Routing Slip Data DNKD: Data Informasi Contractor Information
Routing Slip Data DNKD: Data Informasi Contractor Information
NOT INCLUDED
No rails will be installed. Ground to be prepped by owner. Stairs to be painted by owner.
COMPANY PROPOSAL
We, Fabrikam, Inc., propose the above scope of work, to be completed by 7/14/2011 for the amount of $476.43.
OWNER ACCEPTANCE
I, Michael Tucker, do accept the above scope of work, proposed to be completed by 7/14/2011 for the amount of $476.43.
I, Michael Tucker, do accept the above scope of work, proposed to be completed by 7/14/2011 for the amount of $476.43.
Subtotal $443.19
Tax rate 7.50%
Tax $33.24
Grand total $476.43
Page 3 of 4
BREAKDOWN OF MATERIALS AND COSTS
TOTAL NOTES
Err:507 Err:507
Err:507 Err:507
Err:507 Err:507 Err:507
Err:507 Err:507
Err:507 Err:507
Err:507 Err:507 Err:507 Err:507