOP TANK (P) Ori Cleaning Patma 100% DONE Paisal
12 SLOP TANK (S) Ori Cleaning Patma 100% DONE Paisal
13 WBT NO.1 (P) Ori Cleaning Patma 100% DONE Paisal
14 WBT NO.1 (S) Ori Cleaning Patma 100% DONE Paisal
15 WBT NO.2 (P) Ori Cleaning Patma 100% DONE Paisal
16 WBT NO.2 (S) Ori Cleaning Patma 100% DONE Paisal
17 WBT NO.3 (P) Ori Cleaning Patma 100% DONE Paisal
18 WBT NO.3 (S) Ori Cleaning Patma 100% DONE Paisal
19 WBT NO.4 (P) Ori Cleaning Patma 100% DONE Paisal
20 WBT NO.4 (S) Ori Cleaning Patma 100% DONE Paisal
21 WBT NO.5 (P) Ori Cleaning Patma 100% DONE Paisal
22 WBT NO.5 (S) Ori Cleaning Patma 100% DONE Paisal
23 WBT NO.6 (P) Ori Cleaning Patma 100% DONE Paisal
24 WBT NO.6 (S) Ori Cleaning Patma 100% DONE Paisal
25 WBT NO.7 (P) Ori Cleaning Patma 100% DONE Paisal
26 WBT NO.7 (S) Ori Cleaning Patma 100% DONE Paisal
27 FPT Ori Cleaning Patma 100% DONE Paisal
28 APT Ori Cleaning Patma 100% DONE Paisal
29 FWT (P) Ori Cleaning Patma 100% DONE Paisal
30 FWT (S) Ori Cleaning Patma 100% DONE Paisal
31 PUMP ROOM Ori Cleaning Patma 100% DONE Paisal
Close Up Survey, Thickness Measurement &
G-4 Ori General QC 100.00% DONE Paisal
Soft Drawing
G-5 General Service 17.39%
1 Mooring & Un-mooring
- Mooring Ori General Capt Jajuli 25% WIP Paisal
- Unmooring Ori General Capt Jajuli 0% NOT YET Paisal
2 Docking & Un - Docking Ori General Najamudin 50% WIP Paisal
3 Dry Dock & Wharfage
- Dry Docking Ori General Imam s 14% WIP Paisal
- Wharfage Ori General Imam s 0% NOT YET Paisal
4 Fire Protection & Fireman Service Ori General Antony M. 10% WIP Paisal
5 Shore Power Supply Ori General Arnold 14% WIP Paisal
6 Temporary Lighting Ori General Bangun 10% WIP Paisal
7 Ventilation Fan & Blower Ori General Dimas 10% WIP Paisal
8 Cooling Water Ori General Erizon 14% WIP Paisal
9 Compressed Air Supply Ori General Arnold 10% WIP Paisal
10 Garbage Disposal Ori General Jamalus 10% WIP Paisal
11 Shore Telephone (Local & Overseas Call) Ori General Bangun 10% WIP Paisal
12 Crane Service Ori General Edyansah 10% WIP Paisal
13 Alleyway Covering Ori General Jamalus 90% WIP Paisal
14 Gas Free Certification Ori General Patma 100% DONE Paisal
15 Ballasting Handling Ori General Capt Najam 50% WIP Paisal
16 Bilge Pumping Ori Cleaning Jamalus 10% WIP Paisal
17 Daily Cleaning Work Ori General Jamalus 10% WIP Paisal
18 Fresh Water Supply (500 m3) Ori General Wahyu 0% NOT YET Paisal
19 Pressure Test - Vacuum Test & Load Test Ori General Oki 0% NOT YET Paisal
20 Hull & Deck Cleaning Ori General Jamalus 10% WIP Paisal
22 Heating Lamp Ori General Mukti 0% NOT YET Paisal
Stagging for Blasting, Hull Cleaning, Painting
23 Ori General Rudy 10% WIP Paisal
& Replating
25 Dock Trial & Sea Trial Ori General PM 0% NOT YET Paisal
26 Fumigation & Certificate Ori General Apin 0% NOT YET Paisal
27 Protokol pencegahan penularan Covid Ori General Abu 10% WIP Paisal
28 Businees Equipment Ori General Fajar 10% WIP Paisal
Sea Chests, Valves, CCR, Anodes & Bottom
H-1 17.86%
Plugs
1 - Valves Ori Piping Patma 10% WIP Fauzi

