EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The structure shall be plumbed, leveled, and braced before any final
12-SAMSS-008
1 bolted or welded connections are made. (PIP STS05130, Erection of
Sec. III.B
Structural and Miscellaneous Steel Specification, Sec. 6.3.2)
Anchor bolts shall be fully tightened only after the base plates have been
12-SAMSS-008
2 grouted. (PIP STS05130, Erection of Structural and Miscellaneous Steel
Sec. III.B.
Specification, Sec. 6.4.3)
Prior to initial snug tightening all connections and their components shall
be checked against the IFC Drawings and Specifications. 12-SAMSS-007
3
(AISC, Specification for Structural Joints using ASTM A325 or A490 Sec. 3.2
Bolts, Sec. 9.1)
After the connections have been assembled, it shall be ensured that the
plies of the connected elements have been brought into firm contact and 12-SAMSS-007
4
washers have been used as required. (AISC, Specification for Structural Sec. 3.2
Joints using ASTM A325 or A490 Bolts, Sec. 9.1)
All pretensioned joints shall be sung tightened first and shall be
inspected for the required match marking before and after pretensioning
12-SAMSS-007
5 as visual proof that the pretensioning has been accomplished.
Sec. 3.2
(AISC, Specification for Structural Joints using ASTM A325 or A490
Bolts, Sec. 9.2)
The inspector shall observe (for Turn of the Nut Method) the pre-
installation verification testing (minimum of 3 bolts) of each size, type 12-SAMSS-007
7
and grade of fasteners. (AISC, Specification for Structural Joints using Sec. 3.2
ASTM A325 or A490 Bolts, Sec. 9.2.1)
(Turn of the Nut Method) the Inspector shall insure, during routine
observation of the bolting crew, that the turned element relative to the
unturned element, has move the amount specified below: ________
Disposition of Outer Face of Bolted Parts
Bolt Both Faces Normal One Face Normal Both Faces Sloped 12-SAMSS-007
8 Length to Bolt Axis 2nd sloped < 1:20 less than 1:20 Sec. 3.2
L < 4db 1/3 turn 1/2 turn 2/3 turn
4db<L<8db 1/2 turn 2/3 turn 5/6 turn
L > 8db 2/3 turn 5/6 turn 1 turn
A pretension greater than that specified shall not be cause for rejection.
Page 1 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Structural Steel - Final Bolt Tightening Inspection and
SAIC-M-1027 18-May-05 Civil
Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
(Direct Tension Indicator Method) The Inspector shall observe the pre-
installation verification testing of fastener assemblies with direct tension
12-SAMSS-007
11 indicators (DTI) properly located and the method to be used.
Sec. 3.2
(AISC, Specification for Structural Joints using ASTM A325 or A490
Bolts, Sec. 9.2.4)
During routine observation, the inspector shall insure that the appropriate
feeler gage is refused in at least half of the spaces between protrusions. 12-SAMSS-007
12
(AISC, Specification for Structural Joints using ASTM A325 or A490 Sec. 3.2
Bolts, Sec. 9.2.4)
When snug tightening operation causes one half or more of the gaps
between these arch like protrusions to close to 0.015 inches or less the
12-SAMSS-007
13 direct tension indicator shall be replaced. (AISC, Specification for
Sec. 3.2
Structural Joints using ASTM A325 or A490 Bolts, Sec. 9.2.4
commentary)
REMARKS:
REFERENCE DOCUMENTS:
1- 12-SAMSS-008, "Erection of Structural and Miscellaneous Steel" Issued 28 January 2004
2- 12-SAMSS-007, "Fabrication of Structural and Miscellaneous Steel" Issued 28 April 2004
Page 2 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Installation Procedure Verification Testing of Turn-of-
SATR-M-2002 18-May-05 CIVIL- 0
Nut Method (ASTM A325 or ASTM A490 Bolts)
Attachment 1 --
TURN-OF-NUT Method: PRETENSIONING PROCEDURE
VERIFICATION TESTING per Specification for Structural Joints Using 12-SAMSS-008,
A
ASTM A325 or A490 Bolts, Para. 8.2 & & 9.2.1 (PIP STS05130, Para. Sec. I
6.5.1)
Prior to application, the bolted joint assembly was brought to snug tight
condition.
(NOTE: The connected plies are in firm contact after using a few 12-SAMSS-008,
A2
impacts of an impact wrench or the full effort of an ironworker using an Sec. I
ordinary spud wrench.) {AISC Specification for Structural Joints Using
ASTM A325 or A490 Bolts, Para. 8.2.1}
Attachment 2 --
TEST DETAILS & RESULT (Turn-of-Nut)
Tension Calibrator: Model/Type______________________ Date Calibrated: _________________ Date of Test: __________
Page 3 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pre-Installation Procedure Verification Testing of Turn-of-
SATR-M-2002 18-May-05 CIVIL- 0
Nut Method (ASTM A325 or ASTM A490 Bolts)
Bolt # 1 Bolt # 2 Bolt # 3 Bolt # 1 Bolt # 2 Bolt # 3
REMARKS:
REFERENCE DOCUMENTS:
1. 12-SAMSS-008, Erection of Structural and Miscellaneous Steel, (28 January, 2004)
2. PIP STS 05130, Erection of Structural and Miscellaneous Steel Specification, (February 2004)
3. Specification for Structural Joints Using ASTM A325 or A490 Bolts, (June 23, 2000)