Professional Documents
Culture Documents
INFORME DE TAXIS
ITEM EMPRESA AP_PATERNO FIRST_NAME DNI FECHA MONTO
1 MEP TEQUEN AGUINAGA JOSE LUIS ALONSO 42235305 6/8/2020 S/20.00
2 MEP JURO LAZO DARCY 72409107 6/9/2020 S/63.00
3 MEP OBREGON SALAZAR ROBERT 10412506 6/9/2020 S/72.00
4 MEP RAMIREZ ROSALES DIEGO JUNIOR 47319874 6/10/2020 S/15.00
5 MEP ISPILCO TEJADA WILMER 46598060 6/10/2020 S/15.00
6 MEP VILLENA ABARCA JAIME 43699957 6/23/2020 S/16.00
7 MEP PALOMINO CHACONPERCY 18018432 6/23/2020 S/14.00
8 MEP TEQUEN AGUINAGA JOSE 42235305 6/24/2020 S/20.00
9 MEP ALMANACIN HUAMAMARIO 10670845 6/24/2020 S/19.00
10 MEP MORALES GAGO ROBERTO 16795352 6/24/2020 S/19.00
11 MEP PAREDES DE LA CRUWILSON ALFREDO 26725150 6/24/2020 S/19.00
12 MEP LAZARO JARA CARLOS 15719794 6/24/2020 S/19.00
13 MEP ARAUJO RONDON HORACIO 23966249 6/24/2020 S/19.00
14 MEP CALANCHO VASQUEGUISELA 73230367 6/24/2020 S/19.00
15 MEP SANCHEZ ARAPA PITER YASMANI 45752030 6/26/2020 S/18.00
16 MEP UMASI ALVAREZ FREDY 41377847 6/26/2020 S/18.00
17 MEP CHAPARRO QUISPE LUCIO ARTURO 21456031 6/26/2020 S/18.00
18 MEP
ALOJAMIENTO MEP
FECHA DE NACIMIENTO RUTA DE VIAJE POSICION TELÉFONO DÍA DE INTERNAMIENTO HOTEL
EN HOTEL
07/02/1980 LIMA - MINA OPERARIO TOPOGRAFO 945132365 08/06/2020 BTH SAN BORJA
03/07/1990 LIMA - MINA MONITOR DE EQUIPOS 942174331 09/06/2020 BTH SAN BORJA
08/12/1974 LIMA - MINA
OFICIAL MOVIMIENTO DE TIERRAS
999888347.00 30/05/2020 BTH SAN BORJA
06/01/1978 LIMA - MINA CHOFER DE BUS 971850068.00 18/06/2020 BTH LIMA GOLF
13/08/1977 LIMA - MINA SUPERVISOR DE CAMPO
917012139/943957541 18/06/2020 BTH LIMA GOLF
14/02/1978 LIMA - MINA INGENIERO SUPERVISOR 988393285.00 20/06/2020 BTH LIMA GOLF
26/02/1967 LIMA - MINA OP. TRACTOR D8 948400303.00 20/06/2020 BTH LIMA GOLF
23/08/1969 LIMA - MINAMECANICO I / LUBRICADOR 989291832 20/06/2020 BTH LIMA GOLF
06/01/1986 LIMA - MINA ALMACENERO 943176498 20/06/2020 BTH LIMA GOLF
28/10/1989 LIMA - MINAENFERMERA OCUPACIONAL948007153.00 20/06/2020 BTH LIMA GOLF
LIMA - MINA SUPERVISOR DE SSOMA
989485355 – 954591430 20/06/2020 BTH LIMA GOLF
11/04/1996 LIMA - MINA PEON VIGIA 937 737 837 22/06/2020 DANIEL`S
19/09/1974 LIMA - MINA INGENIERO RESIDENTE 975456403 22/06/2020 DANIEL`S
19/10/2001 LIMA - MINA PEON VIGIA 969030180.00 22/06/2020 DANIEL`S
31/12/1958
OP. EXCAVADORA (>200LIMA
HP)/OP.
