WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont : PT. PATMA PANSER
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-1.1
Ship Name : MT. KASIM Work : Valve Service
No. Project : 9087 Location : Pump Room
Department : Valve Arrival Date : 14 November 2021
Job Unit : Valve, Anodes & Bottom Plug

Material
No Actual List Progress
Dimension QTY Unit Description
1 Valves
Dismantlle and Opening up hand-operated, globe, butterfly, strom and gate valve as listed below
a. specification and transport to workshop for overhaul.
Overhaul the list below with disconnecting and removing cover, spindle and gland, cleaning all
b. exposed parts, hand grinding of globe valve, light hand scraping of gate
Painting internal exposed area with antifouling coating areas and outside area with 2 x Anti
c. corrosive (AC) and reassembling with new cover joint and repacking 1 AU Q Include

d. Renew damaged valve with proven material (cast steel) as the class rules.
Test for leaking, on completion box up with new gasket, gland packing and grease with Pressure
e. test (10 kg/cm2) or 1.5 of Working Pressure and allow Class
f. Reinstall on board with renew seatring valve to be included on the quotation, On refloating vessel
all valves are to be proved tight, in presence of owner's representative.

1. Pump Room Valves


a Stripping line to slop stbd (CO 42) Butv. v/v 10K - 100A 1 pcs Service/ Renew
b Stripping line to slop stbd (ST 79/78/77) Butv. v/v 10K - 100A 3 pcs Service/ Renew
c Stripping line Butv. v/v 10K - 100A 2 pcs Service/ Renew
d Stripping line (ST 70/69) Butv. v/v 10K - 125A 2 pcs Service/ Renew
e Stripping line (CO 34/37/40/48/38/49/57/56) Butv. v/v 10K - 125A 8 pcs Service/ Renew
f Gravity slop (CO33/34), By pass slop to COP (CO45/46/47) Butv. v/v 10K - 150A 5 pcs Service/ Renew
g Main Cargo line (CT 81/76/75/74/73/72/71/62/63/65/64/67/66) Butv. v/v 10K - 200A 13 pcs Service/ Renew
h Main Cargo line (CO 43/55/54/53) Butv. v/v 10K - 200A 4 pcs Service/ Renew
i Main Cargo line (CO 112/113/114/115/116) Non return v/v 10K - 200A 5 pcs Service/ Renew
j Main Cargo line (CO 36/39/35/50/51/52) Butv. v/v 10K - 250A 6 pcs Service/ Renew
k By pass Bilges (CT 102/103) Globe v/v 10K - 50A 2 pcs Service
l Bilges Suction (CT 117/118) Screw down check v/v 10K - 50A 2 pcs Service
m Overboard ballast Non return v/v 5K - 200A 1 pcs Service
n Overboard ODME Non return v/v 10K - 200A 1 pcs Service

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Agus Wahyu Dwi Didit Heryadi


Story Writer Subcont Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-1.1
Ship Name : MT. KASIM Work : Valve Service
No. Project : 9087 Location : COT - WBT
Department : Valve Arrival Date : 14 November 2021
Job Unit : Valve, Anodes & Bottom Plug

Material
No Actual List Progress
Dimension QTY Unit Description
1 Valves
Dismantlle and Opening up hand-operated, globe, butterfly, strom and gate valve as listed below
a. specification and transport to workshop for overhaul.
Overhaul the list below with disconnecting and removing cover, spindle and gland, cleaning all
b. exposed parts, hand grinding of globe valve, light hand scraping of gate
Painting internal exposed area with antifouling coating areas and outside area with 2 x Anti
c. corrosive (AC) and reassembling with new cover joint and repacking 1 AU Q Include

d. Renew damaged valve with proven material (cast steel) as the class rules.
Test for leaking, on completion box up with new gasket, gland packing and grease with Pressure
e. test (10 kg/cm2) or 1.5 of Working Pressure and allow Class
f. Reinstall on board with renew seatring valve to be included on the quotation, On refloating vessel
all valves are to be proved tight, in presence of owner's representative.

