RA 7942 (Surface Rights)
RA 7942 (Surface Rights)
Easement Rights
1. Permittee/Permit Holder/Contractor pay just compensation
a. Amount agreed by the parties
b. In case of disagreement, file before the Panel of Arbitrators
2. Purpose: more convenient operations
a. Build, construct or install infrastructures
i. roads, railroads, mills, waste dump sites, tailings ponds, warehouses, staging or
storage areas and port facilities
ii. tramways, runways, airports, electric transmission, telephone or telegraph lines,
iii. dams and their normal flood and catchment areas
iv. sites for water wells, ditches, canals, new river beds, pipelines, flumes, cuts, shafts,
tunnels or mills
Voluntary Agreement
1. Entered between Permit Holders and surface owner, occupant or concessionaire
2. Enter into lands and use land for mining purposes
3. Registered with MGB regional office
4. Agreement shall be binding upon:
a. Parties
b. Heirs
c. Successors-in-interest
d. Assigns
56
1. Damage done to the property
a. As a consequence of mining operations, or
b. As a result of construction or installation of the infrastructure
2. Amount based on the agreement entered or in accordance with PD 512
3. In case of disagreement, or absence of agreement, file before Panel of Arbitrators
Posting of a Bond
1. Indemnitor : Permittee/Permit Holder/Contractor
2. Type of : Cash or surety bond from an accredited surety
Bond
3. Jurisdiction : Regional Office
4. Amount : Agreed by the parties
5. In case of 1. MGB – areas within mineral reservations/RD – areas
disagreement outside
2. Based on the type of land, value of trees, plants and
existing improvements
57