Mumbai Port : Its Place in the Sun
Over 145 years of contribution to country’s
EXIM trade and Mumbai City’s growth (Estd. 1873)
Multi cargo Port – Berths adaptable to all
types of cargo viz Iron & Steel , Project Cargo ,
Cement, Fertilisers etc
Exported 2,27,484 automobiles in 2017-18
Traffic 62.83 MT in 2017-18
Mumbai Port … A Complete Port
• Liquid Bulk
• Dry Bulk
• Container
• Break Bulk
• Ro – Ro
• Automobiles
• Heavy Lift
• Coastal
• Cruise
• Dry Docking
• CFS
• Railway Network
4
FACILITIES : Petroleum Oil Liquid (POL)
• OCT Berths
• 2 Berths
• Draft 13.5 Mtrs. Maintained at 10 mtrs
FACILITIES : General Cargo
50
40
DADAR
PIRPAU
TIMBERPOND
NORT
H
BOMBAY
CENTRAL MAZAGONDOCK
Offshore JAWAHAR ELEPHANTA
Container DWEEP ISLAND
LL
Terminal
HI
AR
PRINCE'SDOCK
LB
VICTORAI DOCK
MA
NAVALDOCKYARD
NAVAL
FSRU JETTY
MORA
SASOON
PANJE
FISHHARBOUR
NEL
HAN
INC
Deepening DEFENCE
MA
INSTALLATIONS
of channel 18
MUMBAI HARBOUR
DRGNO : 36 /2004
OCT PROJECT LAYOUT OF APPROACH TRESTLE,
TWO CONTAINER BERTHS
19
Restructuring of the project is on the anvil
Salient Features of OCT
Project initially designed for containers
Being restructured for Auto, General Cargo
and Containers
Capacity for – 5.5 MMT
Capital cost – Rs.1290 Crore (USD 195
Million)
Designed Draft-13.5 mts. However
maintained at present at 10 mts.
Handling Facility For Liquid Cargo
5th Oil Berth at Jawahar Dweep/SPM for
Suez-Max Vessels
PPP project
Capacity 5 MMTPA
Capital Cost Rs 2690 crores
18 February
Bidding process completed, awaiting CCEA clearance
Other Initiatives
Ongoing Projects – Wadala – Kurla Rail Line
NORTH
WESTERN&NORTHERN
RAILWAY
TOWARDSTUGHLAKABAD
VIRAR N.T.S.
BORIVALI
DIVA
( 42km)
Will ease Rail
THANE
( 33km)
SOUTHERNRAILWAY
TOWARDSPUNE evacuation
EEK
ARABI N SEA
E CR
KURLA
THA
( 15km)
VASHI
( 28km)
MAHIMJN. PANVEL
* ( 66km)
BELAPUR * WADALATOKURLADEDICATEDCORRIDOR
DADAR JNPT ISCRITICALTOBOTPROJECT.
(10km)
WADALA ( 93km)
JASSAI
RAOLI ( 9km) * CENTRALRAILWAYCOMMISIONEDRITESTOSTUDY.
MUMBAI HARBOUR
URAN LEGEND
PEN
( 103km)
MUMBAI
THAL
PROPOSEDCENTRALRAILWAYADDITIONAL
TOWORDS
DOCKS
CENTRAL FIFTH&SIXTHLINESSHOWNTHUS
KOKANRAILWAY
C. R. EXISTINGLINESSHOWNTHUS
MbPT
CST
ADDITIONALCORRIDORBETWEEN
CHURCH
GATE
MUMBAI WADALATOKURLASHOWNTHUS
MbPTRAILWAYSHOWNTHUS
WESTERNRAILWAYSHOWNTHUS
KOKANRAILWAYSHOWNTHUS
Rs. 177 Cr. – 4.5 K.m.- 8 rakes 23 rakes – 7 MMTPA – Bypasses Suburban Traffic.24
Sea-Plane
back