Page 1 of 5
CODE DESCRIPTION OF WORK Ori/Add Group PIC Progress Status Story Writer Status WDR
- Grating Seachest Ori Outfitting Bambang S 50% WIP Paisal
2 Strainer Ori Piping Cantek 10% WIP Fauzi
3 Anodes Ori Outfitting Patma 5% WIP Paisal
4 MGPS Ori Electric Mukti 0% NOT YET Syamsudin
5 Docking / Bottom Plug Ori Outfitting Bambang S 50% WIP Paisal
6 Supply material Ori Piping Patma 0% NOT YET Fauzi
H-2 Hull Cleaning and Painting 22.50%
1 Preparation Ori Painting Ferry 90% WIP Agil
2 Surface Preparation for Painting Ori Painting Ferry 0% NOT YET Agil
3 Painting Aplication Ori Painting Ferry 0% NOT YET Agil
4 Hull Mark Ori Painting Ferry 0% NOT YET Agil

H-3 Anchor, Anchore Cable, Chain Locker & Acc. 10.00%

1 Anchor & Chain Cables Ori Outfitting Komarudin 25% WIP Paisal
Recondition hawse pipe, anchor stopper and
2 Ori Outfitting Buyung 10% WIP Paisal
Gypsy
3 Renew anchor cover hole Ori Outfitting Buyung 10% WIP Paisal
4 Cleaning Chain Locker Ori Cleaning Jamalus 5% WIP Paisal
5 Painting Anchor & Chain Locker Ori Painting Ferry 0% NOT YET Agil
H-4 Windlass, Mooring Winch & Winches 0.00%
1 Inspection and Test Ori Mechanic Patma 0% NOT YET Syamsudin
2 Recondition and Partial Replating Ori Outfitting Patma 0% NOT YET Paisal
3 Renew brake lining ( P & S ) Ori Outfitting Patma 0% NOT YET Paisal
4 Overhaul Ori Mechanic Patma 0% NOT YET Syamsudin
5 Break Holding Test Ori Mechanic Patma 0% NOT YET Syamsudin
6 Check cable connection Ori Electric Patma 0% NOT YET Syamsudin
H-5 Lifting Appliances 0.00%
CARGO HOSE HANDLING CRANE SWL 5
1 Ori Mechanic Patma 0% NOT YET Syamsudin
TON (1 Set)
2 Provision Crane 1 Ton (1 set) Ori Mechanic Patma 0% NOT YET Syamsudin
3 Spare Part Crane 1.5 Ton (1 set) Ori Mechanic Patma 0% NOT YET Syamsudin
4 Pilot Hoist Crane Ori Mechanic Patma 0% NOT YET Syamsudin
5 Inspection and Testing Ori Mechanic Patma 0% NOT YET Syamsudin
H-6 Accomodation Ladder (P / S) 3.75%
1 Mechanical repair Ori Mechanic Artendy 5% WIP Syamsudin
2 Inspection and Testing Ori Mechanic Artendy 5% WIP Syamsudin
3 Recondition and Partial Replating Ori Outfitting Bambang S 5% WIP Paisal
4 Firing accommodation Ladder Ori Outfitting Bambang S 0% NOT YET Paisal
H-7 Life Boat & Davit 22.00%
1 Lifeboat Ori Mechanic Artendy 10% WIP Syamsudin
2 Davit Ori Mechanic Artendy 0% NOT YET Syamsudin
RENEWAL LRRS (Lifeboat Release Retrieval
3 Ori Mechanic Artendy 100% DONE Syamsudin
System, Include Material )
4 Tested Ori Mechanic Artendy 0% NOT YET Syamsudin
5 Recondition and Partial Replating Ori Painting Ferry 0% NOT YET Agil
H-8 Load Line Items 32.27%
1 Access Hatch Ori Outfitting Jumadi 5% WIP Paisal
2 Air Pipe Ori Piping Cantek 100% DONE Fauzi
3 Ventilator (Free Stand) Ori Outfitting Bambang S 0% NOT YET Paisal
4 Ventilator (Pump Room) Ori Outfitting Jumadi 5% WIP Paisal