2. COT Valves
a Stripping Valves COT 4 P Butv. v//v 10K125 1 Pcs Service/ Renew
b Main cargo line valve COT 4P Butv. v//v 10K200 1 Pcs Service/ Renew
c Main cargo line valve COT 2P Butv. v//v 10K200 1 Pcs Service/ Renew

3. Ballast Tank Valves


a. Forepeak WBT P/S Gate v/v 10K200 5 pcs Service / Renew

6 Main Deck
Manifold valve Gate valve 10K200 6 pcs renew

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Agus Wahyu Dwi Didit Heryadi


Story Writer Subcont Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont : PT. PATMA PANSER
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-1.1
Ship Name : MT. KASIM Work : Valve Service
No. Project : 9087 Location : Maindeck
Department : Valve Arrival Date : 14 November 2021
Job Unit : Valve, Anodes & Bottom Plug

Material
No Actual List Progress
Dimension QTY Unit Description
1 Valves
Dismantlle and Opening up hand-operated, globe, butterfly, strom and gate valve as listed below
a. specification and transport to workshop for overhaul.
Overhaul the list below with disconnecting and removing cover, spindle and gland, cleaning all
b. exposed parts, hand grinding of globe valve, light hand scraping of gate
Painting internal exposed area with antifouling coating areas and outside area with 2 x Anti
c. corrosive (AC) and reassembling with new cover joint and repacking 1 AU Q Include

d. Renew damaged valve with proven material (cast steel) as the class rules.
Test for leaking, on completion box up with new gasket, gland packing and grease with Pressure
e. test (10 kg/cm2) or 1.5 of Working Pressure and allow Class
f. Reinstall on board with renew seatring valve to be included on the quotation, On refloating vessel
all valves are to be proved tight, in presence of owner's representative.

4. Maindeck Valves
a Fire Hydrant (Cover Valve for Fire Hose) Gate v/v ( Connect Strozz ) 2,5"/1,5" 10 Pcs service
b Dropping Valves Gate v/v 10K-200 3 Pcs service
c Manifold Valves P/S Gate v/v 10K-200 6 Pcs service
d Manifold Stripper P/S Gate v/v 10K-100 6 Pcs service
e Manifold Stipper ke Bak Oil Spill Gate v/v 10K-50 2 Pcs service
f Bak Oil Spill ke Slop Tank Gate v/v 5K-50 6 Pcs service
g Crossover Valves Butv. v/v 10K - 200 6 Pcs service
h Tank Cleaning Valves Gate v/v 16K-dn50 12 Pcs service
i Tank Cleaning Valves Gate v/v 16Kdn65 20 Pcs service
j Blowing Valve Manifold (Leher Angsa) Gate v/v 10K50 4 Pcs service
k Actuator Remote Control Block v/v 10 Pcs service

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Agus Wahyu Dwi Didit Heryadi


Story Writer Subcont Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-1.1
Ship Name : MT. KASIM Work : Valve Service
No. Project : 9087 Location : Pump Room
Department : Valve Arrival Date : 14 November 2021
Job Unit : Valve, Anodes & Bottom Plug

Material
No Actual List Progress
Dimension QTY Unit Description
1 Valves
Dismantlle and Opening up hand-operated, globe, butterfly, strom and gate valve as listed below
a. specification and transport to workshop for overhaul.
Overhaul the list below with disconnecting and removing cover, spindle and gland, cleaning all
b. exposed parts, hand grinding of globe valve, light hand scraping of gate
Painting internal exposed area with antifouling coating areas and outside area with 2 x Anti
c. corrosive (AC) and reassembling with new cover joint and repacking 1 AU Q Include

d. Renew damaged valve with proven material (cast steel) as the class rules.
Test for leaking, on completion box up with new gasket, gland packing and grease with Pressure
e. test (10 kg/cm2) or 1.5 of Working Pressure and allow Class
f. Reinstall on board with renew seatring valve to be included on the quotation, On refloating vessel
all valves are to be proved tight, in presence of owner's representative.

