DIV. SH 2 2 2 2
PLATEN(COIL
/SEIZURE /SPACER 9 9 9 9
TUBE)
S-Panel 28 28 28 28
RH SPACER
15 15 15 15
TUBE(O/L)
RH I/L 49 39 47 47
SCW- Access
100 100 100 100
Door/Manhole/LRSB
Oxide thickness in
Complete.
RH tubes
114 3 0 0 12.10.2017
2 0 0 0 COMPLETE
9 0 0 0
COMPLETE
28 0 0 0 COMPLETE
15 0 0 0
COMPLETE
45 2 2
2 12.10.2017
1235 5 2 0
DIFICATION
100 0 0 0 COMPLETE
2417 0 0 0 COMPLETE
440 0
COMPLETE
120 0
COMPLETE
35 no. RT
1518 15 0 62 taken during
launch.
9 1 1
12.10.2017
12 0
COMPLETE
6 0
COMPLETE
449 1 0 1 12.10.2017
14 0 0 0 COMPLETE
8 0 COMPLETE
8 0
COMPLETE
2 0 0 0
COMPLETE
8 0
COMPLETE
5111 17 0 64
21 0 0 0
MPLETE. RT, UT OK, SR COMPLETE.
23 COILS INSERTED.
LL PIECES INSERTED.
R OF 560 / 1110 JOINTS COMPLETE. 23 COIL SIDE CLAMP SR
D & CLAMP WELDING TO COMPLETE TODAY.
5/65 PAIRS INSERTED.
COMPLETE.
nd Soot blowers
Remarks
SV-6 replaced. SV-3 replacement i/p.
et washing completed.
e.Front panel all corners boxed up. Elbow fitting all corners
al). Windbox repair complete. All Scanners, Ignitors, Oil guns
hose fixing complete. Side inner panel fixing complete.Outer
omplete today.
complete, linking complete. All corners BT power cylinders are
complete. Rest to complete today.
R complete.
a complete. Burner top & bottom complete. S-Panel corners &
tube area i/p. LTSH I/L hdr area i/p. To complete today.
RECOMMISSIONING ACTIVITY DAY
SG ECW SYSTEM CHARGING 21
TGECW SYSTEM CHARGING 21
CW DUCT CHARGING 22
ACW SYSTEM CHARGING 23
BCW PURGING CLEARANCE 23
CONDENSER FLOOD TEST 25
FW SYSTEM CHARGING 26
CEP DUMP VALVE READINESS AND FREENESS 26
CHECK
HW FILLING AND FLUSHING THROUGH CEP 26
SUCTION SIDE
CPU-B READINESS 26
TURBINE ON BARRING 34
BA HOPPER CLEARANCE FOR AIR LEAK TEST BY 34
FINAL FURNACE ATT 34
CG LOAD TRIAL 34
LDO/HFO CHARGING 34
ATOMISING STEAM CHARGING 34
BOILER SIDE STEAM CHARGING 34
SCAPH VALVES OPERATION CHECK 34
APH SB OPERATION WITH STEAM 34
MAIN BOILER P&I CHECK 34
SEAL TROUGH FILLING/ FLUSHING 34
BA HOPPER EVACUATION SYSTEM READINESS 34
CLEARANCE FOR BLU BY ALL 34
CLEAN AIR FLOW TEST OF MILLS 34
BA/FA SYSTEM READINESS & OPERATION 34
TG FIRE PROTECTION CHECK ACTUAL 34
TG P&I CHECK COMPLETE 34
UNIT INTERTRIP CHECK 34
VAC PULLING FOR BLU AFTER TG ON BARRING 34
TD-A/B P&I CHECK COMPLETE 34
TD-A/B ROLLING FROM AUX STEAM 34
FST HEATING AFTER FINAL FILLING 34
ATT ALL PRESSURE SWITCH NORMALISATION 34
INFORMATION TO FIRE STATION FOR BLU 34
BLU 35
SYNCHRONISATION 36
TARGET DATE TMD EMD C&I
9/30/2017 OK OK OK
9/30/2017 3.10.17 OK OK
10/1/2017 4.10.17
10/2/2017
10/2/2017 P/P-A
10/4/2017 4.10.17
10/5/2017
10/5/2017
10/5/2017
10/10/2017
10/6/2017
10/7/2017 09.10.17
10/7/2017 09.10.17
10/10/2017
10/9/2017
10/10/2017
10/13/2017
10/13/2017
10/13/2017
10/8/2017
10/8/2017
10/8/2017
10/8/2017
10/10/2017
10/12/2017
09-10-2017-12.10.17
10/13/2017 AHD-12.10.17 ESP-13.10.17
AHD/RP/BMD/ESP BMD-12.10.17 RP-13.10.17
10/11/2017
10/11/2017
10/11/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/12/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/13/2017
10/14/2017
10/15/2017
BMD OFFSITE AHD
OK
P/P-A
CPU B RUBBERLINING
DURATION IN
SL NO. ACTIVITY START DATE
DAYS
Chipping of old
1 5 22.09.2017
Rubber lining
Surface grinding &
2 2 26.09.2017
cleaning
30.9.2017/
4 Rubber Lining 7
3.10.2017
Steaming &
6 2 09.10.2017
Curing
7 Testing 1 11.10.2017
22
COMPLETION DATE STATUS
26.09.2017
COMPLETED
28.09.2017
COMPLETED
29.09.17/
02.10.17 COMPLETED
02.10.17/
9.10.17 COMPLETED
10.10.2017
COMPLETED
11.10.2017, 12.10.17,
14:00 morning
1
7
Modification jobs
Extension of Power cable of individual Feeder motor - to facilitate faster Tasc unit replacement job
Provision for Lamp indication inside feeders (A-K)
