FIRE FIGHTING SYSTEM WEEKLY INSPECTION REPORT
REHABILITATION OF MARINE O11,
Project Title: L JETTY #2 SEC-RPP [Contract No. [400012601
Area/Location: Panel No. oe
inspector name: ASHAFAQ ALI KHAN Date: 10-08-2021
Mark "X" inside the box|
Ok Not NA
ok
1 FIRE ALARM SYSTEM
1.1. |Check all components / devices are free from physical damage,
1.2. |Check all components / devices are protected from dust & water.
ICheck FACPs, Auxiliary Power Supply etc. cabinet doors are operable
13 |i tocks property working
[Check all the detection device are working satisfactory in Order.
AIK ISIS
14
2 FOAM WATER DELUGE SYSTEM
‘21. |Veriy thatthe isolation valve on downstream side of deluge valve is
jopen.
Verify he inlet and outlet pressure gauges in deluge valve is reading the
22 line pressure.
2.3. [Vert that there is no water passing through deluge valve
2.4. {Verify the level of foam solution in foam bladder tanks,
25 | verity the foam FCV is working freely
2.6 |Check Manual Pull Station near the exit / entrance door are easi
accessible.
27 |Veniv the level of foam in foam blader tank
Verify the niet and outlet valves of foam bladder tank is open.
<)