5. Sea Suction Valves


a Sea Chest Before Filter (P/S) Gate Valve 10K - 300 2 Sets service
b Sea Chest After Filter (P/S) Butterfly Valve 10K - 300 2 Sets service
c sea chest air vent (P/S) Globe Valve 10K - 65A 2 Sets service
d Sea Chest valve pump room Globe Valve 10K-200 1 Sets service
e Emergency Fire Pump Non Return Valve 10K-100 1 Sets service

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-1.1
Ship Name : MT. KASIM Work : Valve Service
No. Project : 9087 Location : Pump Room
Department : Valve Arrival Date : 14 November 2021
Job Unit : Valve, Anodes & Bottom Plug

Material
No Actual List Progress
Dimension QTY Unit Description
1 Valves
Dismantlle and Opening up hand-operated, globe, butterfly, strom and gate valve as listed below
a. specification and transport to workshop for overhaul.
Overhaul the list below with disconnecting and removing cover, spindle and gland, cleaning all
b. exposed parts, hand grinding of globe valve, light hand scraping of gate
Painting internal exposed area with antifouling coating areas and outside area with 2 x Anti
c. corrosive (AC) and reassembling with new cover joint and repacking 1 AU Q Include

d. Renew damaged valve with proven material (cast steel) as the class rules.
Test for leaking, on completion box up with new gasket, gland packing and grease with Pressure
e. test (10 kg/cm2) or 1.5 of Working Pressure and allow Class
f. Reinstall on board with renew seatring valve to be included on the quotation, On refloating vessel
all valves are to be proved tight, in presence of owner's representative.

6. Engine Room Valves


a SW Service P/P AE 1,2&3 Suct Globe Valve 5K - 65 3 Pcs Service
b SW Service P/P AE 1,2&3 Deliv Globe Valve 5K - 65 3 Pcs Service
c HT Cooler Butterfly Valve 5K - 100 KJ6 2 Pcs service/ renew
d LT Cooler Butterfly Valve 5K - 100 KJ6 2 Pcs service/ renew
e SW Hydropone Pump No 1 & 2 Suct Globe Valve 5K - 32 2 Pcs Service
f SW Cool AC Accom From GS Pump Butterfly Valve 10K - 100 KJ6 1 Pcs service/ renew
g SW Ref Serv Pump No 1 & 2 From Sea Cheast Butterfly Valve 6W - 125A FC 2 Pcs service/ renew
h Sea Water Inlet For Cool AE No 2 Globe Valve 5K - 50 SC 1 Pcs Service
i SW Cool AC Accom Butterfly Valve 5K - 65 KJ6 2 Pcs service/ renew
j Bahan Bakar Inlet AE 1,2&3 Globe Valve 5K - 25 3 Pcs Service
k Overboard Sewage (by pass) Strom Valve 5K125 1 Pcs Service
l Overboard Sewage Strom Valve 5K65 1 Pcs Service
m Overboard Grey Water Accomodation Strom Valve 5K80 2 Pcs Service
n Overboard A/E 1,2 & 3 Angle Valve 10K80 3 Pcs Service
o Overboard Bilge & Ballast Angle Valve 10K100 1 Pcs Service
p Overboard GS & Fire Angle Valve 10K100 1 Pcs Service
q Overboard SW M/E Angle Valve 10K125 1 Pcs Service
r Overboard AC Gall Angle Valve 10K80 1 Pcs Service
s Overboard AC Cooling Angle Valve 10K100 1 Pcs Service
t Overboard Main Air Compressor Angle Valve 10K32 1 Pcs Service
u Overboard OWS Globe Valve 5K25 1 Pcs Service

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA (PERSERO) No. RL : H-1.2
Ship Name : MT. MENGGALA Work : Seachest & Strainer
No. Project : 9084 Location : Engine Room
Department : Valve Arrival Date : 14 Nopember 2021
Job Unit : Sea Chest, Valves, CCR, Anodes & Bottom Plugs - Seachest & Strainer

