Vishwakarma Institute of Information Technology Assignment No. 4 Work out quantities of steel reinforcement for slab, beam, column, column footing and prepare a bar bending schedule. All dimensions are in mm Assume cover of 40mm. Department of Civil Engineering Vishwakarma Institute of Information Technology Schedule for column & footin: Sr. | Column | Size (in No. | No. mm) Steel in Column Footing size in Reinforcement plan in footing 1 C1, C2, | 230 x 450 C3, C4 Main steel 8 no. 16 mm @ 1000 x 1200 mm 10mm 9 @ Links 6 mm 9 @ 180mm Trapezoidal footing, | 125mm c/c c/e D=450mm, both ways d=250mm Schedule of Beams Sr. | Beam No. | Size in mm Steel in Beam No. 1 BI, B3 230 x 400 Top 2 no. 12mm Bottom 2 no. 12 mm 9g plus | no. 16 mm g bent up Stirrups 6mm @, 8 no. @ 125 mm c/c from each end and rest at 200mm c/c 230 x 400/300 Top 2 no. 16mm (trapezoidal beam) | Bottom 2 no. 16 mm 9g return from top Stirrups 6mm 9, @ 150 mm c/c 230 x 450 Top 2 no. 12mm@ Bottom 3 no. 12 mm @ Stirrups 6mm @, 5 no. @ 125 mm c/c from each end and rest at 200mm c/c 230 x 300 Top 2 no. 10 mm @ Bottom 3 no. 12 mm @ Stirrups 6mm g, @ 200mm c/c Schedule of Slabs Slab No. Steel in Slab $1 — two-way — 120mm thick 10mm 9 @ 180mm c/c, alternate bar bent up both ways Assume torsional steel at 4 corners at top and bottom in span 1;/8 x ly/8 6mm 9 @ 125mm c/c both ways S2 — one-way — 100mm thick Main steel 10mm @ @ 160mm c/c Distribution steel 6mm @ @ 230mm c/c Weight of steel bars Diameter of bar in mm Weight in kg/m Diameter of bar in mm Weight in kg/m 6 0.22 16 1.58 8 0.39 18 2.00 9 0.50 20 2.46 10 0.62 22 2.98 12 0.89 25 3.85 Department of Civil Engineering BAR BENDING SCHEDULE FOR FOOTING br.Nq Type of Bar | Dia |No.|Length(m)|Total Length] Weight | Total Weight(kg)| ss Po mmy im) teem | 1] x-direction | 10 [10] 1.22 0.616 Y-direction | 10 | 9 [14 0.616 J fo Total weight of steel for one footing =15.29 kg BAR BENDING SCHEDULE FOR COLUMN BAR BENDING SCHEDULE FOR SLAB | b) | Distribution |_| Bars | [| ff Total Weight of 6 _| 5 | 0.4662 Total weight of s Total weight of stee' BAR BENDING SCHEDULE FOR BEAMS Length(m)] Total Length Weight | Total Weight (kg) (ke/m) | ee | 88.595 0.222 10.7625 Total weight of steel for one column =99.36 kg IR.NI Type of Bar | Dia | No |Length(m)} Total Length WEight Total Weight (kg) Pf ffm) rm) kam) | 1]onewaystab] | ff | a) | Mainbars | 10 | 25| 1.7668 44.17 0.616 27.223 0.2218 5.6044 | 2 |twowaystabl | ff |a)[Bentupbars| | [| f |_| x-direction y-direction Total weight of steel for bent up bars =153.318 kg |b) | Tortionsteel] | [of |_| x-direction | 6 | 6{ 0591 | 3547 | 0.2218 | 0787 | |_| Y-direct teel used for tortion steel=1.304 ky and at top and bottom=total weight *8=10.432 kg steel for one way slab=32.827 kg| used in tortion steel bars at 4 corr r.Nq type of Bar | dia | No |Length(m)}Total Length| Weight Total Weight (kg) (mm) (m) (kg/m) A)| B1 and B3 Top main Bar} 12 | 2 5.422 10.844 0.887 9.624 |_| Bottom Bar | 12 | 2] 5.422 | 10844 | 0887 | 9.624 | |_| Bentupbars | 16 | 1] 5.703 | 5.703 | 1578 | 3.997 | |_| stirrups | 6 [25] 1108 | 277 | 2218 | 6146 | ; [| [| J fo] Total weight of steel used in B1 and B3=34.391 kg [@)| paandes | | PP |__|Topmain Bar| 16 | 2 | 1661 | 3322 | 15778 | 5.2415 | |_| BottomBar | 16 | 2] 2575 | 5.15 | 15778 | 3125 | |_| stirrups | 6 | 9] 7524 | 7524 | 2218 | 16694 | | i ee eee Total weight of steel used in B2 and B4=15.036 kg | {| | ro rope a2 [a aa | —aaea | oars | 7a J |_| Bottom Bar | 12 | 9 | 4.422 | 13.266 | o8e7s | 11773 | |_| stirrups | 6 [17] 1.208 | 20536 | 0.2218 | 4556 | ; [| f J tf] Total weight of steel used in BS and B6=24.178 kg | | poy} em | |_|TopmainBar| 10 | 2] 414 | 828 | o6163 | 51029 | |__| Bottom Bar | 12 | 3 | 4.132 | 12396 | 08875 | 11001 | |_| _Serrups | 6 [us| 327 | sees | 02218 | _3055 | = pp TT Total weight of steel used in B7=29.1589 kg _|

You might also like