5 Doorway (Watertight door) Bosun Store Ori Outfitting Iskandar 100% DONE Paisal
7 Stair Way (Main Deck & Accommodation) Ori Outfitting Iskandar 5% WIP Paisal
8 Guardraill / Railings Ori Outfitting Bambang S 5% WIP Paisal
9 Side Scuttles & Windows Ori Outfitting Jumadi 30% WIP Paisal
10 Grating asetelin Box Ori Outfitting Jumadi 100% DONE Paisal
12 Manholes Ori Outfitting Jumadi 5% WIP Paisal
13 Fire Dumper Ori Outfitting Jumadi 0% NOT YET Paisal
H-9 Hull & Tank Outfitting 29.48%
1 Electric Cable Ducting Ori Outfitting Iskandar 100% DONE Paisal
2 Small box Ori Outfitting Bambang S 5% WIP Paisal
3 Fire Hose Box Main Deck Ori Outfitting Buyung 100% DONE Paisal
4 Outfitting Fore Castle Deck Ori Outfitting Buyung 5% WIP Paisal
5 Outfitting Main Deck Ori Outfitting Buyung 5% WIP Paisal
6 Sounding Pipe (COT & WBT) Ori Piping Ashari 10% WIP Fauzi
Cable Tray (Mast, Crane, Deck,
9 Ori Electric Mukti 0% NOT YET Syamsudin
Accommodation)
10 Small Foundation (Lighting, Lifebouy, other) Ori Outfitting Buyung 0% NOT YET Paisal
11 - Fair Leads Ori Outfitting Jumadi 0% NOT YET Paisal
- Stand Roller Ori Outfitting Jumadi 100% DONE Paisal
- Bollard Ori Outfitting Jumadi 100% DONE Paisal
- Cargo Monitoring System Tank Level,
13 Temperature & Tank Overfill (Service & Ori Comm Patma 0% NOT YET
Calibration)
- Cargo Monitoring System Tank Level,
Ori Electric Patma 0% NOT YET Syamsudin
Temperature & Tank Overfill (Repair)

Page 2 of 5
CODE DESCRIPTION OF WORK Ori/Add Group PIC Progress Status Story Writer Status WDR
14 - ODME (Service & Calibration) Ori Comm Patma 0% NOT YET
- ODME (Repair) Ori Piping Patma 0% NOT YET Fauzi
17 Supporting APAR Ori Outfitting Bambang S 5% WIP Paisal
18 Labrang labrang di Forecastle & di Top Deck ( Ori Outfitting Buyung 0% NOT YET Paisal
Pondasi & cover nipple di main deck & pump
19 Ori Outfitting Bambang S 5% WIP Paisal
room
- Monitoring temperature Cargo Pump,
20 Stripping, Ballast & Tank Cleaning (Service & Ori Comm Patma 0% NOT YET
Calibration)
- Monitoring temperature Cargo Pump,
Ori Electric Patma 0% NOT YET Syamsudin
Stripping, Ballast & Tank Cleaning (Repair)
- Air Purging Ballast System (Service &
21 Ori Comm Patma 0% NOT YET
Calibration)
- Air Purging Ballast System (Repair) Ori Piping Patma 0% NOT YET Fauzi
22 Supporting Member Ori Piping Adi Candra 10% WIP Fauzi
23 Penggantian Clamp pipa u Bolt Ori Piping Adi Candra 0% NOT YET Fauzi
24 Dresser / Flexible Joint Ori Piping Adi Candra 10% WIP Fauzi
Penyanggah lampu akomodasi Life Boat &
25 Ori Outfitting Bambang S 100% DONE Paisal
Anjungan
26 Cover lampu Akomodasi Luar Ori Electric Sanudin 100% DONE Syamsudin
27 First Deck Plating COT & Slop Ori Outfitting Dimas 100% DONE Paisal
28 COT & WBT Railing & Ladder Ori Outfitting Dimas 100% DONE Paisal
H - 11 Accomodation 13%
1 - Bath Room & Toliet (perbaikan pipa bocor) Ori Piping Cantek 0% NOT YET Fauzi

