Professional Documents
Culture Documents
CHATTOGRAM
SHIP REPAIR DEPARTMENT
DRY DOCK REPAIR LIST
( ENGINE DEPARTMENT )
VSL NAME: BANGLAR JYOTI PORT: CHATTOGRAM DATE: 30-JUNE-2022
CODE DESCRIPTION OF REPAIR REMARKS
NUMBER ATTNDG SUPRNDT
Repair works to be carried out by BSC W/SHOP during Dry docking Following
valves to be dismantled & overhauled
Inter connection v/v between ECR A/C & Accommodation A/C condenser C.S.W
line.
ECR A/C cooling SW inlet v/v
HT heat exchanger SW inlet, outlet & bypass v/v
LT heat exchanger SW inlet, outlet & bypass v/v
LT p/p no. 1 & 2 suction and delivery valves
HT p/p no. 1 & 2 suction and delivery valves
Central cooling SW p/p no. 1 2 suction & delivery valves
AE cooling SW p/p no. 1 2 suction & delivery valves
Fire & deck wash p/p suction & delivery valves
Fire main line ER isolating v/v & deck isolating v/v.
Interconnection valves between foam p/p & fire & deck wash p/p.
Interconnection valves between fire & ballast p/p and fire & dk wash p/p.
ME(P) jacket cooling water inlet & outlet valves
ME(S) jacket cooling water inlet & outlet valves
HFO bunker line valves (after flange connection)-02 nos.
DO bunker line valves (after flange connection)-02 nos.
Main air bottles (P&S) filling & drain valves.
Main air compressor (P&S) drain valves .
LT & HT C.F.W Expansion tank filling valves to be renewed aps.
Bilge injection valve to be fitted and made ready for operation.
Sea water line v/v connected with the E/R bilge line.
Butterfly valve for deck water supply line from main S.W. cooling line.
PIPE WORKS
To rectify clamp for Hydrophore FW pump delivery line.
To rectify leakages in Fresh water tank (Port) bulkhead.
To fabricate one gas charging line for ECR A/C (PORT).
To rectify FW pipeline leakage in Lube oil store.
To renew ECR aft entrance door lock.
To fabricate a pipe in H.F.O service tank for taking sounding.
To fabricate and install both Fwd & aft fender crane limit switch activation bar.
To clean M/E (P & S) both charge air cooler.
To renew ECR A/C (STBD) thermostatic expansion valve.
To modify ECR A/C PORT defrosting heating line.
To renew H.T & L.T. cooler s.w. inlet & outlet badly corroded pipe
To replace/repair M/E (P) Turbocharger turbine side gas admission casing due to
leakage, carry out pressure test and renew nuts and studs (Material- Heat
resistant SS).
To repair/rectify SW leakage from wasted bulkhead plate of No. 16 WBT above
M/E (S) propeller shaft area.
Need to repair following engine room pump and cooler base support:
i. No 1 and 2 HT Cooling pump
ii. No 1 LT pump
iii. Foam Pump
iv. Fire/Ballast pump
v. Fire/Deck wash pump
vi. HT/LT cooler
vii. SW pump
To repair corroded bulkhead plate beside HT & LT expansion tank.
To renew section of sewage O/B line near M/E (S).
To fabricate 2 Nos. F-key for operating valve wheel. (API)
To rectify gas leakage of M/E (P & S) exhaust trunking. Need to renew M/E
(PORT & STBD) flexible bellows before EGE inlet if found leaky.
To fabricate/repair Lifeboat (STBD) fuel oil tank leakage
To clear drain line near No. 03 A/E S.W. inlet line strainer.
To repair/renew 4 nos. leaky ball valves in M/E F.O. electric heater F.O. line.
(APS)
To dismantle M/E FO HEATER (Thermal Oil) assy. and carry out pressure test at
10 bar, plug leaky tubes and secure with welding/brazing, install heater F. O.
inlet line with valve and box back in good order.
To install ball v/v with plug in M/E (P & S) scavange manifold to facilitate
draining of EGE washing water. (APS)
To rectify Hydraulic oil leakage in 02 Nos. capstan (STBD) pipeline.
To renew Foam compound p/p mechanical seal and foam system all damaged
pipeline. (APS)
To charge Nitrogen in Bladder Accumulator of valve remote control hydraulic