Professional Documents
Culture Documents
Improvement Plan
Improvement Plan
No Items Issues
1 TX Nodes Visibility 1.We have only 21 % which is 489 node count out of 2185
nodes visibility of Ericsson TX nodes .
2. We only have View writes .
2 Alarm clearance drive 1.Will are unable to fetch alarms & performance reports due E
3
Packet Congestion links 1. Competency issue with NEC .
2. Visibility issue of Ericsson nodes
4
Rings status check
5
Improvement Plan
1.Planning need to prepare and share the IP plan for TX nodes and network to avoid IP
conflict and share with us .
2. Ericsson to share read writes to work on visibility issues after the plan.
2. 1st we will do configurations of IP's on each unmanaged TX nodes from BO and raise
WO to the field if required their support to get is visible .
3. Once IP configuration done and IP starting pinging on server , will make it discover
through server and make the node visible on SO-eM.
4. Remove/Delete all duplicate TX Nodes from the server .
1. Will fetch the alarm direct from the Servers & analysis them.
2. Will analysis the alarms and assign the task based on support requirements from BO
or raise WO to get support from Field team .
3.Will start alarm clearance drive for OSN , Ceragon and NEC with the help of Local team
and BO team .
4. Will work on the Ericsson visibility once the plan received from planning
5. Will share daily tracker with progress update.
1. We fetch the at least 5 days packet link utilization report from the servers.
2. Will check & compare the bandwidth and utilization for all packet links .
3. Those link which are running from above 70% utilization .
4.Will share all high Utilization link with planning to get new plan for up gradation.
5. Will do upgrade the link based on plan to avoid any link interference issues .
6. Daily share the progress update .
5
5
Items
TX Nodes Visibility
Limited visibility (Only 21 %) which is 489 node count out of 2185 nodes
visibility of Ericsson TX nodes Soe_m while the remaining are not.
Reliability test
Reliability test
Improvement Plan
1.Work with Planning team to prepare the IP plan for TX nodes and
network to avoid IP conflict and share with us .
2. Base on the consolidated data to be received from Ericsson before
Exit ,we will commence validation towards ensuring visibility issues is as
planned.
2. Configurations of IP's on each unmanaged TX nodes from BO and raise
WO to the field if required their support to get is visible .
3. Once IP configuration done we will ensure node visible on SO-eM is
closed on priority.
4. Remove/Delete all duplicate TX Nodes from the server .
1. Fetch the available alarms directly from the Servers for analysis while
other are pull manually.
2. Analyze the alarms and assign the task based on support requirements
from BO or raise WO to get support from Field team .
3.Coomenced alarm clearance on the OSN , Ceragon and NEC with the help
of Local team, Field and BO team .
4. Align on the visibility plan above once the plan received from planning
3. Re-define the protection for TDM and IP sites if any fails during the test.