Material
No Actual List Progress
Dimension Length (mm) QTY Unit Description
3 Seachest & Strainer
'Opening up of sea chests by removing ship side grating, cleaning &
a. scraps & may blasting for class & owner inspection.
'Strainer to be cleaning & coated anti fouling & new strainer to be
b. provided for spare, the strainer housing to be service & may build up
or new housing.
Damaged grating to be replaced by new mild (glavanized) or
c. stainless steel as original design, The missing bolt & nut to be
replace with tha class & owner approval.

As H - 2 hull cleaning & painting specification, surface preparation to


d. be applied & recoating 2 AC (Anti Corrosive) & 2 AF (Anti Fouling) :

1 Strainer 200A 2 pcs service


2 Filter Strainer for spare 200A 1 pcs supply by yard

Made By: Checked and Known By: Checked and Approved By:

Syamsudin Wahyu Dwi Faruk Hasan Didit Heryadi


Story Writer Suprintendent Project Manager Nahkoda MT. Kasim

Agus Prastetiyo Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Sub Contractor Repair Manager CO MT. Kasim Tech Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA (PERSERO) No. RL : H-8.2
Ship Name : MT. KASIM Work : Valve Service
No. Project : 9087 Location : Main Deck
Department : Valve Arrival Date : 08 September 2021
Job Unit : Load Line Items

Material
No Actual List Progress
Length (mm) QTY Unit Description
1 Air Pipe
a. PV (Pressure Vacuum) Valve 22 pcs service
Remove PV Valve and transport to workshop for overhaul, corroded part to be renew, some area
to be build up or to be fibre up and Clean up, lapping/grinding and build-up/recondition to good
condition

Test to be done for pressure 0.14 kg/cm2 and vacuum 0.035 kg/cm2 by the expert and prepare for
Class/OS inspection and carry out test (submit record) with noted Test and date to be marked on
the vent head and pipe.

Service Vacuum Relief Valve


Service Pressure Valve .
Service High Velocity Vent Valve
Service Pressure Valve
Reinstalled its original position and box up with new packing, bolt and nuts by yard

Material
1 Bolt / nut uk. M12 x 30 mm Mat. Stainlees steel 88 set new
2 Gasket klingrit (dia. 200 mm x t. 3 mm 22 pcs new
3 Wire mesh material stainless steel uk. P. 200 mm x l. 250 mm 22 pcs new

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Capt. Jopie Wattimena


Story Writer Superintendent Nahkoda MT. MENGGALA

Faruk Hasan Yanuar Kamtono Djumat Rady Ifnu Hamsyah Sundoro


Project Manager Production Manager C/E MT. MENGGALA Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-9.6
Ship Name : MT. KASIM Work : Piping Renew
No. Project : 9087 Location : COT & WBT
Department : Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

Material
No Actual List Progress
Sch Dia (inch) Length (mm) QTY Unit Description
Sounding Pipe (COT and WBT)
a. Sounding pipe WBT
Galv. Pipe (threaded) 80 1½ 600 10 spool renew
Bolt-Nut M12x45 40 set renew
Flange 5K 1½ 10 pcs renew
b Sounding pipe COT
MS pipe (threaded) 80 2 310 9 spool renew
Flange 10K 2 9 pcs renew
Flange 5K 2 9 pcs renew
Bolt-Nut M14x60 40 set renew
c Sounding FPT
Galv. Pipe (threaded) 80 1½ 150 1 spool renew
Flange 5K 1½ 2 pcs renew
Bolt-Nut M12x45 4 set renew

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA (PERSERO) No. RL : H-9.15
Ship Name : MT. KASIM Work : Valve Service
No. Project : 9087 Location : COT
Department : Piping Arrival Date : 08 September 2021
Job Unit : Hull & Tank Outfitting