- MINA
TRACTOR D6 /OP.CARGADOR948019490.00
FRONTAL / OP. RETROEXCAVADORA
22/06/2020 DANIEL`S
19/10/1978 LIMA - MINAOP. EXCAVADORA (>200 HP)958920048.00 22/06/2020 DANIEL`S
28/08/1986 LIMA - SUPERVISOR
MINA DE CONTROL DE CALIDAD
949757367 22/06/2020 DANIEL`S
02/09/1973 LIMA
OPERARIO
- MINACAPATAZ DE MOVIMIENTO
950153009/971238013
DE TIERRAS 24/06/2020 BTH LIMA GOLF
01/05/1981 LIMA - MINA OPERARIO PERFORISTA 929518314.00 25/06/2020 DANIEL`S
12/06/1982 OPERADOR
LIMA -DE
MINA
MAQUINARIA PESADA / FURUKAWA
958332859.00
ROCK DRILL 25/06/2020 DANIEL`S
12/07/1977 LIMA - MINA OFICIAL DE VOLADURA 974736864.00 25/06/2020 DANIEL`S
14/09/1962 LIMA - MINA INGENIERO SUPERVISOR 942652036.00 25/06/2020 DANIEL`S
HABITACION FECHA DE DESMOVILIZACION PRECIO DE DIAS DE HOTEL COSTO DE HOTEL
HOTEL
FECHA
DNI
10412506
10670845
15719794
16795352
18018432
21456031
23966249
26725150
41377847
42235305
43699957
45752030
46598060
47319874
72409107
73230367
(empty)
Total Result
$4,350.31
COSTO / DIA - (TAXIS)
- all - $403.00
Sum - MONTO
S/72.00
S/19.00
S/19.00
S/19.00
S/14.00
S/18.00
S/19.00
S/19.00
S/18.00
S/40.00
S/16.00
S/18.00
S/15.00
S/15.00
S/63.00
S/19.00
S/403.00
COSTO DE
OPERACION / DIA $36,558.52
$5,000.00
$4,500.00
$4,000.00
$3,500.00
$3,000.00
$2,500.00
$2,000.00
$1,500.00
$528.00
$1,000.00
$133.33
$105.00
$96.00
$500.00
$15.00
$15.00
$15.00
$15.00
$15.00
$15.00
$15.00
$15.00
$15.00
$15.00
$14.00
$12.12
$0.00
S N
BL
E
NA A O 4) 2) 1) 7) 4) 7) 5) 1) 3) 4)
BU GL I CI OR EN - 00 - 01 - 00 - 00 - 01 - 02 - 04 - 00 - 00 - 00 -0
0
TO 00 ST F I
A D
ÓG G G 8 T 8 T 8 T 8 T 8 T 8 T G G G
AU 50 BU O V TR K4 K4 (L
K
(L
K
(L
K
(L
K
(L
K M Y8 Y8 Y8
A M IP
O CA EC (L (L (L (L (L (L
GU O T EX L I A IA IA IA I A I A IA A IA IA IA
C R E AR AR AR AR AR AR AR RI R R R LL
O
A DE DO PO IN IN IN IN IN IN NA NA NA NA TI
DE A E U M
IN
M M M M M M M
I M
I
M
I
M
I
AR
A N N GR LU LU LU LU LU
RN ER TE LU LU LU LU LU LU M
E S T N
ST CI CO
CI
$25,000.00
$22,138.80
$20,000.00 $18,818.61
$15,000.00
$10,000.00
$5,000.00
$3,086.23
$1,780.00
$0.00 $69.17 $18.00 $0.00 $495.00 $320.00
$0.00
6,558.52
$4,350.31
$1,391.67
$910.80
$375.60
$236.33
$216.40
$116.67
$45.00
$15.00
$15.00
$15.00
$15.00
$2.38
$2.00
1) 3) 4) 6) O S A R O R S 2i E ul
t
- 00 - 00 - 00 - 00 LIC BU OR DO AF DLE GA 60- U ET es
U - D R U S R
8T G G G
RA RO VA T A AN OR B LQ al
Y8 Y8 Y8 IC AC OG EH R VO ot
(L (L (L H ID M X CA P S M L D E
DO T
IA IA IA O E M SI TE OR NA
N AR N AR N AR ILL T RO CO
CT O
I I I T O S
M M M AR RE LL TR
A
AP
I
LU LU M O DI O
R BR
VI
Total
$72.00
$80.00
$63.00
$70.00
$60.00
$40.00
$50.00
$40.00
$19.00
$19.00
$19.00
$19.00
$19.00
$19.00
$18.00
$18.00
$18.00
$30.00
$16.00
$15.00
$15.00
$14.00
$20.00
$10.00
$0.00
06 45 94 52 32 31 49 50 47 05 57 30 60 74 07 67 ty)
125 708 197 953 184 560 662 251 778 353 999 520 980 198 091 303 mp
4 6 7 7 0 4 9 7 3 2 6 7 5 3 4 2 (e
10 10 15 16 18 21 23 26 41 42 43 45 46 47 72 73
TARIFA LAGUNAS NORTE
10%
TARIFAS DE EQUIPOS - MOTA ENGIL PERÚ S.A. 2014
Camion volquete 26 T (6X4) Camión Volquete 6x4 17m3 /hm 220 $23.50 $23.50 $23.50
Camion volquete 26 T (6X4) Camión Volquete 6x4 Tolva Roquera /hm 220 $25.10
Excavadora sobre orugas 35 T Excavadora sobre Orugas Cat 336 /hm 200 $51.85 49.00 49.87
Tractores sobre orugas 40 T Tractor sobre Orugas D8T /hm 200 $78.50 77.50 78.50
Cargador Frontal 25 T Cargador Frontal 966H /hm 200 $54.84 48.90 50.30
Tractores sobre orugas 20 T Tractor sobre Orugas D6T /hm 200 $43.36 41.10 42.10
Unidades primarias Chancadora Primaria /hm $120.00 *
Carros de perforacion hidraulicos Perforadora hidraulica 200HP /hm 200 $112.61 52.70 112.61
Motoniveladoras 17 T Motoniveladora 140H /hm 200 $45.53 42.40 44.81
Camión Grúa Hiab - 9 Ton Camión Grúa Hiab - 9 Ton /hm $55.00 **
