Sr. No. MR Document Clause as per MR Deviation HMEL Remarks
FOR Y STRAINERS, THE BOTTOM FLANGE SHALL
BE DESIGNED AS PER MANUFACTURERS ACCEPTABLE.
SCHEDULE FOR STRAINERS- (B018)
1 B018-444-WG-MR-3584 STANDARD AND NOT AS PER B16.5. -
DATASHEET
STRAINER BODY & BOTTOM FLANGE MOC
SHALL BE EQUIVALENT CASTING GRADE.
FOR BASKET STRAINERS, DESIGN SHALL BE AS NOTED, DRAWINGS
PER MANUFACTURERS STANDARD. ANY SUBMITTED POST ORDER,
SCHEDULE FOR STRAINERS- (B018) WILL BE REVIEWED AND
2 B018-444-WG-MR-3584 CHANGES POST ORDER SHALL NOT BE APPROVED BY -EIL.
DATASHEET
ACCEPTED. PLEASE FIND ATTACHED DRAWING
FOR YOUR REFERENCE.
EIL APPROVED VENDOR LIST SHALL BE REFERRED FOR PROCUREMENT OF RAW
3 VENDOR LIST -
NOTED
MATERIAL.
4 B018-444-WG-MR-3584 DELIVERY SHALL BE 12 WEEKS FROM DATE OF MANUFACTURING CLEARANCE.