Material
No Actual List Progress
Length (mm) QTY Unit Description
1 ODME Seil Series S-3000
Service & Overhaul actuator for Valve overboard & slopt / recirculation 2 unit
Service & Overhaul Valve overboard & slopt / recirculation 2 unit

88 set new
22 pcs new
22 pcs new

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Capt. Jopie Wattimena


Story Writer Superintendent Nahkoda MT. MENGGALA

Faruk Hasan Yanuar Kamtono Djumat Rady Ifnu Hamsyah Sundoro


Project Manager Production Manager C/E MT. MENGGALA Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA (PERSERO) No. RL : H-9.22
Ship Name : MT. KASIM Work : Pipe Support
No. Project : 9087 Location : Maindeck
Department : Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

Material
No Actual List Progress
Length (mm) QTY Unit Description
22 Supporting Member
During joint inspection with class and OS, the corroded supporting member to be marked, crop
out, renew it with the marine material.
Fabricate new supporting member in situ or the workshop as original or direction of the OS.
The corroded and miising U-Bolt, bolt and nut to be replace with stainless steel material or as
original.

Completely the work, to be checked to the Class, O/S, C/O


Jasa seluruhnya (include material tambahan, supporting & cat) 1 AU

1. Angle bar 75x75x8 1600 1 pcs renew


U-bolt 4 inch 3 pcs renew
U-bolt 3 inch 2 pcs renew
2. Angle bar 75x75x8 1200 1 pcs renew
U-bolt 4 inch 2 pcs renew
U-bolt 3 inch 1 pcs renew
3 Angle bar 75x75x8 1200 1 pcs renew
U-bolt 4 inch 2 pcs renew
U-bolt 3 inch 1 pcs renew
4 Angle bar 75x75x8 700 1 pcs renew
U-bolt 4 inch 1 pcs renew
U-bolt 3 inch 1 pcs renew
U-bolt 1 inch 1 pcs renew
5 Angle bar 50x50x8 260 1 pcs renew
U-bolt 1 inch 1 pcs renew
6 U-bolt 4 inch 14 pcs renew
U-bolt 3 inch 14 pcs renew
U-bolt 1 inch 20 pcs renew
7 Angle bar 50x50x8 300 1 pcs renew
U-bolt 1 inch 2 pcs renew
8 Angle bar 75x75x8 1200 1 pcs renew
Angle bar 75x75x8 200 1 pcs renew
Angle bar 50x50x8 100 1 pcs renew
U-bolt 1 inch 1 pcs renew

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA (PERSERO) No. RL : H-9.22
Ship Name : MT. KASIM Work : Pipe Support
No. Project : 9087 Location : Maindeck
Department : Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

Material
No Actual List Progress
Length (mm) QTY Unit Description
22 9 Angle bar 50x50x8 200 1 pcs renew
U-bolt 1 inch 1 pcs renew
Angle bar 50x50x8 200 1 pcs renew
U-bolt 1 inch 1 pcs renew
Angle bar 50x50x8 200 2 pcs renew
U-bolt 1 inch 2 pcs renew
Angle bar 50x50x8 250 3 pcs renew
U-bolt ½ inch 3 pcs renew
Angle bar 50x50x8 250 3 pcs renew
U-bolt ½ inch 3 pcs renew

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA (PERSERO) No. RL : H-9.22
Ship Name : MT. KASIM Work : Pipe Support
No. Project : 9087 Location : Maindeck
Department : Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-9.22
Ship Name : MT. KASIM Work : Pipe Support
No. Project : 9087 Location : Maindeck
Department : Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

Material
No Actual List Progress
Length (mm) QTY Unit Description
22 Supporting Member
During joint inspection with class and OS, the corroded supporting member to be marked, crop
out, renew it with the marine material.
Fabricate new supporting member in situ or the workshop as original or direction of the OS.
The corroded and miising U-Bolt, bolt and nut to be replace with stainless steel material or as
original.