- Bath Room & Toliet (ganti wastafel & shower) Ori Carpenter Sulianto 0% NOT YET Paisal

2 Tinted Window for Bridge Ori Carpenter Sulianto 0% NOT YET Paisal
3 Recreation Accessories Ori Outfitting Sulianto 0% NOT YET Paisal
4 Railing for Galley Stairway Ori Outfitting Iskandar 100% DONE Paisal
5 Window in every room Ori Outfitting Iskandar 5% WIP Paisal
6 Kunci kunci Baut Ori Outfitting Iskandar 0% NOT YET Paisal
Dispenser Big for Bridge, Mess Perwira &
7 Ori Outfitting Iskandar 0% NOT YET Paisal
Crew Mess Room
H - 12 Replating 100.00%
1 Main Deck Ori Hull SARJUNI 100% DONE Agil
2 Side Shell Ori Hull CONDRO 100% DONE Agil
3 Bottom Ori Hull KAHONO 100% DONE Agil
4 Accommodation Ori Hull RIDWAN 100% DONE Agil
5 COT Ori Hull ANDI DAENG 100% DONE Agil
6 WBT Ori Hull MAHMUD 100% DONE Agil
H - 13 Tested Calibration & Certificated 56.11%
Tested & certification for P/V valve cargo tank
1 x 12 units Ori Piping Cantek 100% DONE Fauzi

2 Tested & certification for Bouy mooring Ori Mechanic Artendy 100% DONE Syamsudin
System x 1 pcs
Tested & certification for cargo line pressure x
3 3 Main Line Ori Piping Open 10% WIP Fauzi

Tested & calibration for Windlass Brake


4 Holding Capacity Test Ori Mechanic Artendy 0% NOT YET Syamsudin

Tested & calibration for Mooring Winch Brake


5 Holding Capacity Test Ori Mechanic Artendy 0% NOT YET Syamsudin

Tested & calibration for Hydraulic Cargo


6 Crane Load Test Ori Mechanic Artendy 0% NOT YET Syamsudin

Tested & calibration for Hydraulic Life Davit


7 P/S Load Test Ori Mechanic Artendy 0% NOT YET Syamsudin

Tested & calibration for Provision & Spare part


8 Crane P/S Load Test Ori Mechanic Artendy 100% DONE Syamsudin

9 Renew & Tested for Bunker Pressure Line Ori Piping Cantek 0% NOT YET Fauzi
Tested & calibration for Accommodation
10 Ladder P/S Load Test Ori Mechanic Artendy 0% NOT YET Syamsudin

Tested & calibration for Main Engine Crane


11 Load Test Ori Mechanic Artendy 100% DONE Syamsudin

12 Tested & certification for Fire line pressure Ori Piping Ashari 0% NOT YET Fauzi
Tested & certification for Tank Ceaning line
13 pressure Ori Piping Ashari 100% DONE Fauzi

Tested & certification for Stripping line


14 pressure Ori Piping Open 100% DONE Fauzi

Tested & certification for Air line compresor


15 pressure Ori Piping Ashari 100% DONE Fauzi

16 Tested & certification for CO2 blow test Ori Piping Ashari 100% DONE Fauzi
Tested & certification Emergency Generator
17 Load Ori Comm Paidi 100% DONE