Commissioniong of DT-9 Controller by Stock service engineer (3 G & 3K)
Installation of thermowell for RTD insertion at the bottom ash hopper for temperature measuring -
Installation of flange at ID Fan outlet for opacity monitor
Commissioning of PLC Interface for ESP Pass 3 E (Confirmation of Net Cascade engineer visit by 5th
Installation of SS Braided hose on the guide pipe for the scanner cooling
support
EMD
EMD
SELF
AHD
BMD-Rotary part
AHD
BMD
BMD PP BOILER
MODIFICATION
DEFECTS
OLD JOINTS-6/629
WELDER: AKASH:6,
PRECISION:9+15
SAPH:B RUNNING
PA Fan B
FD Fan A
FD Fan B
ID Fan A
ID Fan B
BMD MILLS
MILL REJECT OVERHAULING OF MILL ALL 10 MILLS
SYSTEM REJECT SYSTEM ALL 10
MILLS
BODY LINER 3A
REPLACEMENT
MILLS BODY CEREMIC 3A,3E,3F
TYLING A,E,F
TURBINE MAINTENANCE
AREA ACTIVITY PLANNED STATUS
HPT
HP ROLL AND BUMP CHECK
COMPLETED
Bottom Ash
PASS B
Permit cancelled
PASS C
Permit cancelled
PASS D
GT-3R TestingCompleted
GT-3Y TestingCompleted
GT-3B TestingCompleted
Complete gasket
replacement of UT- completed.Transformer
3A testing completed
Gasket replacement
&protective device
replacement of UT-
3B Oil filtration completed
SWITCHYARD
AND TESTING
GROUP
UAT-3A replacement New UAT placed in
with new spare foundation and alignment
Transformer completed
ESP transformer
3A,3B,3D PTW CANCELLED
PM completed.Testing
completed.Box up in
ESP transformer 3C progress
PM & TESTING OF
400KV BAY
EQUIPMENTS COMPLETED
WW Sootblower2)Dry COMPLETED.
run
Alignment of Gen-LPT .
OH OF ELECTRICALLY BMD CLEARED-ALL EMD
OPERATED ACTUATORS CLEARED-ALL
FLOOD TEST VALVES
APH 08 no LOP's OH completed,coupled
CLEARED BY TMD-43 EMDtrial
clearance
03 PUMPSgiven
CLEARED(FLOOD TEST)REST
OH DONE. -43
PM COMPLETED. ALL 08
ALL ESP VACUUM DECOUPLED TRIAL
PUMPS CLEARANCE GIVEN.
ALIGNMENT
OH OF MILL SA FAN -B COMPLETED.COUPLING
EMD LT MOTOR CLEARANCES GIVEN.
BCW BOOSTER PUMP A
OH OF BCW BOOSTER READY.BCW BOOSTER PUMP
PUMP 3A&B B ALIGNMENT BY BMD IN
PROGRESS.
All 04 Clinker grinder OH COMPLETED. AHD
motors CLEARANCE AWAITED.
ESP PASS A
ESP
ESP ACMCC OH COMPLETED
CHECKING OF HOPPER
LEVEL PROBES & IN PROGRESS
HEATERS
HAG/CAG joint
checking done for mill
A to K. HAG-J
problem attended by
BMD
SADC calibration
completed.BMD on
job for scale fixing
Tray welding job
under progress inside
Pent House for
Thermocouples.
Protection &
Interlock joint
cheking of MFT
completed.
Feeder H calibration
done.
Turbine
thermocouples
installation in progress
OFFSITE DEPARTMENT
CW CW PUMP
CWPump 3C OH
completed
CW Pump 3A &3B
completed
Interconnection
valve inspection completed
3A Nozzle/Diffusion
ring replacement
completed
header valve
servicing and
inspection completed
Riser valve servicing
20/20 completed
PAINTING
I/P
Cooling tower 3B
cold basin
dewatering completed
side vegetation
cleaning 80% COMPLETED
3B#04 GB OH completed
RADIOGRAPHY
(NEW)
SUNIL HITECH-
6/2554
PRABHAT ENGG-
37/1052
IBR:SUNIL HT-26 PRABHAT:8
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
3A to 3E 3F to 3K
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
3J,3K 3J,3K
3J,3K 3J,3K
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
NIL NIL
3J,3K 3J,3K
3J,3K 3J,3K
3G,3K 3G,3K
3J,3K 3J,3K
NIL NIL
NIL NIL
3A SIDE NIL
TOMORROW ACTIVITY
NIGHT ACTIVITY PLANNED PLANNED SUPPORT
VIBRATION OK
GB ASSEMBLY
CT O/L WIRE MESH 10X10-
12/12
MATERIALS & SERVICES REQUIRED FOR
SN DESCRIPTION AGENCY
NTPC SIMHADRI-
2 HP CENTERING DEVICE RETURNABLE
9445003633 Reached
Reached
REQUIRED BY 22.9.17
REACHED SITE
BOILER AREA
SCAFFOLDING
WW/ S-PANEL
LTSH (65)
BENT TUBES
SAFETY VALVE
VALVE SERVICING
WE SB SERVICING
U3 OH ACTIVITY:::TSTPS 12.10.17
Removal i/p
COMPLETE.
COMPLETE.
COMPLETE.
COMPLETE.
COMPLETE.
CHECKING I/P