Completely the work, to be checked to the Class, O/S, C/O


Jasa seluruhnya (include material tambahan, supporting & cat) 1 AU

1 Support Angle Bar 75x75x8


a Support on main deck ( Cable Pipe ) 280 23 Pcs renew
b Support on main deck ( Cable Pipe ) 1470 14 Pcs renew
c Support on main deck ( P/V Valve ) 1000 10 Pcs renew
d Support on main deck ( Fire Hidrant valve pipa ) 780 12 Pcs renew
e Support on main deck ( cargo Pipe ) 2700 28 Pcs renew
f Support Cargo Pipe in Tank (Angle Bar L 100 x 100 x 8) mm 2000 20 Pcs renew
g Support Ballast Pipe in Tank (Angle Bar L 100 x 100 x 8) mm 500 25 Pcs renew

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA (PERSERO) No. RL : H-9.23
Ship Name : MT. KASIM Work : Pipe Clamp Renewal
No. Project : 9087 Location : Maindeck
Department : Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

Material
No Actual List Progress
Length (mm) QTY Unit Description
23 Penggantian Clamp pipa U-Bolt
Rincian Pekerjaan :
- Potong Clamp U bolt lama yang keropos dan patah pipa Cargo, Stripping pipe,P/V pipe,Cable
Pipe,Bunker Line,Fresh water pipe Tank Cleaning pipe,Fire line, Pipa angin deck, pipa air tawar
1 AU Q
- Pasang clamp pipa U-Bolt baru sesuai ukuran pipa dan dilapisi paking teflon
- Selesai pemasangan supaya di periksa oleh OS dan Mualim I

a. Pipa Kabel
U-bolt 8 inch 18 pcs renew
b Pipa Cargo
U-bolt 8 inch 6 pcs renew
c Pipa Fire Line
U-bolt 4 inch 6 pcs renew
d Tank Cleaning
U-bolt 3 inch 2 pcs renew

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-9.23
Ship Name : MT. KASIM Work : Pipe Clamp Renewal
No. Project : 9087 Location : Maindeck
Department : Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

Material
No Actual List Progress
Dia QTY Unit Description
23 Penggantian Clamp pipa U-Bolt
Rincian Pekerjaan :
- Potong Clamp U bolt lama yang keropos dan patah pipa Cargo, Stripping pipe,P/V pipe,Cable
Pipe,Bunker Line,Fresh water pipe Tank Cleaning pipe,Fire line, Pipa angin deck, pipa air tawar
1 AU Q
- Pasang clamp pipa U-Bolt baru sesuai ukuran pipa dan dilapisi paking teflon
- Selesai pemasangan supaya di periksa oleh OS dan Mualim I

a U-bolt Pipa Cargo 200A 30 pcs Q


b U-bolt Pipa Cargo in tank 250A 30 pcs Q
c U-Bolt Stripping 100A 25 pcs Q
d U-Bolt Stripping in tank 125A 25 pcs Q
e U-Bolt pipa Ballast in tank 200A 30 pcs Q
f U-Bolt P/V 100A 40 pcs Q
g U-Bolt pipa kabel 200A 20 pcs Q
h U-Bolt Bunker 100A 15 pcs Q
i U-Bolt fresh water Bunker 100A 18 pcs Q
j U-Bolt Tank cleaning 80A 34 pcs Q
k U-Bolt Fire line 50A 40 pcs Q
l U-Bolt Angin deck 3/4' 56 pcs Q
m U-Bolt air tawar 3/4' 43 pcs Q
n Ullage gauge & overfill alarm 3/4" 45 pcs Q
o Driptray ke slop kanan 100A 5 pcs Q

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-9.23
Ship Name : MT. KASIM Work : Pipe Clamp Renewal
No. Project : 9087 Location : Maindeck
Department : Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-9.24
Ship Name : MT. KASIM Work : Renew
No. Project : 9087 Location : Maindeck
Department: Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