Tested & certification Water mist blow test


18 Sistem ( A/E'S, M/E, Puripair, Incenerator) Ori Comm Paidi 100% DONE

E-1 Alternator of Generator No. 1, 2 & 3 0.00%


1 Generator 1 Ori Electric Dedi 0% NOT YET Syamsudin
2 Generator 2 Ori Electric Dedi 0% NOT YET Syamsudin

Page 3 of 5
CODE DESCRIPTION OF WORK Ori/Add Group PIC Progress Status Story Writer Status WDR
3 Generator 3 Ori Electric Mukti 0% NOT YET Syamsudin
4 Emergency Generator Ori Electric Sanudin 0% NOT YET Syamsudin
E-3 Electromotor of Pumps 68.00%
1 Cargo Oil Pump (3unit) Ori Electric Patma 0% NOT YET Syamsudin
2 Stripping Pump (2unit) Ori Electric Patma 100% DONE Syamsudin
3 Ballast Pump (2unit) Ori Electric Patma 0% NOT YET Syamsudin
4 Tank Cleaning Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
5 M/E S.W Cooling Pump (2unit) Ori Electric Patma 50% WIP Syamsudin
6 A/E S.W Cooling Pump (3unit) Ori Electric Patma 100% DONE Syamsudin
7 S.W Cooling Pump Service (2unit) Ori Electric Patma 100% DONE Syamsudin
8 Fire & G.S Pump (1unit) Ori Electric Patma 0% NOT YET Syamsudin
9 Bilge & Ballast Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
10 Fuel Oil Transfer Pump (2unit) Ori Electric Patma 0% NOT YET Syamsudin
11 Lubricating Oil Transfer Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
12 S.W Sanitary Pump (2unit) Ori Electric Patma 100% DONE Syamsudin
13 F.W Hydrophore Pump (2unit) Ori Electric Patma 100% DONE Syamsudin
14 H.T F.W Standby Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
15 L.T F.W Standby Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
16 M/E G/B Lub. Oil Standby Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
17 L.O Priming Pump M/E (1unit) Ori Electric Patma 0% NOT YET Syamsudin
18 M/E L.O Standby Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
20 Sludge Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
21 Bilge Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
22 M/E F.O Service Pump (2unit) Ori Electric Patma 0% NOT YET Syamsudin
24 Steering gear Pump (2unit) Ori Electric Patma 50% WIP Syamsudin
25 Anchor Windlass Hydraulic Pump (2unit) Ori Electric Patma 50% WIP Syamsudin
26 Mooring Winch Hydraulic Pump (2unit) Ori Electric Patma 50% WIP Syamsudin
27 Emergency Fire Pump (1unit) Ori Electric Patma 100% DONE Syamsudin
E-4 Electrical Outfitting & Accessories 0.00%
1 Battery (Accu) Ori Electric Patma 0% NOT YET Syamsudin
2 Hot Plate & Accessories Ori Electric Patma 0% NOT YET Syamsudin
Service Kalibrasi & Sinkronisasi RAI
3 Anjungan, ECR & Steering Gear Room Ori Comm Patma 0% NOT YET

4 Service & Kalibrasi Master Clock Ori Comm Patma 0% NOT YET
5 Service & Kalibrasi Anemometer Ori Comm Patma 0% NOT YET
6 Internal Accommodation Lighting Ori Electric Patma 0% NOT YET Syamsudin
7 Bridge Search Light Ori Electric Patma 0% NOT YET Syamsudin

E-5 Electric Part Remote Control Valve System CCR 0.00%

1 Service Ori Comm Patma 0% NOT YET


Repair SUS Pipe, Solenoid Valve & Pressure
2 Switch Ori Piping Patma 0% NOT YET Fauzi