Retroexcavadora Cargador Retroexcavadora 420E /hm 200 $19.61 18.30 19.20
Camión Cisterna de Agua 15 M3 Camión Cisterna Agua 4000gln /hm 200 $19.60 18.10 19.60
Luminaria Luminaria LT4K /hm $5.00
Rodillo vibrador de suelos 10 T Rod. CS 533 10 Ton /hm 200 $18.29 17.30 18.06
Unidades secundarias / terciarias Chancadora Secundaria /hm $130.00 *
Zaranda Vibratoria Zaranda Vibratoria /hm $80.00 *
Excavadora sobre Orugas c/acop. p Excavadora sobre Orugas c/acop. picoton /hm 200 $60.00 49.00 49.87
Motobomba d=4"- 8HP Motobomba d=4"- 8HP /hm $4.50 Día
Martillo Hidraúlico para ExcavadoraMartillo Hidraúlico para Excavadora /hm $35.00
Excavadora sobre orugas 30 T Excavadora sobre Orugas Cat 320 /hm 200 $43.95 25.71 39.51
Zaranda estática Zaranda estática /hm $7.00 *
Perforadora Neumatica Perforadora Neumatica /hm $6.00 Día
Compresora Neumática 250 PCM - Compresora Neumática 250 PCM - 240 HP /hm $11.00 **
Plancha Compactadora Vib. 4HP Plancha Compactadora Vib. 4HP /hm $3.60 Día
Bomba de Concreto Bomba de Concreto /hm $13.50 **
Vibrador de Concreto-5HP Vibrador de Concreto-5HP /hm $2.40 Día
Mezcladora de Conc. c/Trompo 11 Mezcladora de Conc. c/Trompo 11p3-23HP /hm $6.50 Día
Camión tracto FMX 6X4T Camión tracto FMX 6X4T /hm 200 $28.49 16.31 28.42
Camabaja Fameca Camabaja Fameca /día $87.85 Día
La Gestión de Equipos (GE) se hace cargo de todos los costos relacionados con:
· Posesión;
· Mantenimiento preventivo, incluido repuestos y materiales;
· Reparaciones de Componentes;
· Reparaciones como consecuencia del desgaste normal;
· Lubricación y filtros;
· Reemplazo de llantas como consecuencia del desgaste normal;
· Material de desgaste como consecuencia del desgaste normal, no se incluye lo material de desgaste de los equipos de perforación, reciclado, barredoras y martillos;
· Tren de rodamiento como consecuencia del desgaste normal;
· Mano de obra necesaria para hacer la gestión y mantenimiento de los equipos propios. Eventuales exigencias del cliente o doble turno serán costo de obra.
· Camioneta, equipos de apoyo y su combustible para los mantenimientos de los Equipos.
· Overhaul;
· Movilización de reemplazos de equipos por motivos de avería;
· Revisiones técnicas de acuerdo a ley e Impuesto vehicular;
· Suministro de documentación técnica de los equipos;
· Seguros TREC y SOAT;
· Multas por cuestiones de licencias o falta de documentación legal del equipamiento.
El Centro de costes de la Obra se hace cargo de todos los costos relacionados con:
· Energía (combustible, electricidad, etc.) para alimentación de los equipos y su suministro;
· Movilización y desmovilización de los equipos desde y hacia la obra;
· Transportes efectuados dentro de la propia obra/c. costos;
· Operadores / conductores;
· Chequeo y mantenimiento preventivo diario de acuerdo con el manual de operación del fabricante del equipo (Engrase, revisión de niveles, etc.)
· Accidente/ negligencia/ mala operación;
· Cambio de faros, parabrisas, vidrios y espejos por rotura, rajadura o quiñes observados por seguridad.
· Inflado y reparación o reposición de llantas debido a cortes laterales, impactos, cortes en banda por patinaje y similares.
· Material de desgaste en terreno agresivo (la diferencia del desgaste normal);
· Multas por negligencia de operación/ conducción;
· Montaje/ desmontaje para transporte entre obras;
· Equipos de apoyo para montaje y desmontaje de equipos;
· Gastos incurridos para la habilitación del equipo por motivo del estándar de la obra;
· Costos extra por orden del cliente (choferes de camioneta, exámenes médicos, inducciones, EPP’s);
· Alimentación, alojamiento y transportes de personal dentro de obra;
· Infraestructura del taller y oficinas;
· Períodos de inmovilización causados por accidentes, negligencias y temas sociales.