Keyplan

9150

P63
1 CL
-
Sta. 0+458.026 BRIDGE
Notes

Toc. 15.492 Concrete grade shall be as follows unless otherwise noted in respective drawing:
-Box fc' = 50 MPa
4800 -Box Pierhead fc' = 50 MPa
-Pier Column fc' = 40 MPa
-Pilecap fc' = 30 MPa
1200 2400 1200 -Boredpile fc' = 30 MPa

0.25% 0.25% Rebar grade :

350

350

350
850 - BJTD -40 fy = 400 MPa

1200

2141
2550

2550

2550
3700

3700

3700
1500

1500
Key to symbols
200

200
400
P63
800

800
2400
1200 2400 1200
16 16 16 16

16

16
11011

1950

1950
Reference drawings

8511
CL

50

50
4400

4400
400

400
2
7311

7311

7311

7311

7311
BRIDGE

50

50
-

1950

1950
B 01/03/2017 AS Change Of Dimension Pier PA AD JF

16

16
50 50 50 50 A 17/02/2017 AS PA AD JF

350 500 350 350 500 350 Rev Date Drawn Description Dsg'd
2000 1200 2400 1200 2000 4400

EL.+1.439 EL.+1.439

SECTION 2
SCALE 1 : 50 -

EL.-0.561 EL.-0.561

APPROVED BY VERIFIED BY

DRAWN BY Asep S CHECKED BY Ir. Arvila D, MT

DESIGNED BY Panca A, ST APPROVED BY Ir. Jodi F, MSE, Ph. D

JAKARTA LRT PROJECT - CORRIDOR 1 (PHASE 1)


KELAPA GADING - VELODROME PACKAGE P102

DIMENSION OF PIER P63 SECTION 1


SCALE 1 : 50 -
SCALE 1 : 50

DIMENSION OF PIER P63

Scale Scale Bar

1 : 50
Drawing Number Rev Status

P102/102/STR/4189 B T
D:\LRT SECTIONS 1 & 2\CIPTA GRAHA ABADI\Drawings (01-03-2017)\Dimension of Pier P62-P66.dwg, 08/03/2017 17:30:40