PROJECT: PROPOSED 5 STOREY BUILDING WITH PENTHOUSE

LOCATION: 258 SAMSON ROAD CALOOCAN CITY


BILLING NO. 4
SUMMARY OF BILLING (AS OF JULY 31,2021)

REBARS
DIAMETER WEIGHT (KGS) UNIT COST (PHP) AMOUNT
10 mm PHP 4.50 0
12 mm PHP 4.50 0
16 mm 1412.31 PHP 3.50 4943.085
20 mm 917.352 PHP 3.50 3210.732
25 mm PHP 3.50 0
28 mm PHP 3.50 0
PHP 8,153.82

FORMWORKS
AREA (SQ. M) UNIT COST (PHP) AMOUNT
220 PHP 0.00

CONCRETING (KAPAG NABUHUSAN)


VOLUME (CU. M) UNIT COST (PHP) AMOUNT
200 PHP 0.00

BILLING AMOUNT PHP 8,153.82


slab
DIAMETER LENGTH PIECES KG/M TOTAL KGS UNIT COST (PHP) AMOUNT
16mm 3 16 1.578 75.744 3.5 265.104
16mm 9 79 1.578 1121.958 3.5 3926.853
4191.957

Column Splice/ Stiffiner Columns


DIAMETER LENGTH PIECES KG/M TOTAL KGS UNIT COST (PHP) AMOUNT
16mm 6 16 1.578 151.488 3.5 530.208
16mm 2 20 1.578 63.12 3.5 220.92
20mm 6 62 2.466 917.352 3.5 3210.732
3961.86