ANNEXURE TO SCC
ANNEXURE- A-XIX
VENDOR LIST
FOR
CIVIL / STRUCTURAL ITEMS
Page 1 of 5
ANNEXURE- A-XIX
VENDOR LIST
Bidding Document No.: IBCE-6373-C00-PJM-TEN-EPCC-14
Sr.
VENDORS COUNTRY
No.
CIVIL ITEMS
A CEMENT
3 ACC INDIA
4 GRASIM INDIA
7 J K CEMENT INDIA
B STRL. STEEL
1 SAIL INDIA
2 TISCO INDIA
3 VIZAG STEEL (RINL) INDIA
C RE-BARS
1 SAIL INDIA
2 TISCO INDIA
3 VIZAG STEEL (RINL) INDIA
4 JINDAL STEEL (JSPL & JSW) INDIA
D PAINTS
Page 2 of 5
ANNEXURE- A-XIX
VENDOR LIST
Bidding Document No.: IBCE-6373-C00-PJM-TEN-EPCC-14
Sr.
VENDORS COUNTRY
No.
2 BERGER PAINTS INDIA
F ALUMINIUM SECTIONS/SHEETS
1 BALCO INDIA
2 HINDALCO INDIA
3 JINDAL INDIA
4 NALCO INDIA
G EPOXY COATING
1 BASF INDIA
2 FOSROC INDIA
3 PIDILITE INDIA
4 SIKA INDIA
Page 3 of 5
ANNEXURE- A-XIX
VENDOR LIST
Bidding Document No.: IBCE-6373-C00-PJM-TEN-EPCC-14
Sr.
VENDORS COUNTRY
No.
4 LLOYD INSULATION INDIA
I FALSE FLOORING
J FALSE CEILING
K GROUTING MATERIAL
1 BASF INDIA
2 FOSROC INDIA
3 SIKA INDIA
4 FAIRMATE INDIA
3 NEWKEM INDIA
Page 4 of 5
ANNEXURE- A-XIX
VENDOR LIST
Bidding Document No.: IBCE-6373-C00-PJM-TEN-EPCC-14
Sr.
VENDORS COUNTRY
No.
N CONCRETE ADMIXTURES
5 BASF INDIA
6 FOSROC INDIA
7 PIDILITE INDIA
O WELDING ELECTRODES
D & H WELDING ELECTRODES(I)
1 INDIA
LIMITED
2 MODI ARC ELECTRODES CO. INDIA
3 ADOR WELDING INDIA
1. Other Items: The CONTRACTOR shall get the prior approval of Engineer-in-Charge/Owner
before placing order on any particular Vendor.
Notes:
1. Contractor shall submit Manufacturer’s Test Certificate for batches of Items procured and
delivered at site. Other specific requirements (if any) in this connection as mentioned in the
SCC of the Bidding Document shall also be complied with by the Contractor.
2. For procurement of Items from vendors other than those listed above, CONTRACTOR shall
obtain prior specific approval from Consultant/ OWNER by submitting all docum entary
evidences. However, delay if any, by Owner/Consultant in approving any vendors
proposed by the Contractor, or rejection, if any by Owner/Consultant of any vendor (s)
proposed by Contractor, shall not entitle the Contractor for any time extension or cost
implication.
3. Other Procured Items are subject to TPI (Third Party Inspection) and Inspection
Release. In case of TPI, cost of appointing TPI Agency shall be borne by the
contractor.
Page 5 of 5