DRESSER / FLEXIBLE JOINT

Material
No Actual List Progress
Length (mm) QTY Unit Description
1 Dresser / Flexible Joint
- Prepare the access work include staging (if necessary) and remove the obstruction of the job.
- Transport to workshop for overhaul, defective of flange to be cut and renew, worm out rubber
lining to be renew, clean its landing face and service dresser coupling untill
- Renew the dresser joint as original
- Upon completion of overhaul reassemble as original, install with new gland packing,
- jointing and bolts & nuts supplied by yard and conducting the leak test.
- Completely the work, to be checked to the Class, O/S, C/O
Total Service Quotation
Material for F.3. (Supplied by yard)
Expantion Joint
Dia 8 inch 3 pcs renew
Stud bolt 24 pcs renew

Made By: Checked and Known By: Checked and Approved By:

Syamsudin Wahyu Dwi Faruk Hasan Didit Heryadi


Story Writer Suprintendent Project Manager Nahkoda MT. Kasim

Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho


Production Manager CO MT. Kasim Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-9.24
Ship Name : MT. KASIM Work : Renew
No. Project : 9087 Location : Maindeck
Department: Piping Arrival Date : 14 November 2021
Job Unit : Hull & Tank Outfitting

DRESSER / FLEXIBLE JOINT

Material
No Actual List Progress
Dia QTY Unit Description
1 Dresser / Flexible Joint
- Prepare the access work include staging (if necessary) and remove the obstruction of the job.
- Transport to workshop for overhaul, defective of flange to be cut and renew, worm out rubber
lining to be renew, clean its landing face and service dresser coupling untill
- Renew the dresser joint as original
- Upon completion of overhaul reassemble as original, install with new gland packing,
- jointing and bolts & nuts supplied by yard and conducting the leak test.
- Completely the work, to be checked to the Class, O/S, C/O
Total Service Quotation
Material for F.3. (Supplied by yard)
Expantion Joint
For Cargo Line & Cable Pipe 200A 5 Sets Q
For Stripper Line 100A 3 Sets Q
For Bunker Line, Fresh water line, 100A 3 Sets Q
For Cargo Line in Tank 250A 10 Sets Q
For Ballast Line in Tank 200A / 150A 10 Sets Q
For Stripper Line in Tank 125A 7 Sets Q

Made By: Checked and Known By: Checked and Approved By:

Syamsudin Wahyu Dwi Faruk Hasan Didit Heryadi


Story Writer Suprintendent Project Manager Nahkoda MT. Kasim

Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho


Production Manager CO MT. Kasim Tech. Superintendent
PT. MULTI OCEAN SHIPYARD
Jalan Tanjung Melolo, Desa Pangke, Kecamatan Meral Barat
Kabupaten Karimun, Kepulauan Riau, INDONESIA
Tel : +62 777 7360607 e-mail : repair@multioceanshipyard.com
WORK DONE REPORT
Shipyard : PT. MULTI OCEAN SHIPYARD Sub. Cont :
Owner : PT. PERTAMINA INTERNATIONAL SHIPPING No. RL : H-11.1
Ship Name : MT. KASIM Work : Piping Renew
No. Project : 9087 Location : Accomodation
Department : Piping Arrival Date : 08 September 2021
Job Unit : Accomodation

Material
No Actual List Progress
Length (mm) QTY Unit Description
1 Bath Room and toilet
a. Kamar Mandi Anjungan
Mini ball valve 2 pcs renew
T - Joint 1 pcs renew
Double Neeple 2 pcs renew
Hoose 1 pcs renew
b. Crew Messroom
Mini ball valve 2 pcs renew
c. Officer Messroom

Made By: Checked and Known By: Checked and Approved By:

Ahmad Fauzi C Wahyu Dwi Didit Heryadi


Story Writer Superintendent Nahkoda MT. Kasim

Faruk Hasan Yanuar Kamtono Danang Dwi Cahya Bintoro Dwi Nugroho
Project Manager Production Manager C/O MT. KASIM Tech. Superintendent

You might also like