3 Reset back Ulleage Ori Electric Patma 0% NOT YET Syamsudin


4 Replace all broken lamp Ori Electric Patma 0% NOT YET Syamsudin
5 Calibration Book approval Class Ori SUB Patma 0% NOT YET
M - 1 Rudder Blade, Stock & Steering Gear 82.00%
1 Preparation Ori Mechanic Irnawan 100% DONE Syamsudin
2 Rudder Blade Ori Mechanic Irnawan 100% DONE Syamsudin
3 Rudder Stock Ori Mechanic Irnawan 100% DONE Syamsudin
4 Steering Gear Ori Mechanic Irnawan 10% WIP Syamsudin
5 Installation & Alignment / Insitu Boring Ori Mechanic Irnawan 100% DONE Syamsudin
Propeller, Tail, Intermediate Shaft, Stern Tube &
M-2 96.00%
Bearing
1 Preparation Ori Mechanic Irnawan 100% DONE Syamsudin
2 Propeller Ori Mechanic Irnawan 80% WIP Syamsudin
6 - Intermediate Shaft Ori Mechanic Irnawan 100% DONE Syamsudin
- Plummer Block Ori Mechanic Irnawan 100% DONE Syamsudin
7 Bolt and Nut Ori Mechanic Irnawan 100% DONE Syamsudin
M - 4 Heat Exchanger Cleaning & Cover 0.00%
1 Main Engine Air Cooler Ori Mechanic Patma 0% NOT YET Syamsudin
2 FW Cooler ME Ori Mechanic Patma 0% NOT YET Syamsudin
3 Main LO Cooler Ori Mechanic Patma 0% NOT YET Syamsudin
4 Condenser AC Galley Ori Mechanic Patma 0% NOT YET Syamsudin
5 Condenser AC ECR Ori Mechanic Patma 0% NOT YET Syamsudin
6 Main LO Cooler / FW Cooler AE 1.2 & 3 Ori Mechanic Patma 0% NOT YET Syamsudin
7 Gear Box LO Cooler Ori Mechanic Patma 0% NOT YET Syamsudin
M - 5 Engine Room Tank Cleaning 92.86%
1 MDO P/S TK Ori Cleaning Sub Cleaning 100% DONE Paisal
2 MDO S/B TK Ori Cleaning Sub Cleaning 100% DONE Paisal
3 HSD P/S TK Ori Cleaning Sub Cleaning 100% DONE Paisal
4 HSD S/B TK Ori Cleaning Sub Cleaning 100% DONE Paisal
5 MDO SETTLING TK Ori Cleaning Sub Cleaning 100% DONE Paisal
6 HSD SETTLING TK Ori Cleaning Sub Cleaning 100% DONE Paisal
7 MDO SERV TK NO.1 Ori Cleaning Sub Cleaning 100% DONE Paisal
8 MDO SERV TK NO.2 Ori Cleaning Sub Cleaning 100% DONE Paisal

Page 4 of 5
CODE DESCRIPTION OF WORK Ori/Add Group PIC Progress Status Story Writer Status WDR
9 HSD SERV TK Ori Cleaning Sub Cleaning 100% DONE Paisal
10 LO SUMP TK Ori Cleaning Sub Cleaning 0% NOT YET Paisal
11 FO DRAIN TK Ori Cleaning Sub Cleaning 100% DONE Paisal
12 DIRTY OIL TK Ori Cleaning Sub Cleaning 100% DONE Paisal
13 DIRTY WATER TK Ori Cleaning Sub Cleaning 100% DONE Paisal
14 BILGE WELL Ori Cleaning Sub Cleaning 100% DONE Paisal
M - 6 Electromotor Fan 80.00%
1 ENGINE ROOM EXH & SUPPLY FAN (2UNIT) Ori Electric Patma 0% NOT YET Syamsudin
2 PUMP ROOM EXH FAN (2UNIT) Ori Electric Patma 100% DONE Syamsudin
3 STEERING GEAR EXH FAN (1UNIT) Ori Electric Patma 100% DONE Syamsudin
4 ENGINE STORE (1UNIT) Ori Electric Patma 100% DONE Syamsudin
5 PURIFIER ROOM (1UNIT) Ori Electric Patma 100% DONE Syamsudin
GALLEY, PANTRY, STORE EXH FAN
6 Ori Electric Patma 0% NOT YET Syamsudin
(1UNIT)
7 EMERG GENERATOR ROOM (1UNIT) Ori Electric Patma 100% DONE Syamsudin
8 WORKSHOP (1UNIT) Ori Electric Patma 100% DONE Syamsudin
9 AC ACCOMM EXH FAN (1UNIT) Ori Electric Patma 100% DONE Syamsudin
10 FLUE GAS FAN (1UNIT) Ori Electric Patma 100% DONE Syamsudin

