You are on page 1of 4
FIRE FIGHTING SYSTEM WEEKLY INSPECTION REPORT REHABILITATION OF MARINE O11, Project Title: L JETTY #2 SEC-RPP [Contract No. [400012601 Area/Location: Panel No. oe inspector name: ASHAFAQ ALI KHAN Date: 10-08-2021 Mark "X" inside the box| Ok Not NA ok 1 FIRE ALARM SYSTEM 1.1. |Check all components / devices are free from physical damage, 1.2. |Check all components / devices are protected from dust & water. ICheck FACPs, Auxiliary Power Supply etc. cabinet doors are operable 13 |i tocks property working [Check all the detection device are working satisfactory in Order. AIK ISIS 14 2 FOAM WATER DELUGE SYSTEM ‘21. |Veriy thatthe isolation valve on downstream side of deluge valve is jopen. Verify he inlet and outlet pressure gauges in deluge valve is reading the 22 line pressure. 2.3. [Vert that there is no water passing through deluge valve 2.4. {Verify the level of foam solution in foam bladder tanks, 25 | verity the foam FCV is working freely 2.6 |Check Manual Pull Station near the exit / entrance door are easi accessible. 27 |Veniv the level of foam in foam blader tank Verify the niet and outlet valves of foam bladder tank is open. <)

You might also like