M - 15 Overhaul Compressor AC & Provision System 0.00%

1 AC Compressor Ori Mechanic Patma 0% NOT YET Syamsudin


2 Provision Plant System Ori Mechanic Patma 0% NOT YET Syamsudin
M - 17 Overhaul Pumps 50.94%
1 Cargo Oil Pump No. 3 Ori Mechanic Patma 0% NOT YET Syamsudin
2 Ballast Pump No 1 Ori Mechanic Patma 0% NOT YET Syamsudin
3 ME Cooling SW Pump No.1 & 2 Ori Mechanic Patma 50% WIP Syamsudin
4 Fire & GS Pump Ori Mechanic Patma 0% NOT YET Syamsudin
5 Bilge and Ballast pump Ori Mechanic Patma 0% NOT YET Syamsudin
6 Sea Water for Ref No.1 & 2 Ori Mechanic Patma 100% DONE Syamsudin
7 Aux. Cooling SW Pump No. 1,2 & 3 Ori Mechanic Patma 65% WIP Syamsudin
8 Tank Cleaning Pump Ori Mechanic Patma 0% NOT YET Syamsudin
16 Sanitary Seawater Hydrophore Unit Ori Mechanic Patma 0% NOT YET Syamsudin
14 HT Jacket Cooling FW Pump Ori Mechanic Patma 100% DONE Syamsudin
15 LT Jacket Cooling FW Pump Ori Mechanic Patma 100% DONE Syamsudin
10 Sludge Pump Ori Mechanic Patma 100% DONE Syamsudin
11 Bilge pump Ori Mechanic Patma 100% DONE Syamsudin
12 ME LO Stan By Pump Ori Mechanic Patma 100% DONE Syamsudin
13 Reduction Gear LO StandBy Pump Ori Mechanic Patma 100% DONE Syamsudin
9 Stripping Pump ( Gear ) Ori Mechanic Patma 0% NOT YET Syamsudin
M - 18 Overhaul Purifier 0.00%
1 MDO PURIFIER Ori Mechanic Patma 0% NOT YET Syamsudin
2 LO PURIFIER Ori Mechanic Patma 0% NOT YET Syamsudin
M - 21 Overhaul Main Engine 3.33%
1 OVERHAUL MAIN ENGINE CYL NO 1-8 Ori Mechanic Patma 5% WIP Syamsudin
2 GOVERNOR MAIN ENGINE Ori Mechanic Patma 5% WIP Syamsudin
3 AIR CHARGE MAIN ENGINE Ori Mechanic Patma 0% NOT YET Syamsudin
M - 22 OWS 0.00%
Cleaning and service the separating tank,
1 primary column and secondary column unit Ori Mechanic Patma 0% NOT YET Syamsudin

Calibration to get accurate reading in regard to


2 alarm monitor Ori Mechanic Patma 0% NOT YET Syamsudin

3 Electric adjustment to confirm 15 ppm out put Ori Mechanic Patma 0% NOT YET Syamsudin
Cleaning the level limit switch and pipes
4 system Ori Mechanic Patma 0% NOT YET Syamsudin

Repair and service solenoid valve (overboard)


5 OWS system Ori Mechanic Patma 0% NOT YET Syamsudin

Completion, operator test to be carried out


6 and witnessed by OS and Chief Engineer Ori Mechanic Patma 0% NOT YET Syamsudin

M WIP
DONE
CANCEL
NOT YET
ADD