Schedule for column & footin:
Sr. | Column | Size (in
No. | No. mm)
Steel in Column Footing size in Reinforcement
plan in footing
1 C1, C2, | 230 x 450
C3, C4
Main steel 8 no. 16 mm @ 1000 x 1200 mm 10mm 9 @
Links 6 mm 9 @ 180mm Trapezoidal footing, | 125mm c/c
c/e D=450mm, both ways
d=250mm
Schedule of Beams
Sr. | Beam No. | Size in mm Steel in Beam
No.
1 BI, B3 230 x 400
Top 2 no. 12mm
Bottom 2 no. 12 mm 9g plus | no. 16 mm g bent up
Stirrups 6mm @, 8 no. @ 125 mm c/c from each end and
rest at 200mm c/c
230 x 400/300 Top 2 no. 16mm
(trapezoidal beam) | Bottom 2 no. 16 mm 9g return from top
Stirrups 6mm 9, @ 150 mm c/c
230 x 450
Top 2 no. 12mm@
Bottom 3 no. 12 mm @
Stirrups 6mm @, 5 no. @ 125 mm c/c from each end and
rest at 200mm c/c
230 x 300
Top 2 no. 10 mm @
Bottom 3 no. 12 mm @
Stirrups 6mm g, @ 200mm c/c
Schedule of Slabs
Slab No.
Steel in Slab
$1 — two-way — 120mm thick
10mm 9 @ 180mm c/c, alternate bar bent up both ways
Assume torsional steel at 4 corners at top and bottom in span 1;/8 x ly/8
6mm 9 @ 125mm c/c both ways
S2 — one-way — 100mm thick
Main steel 10mm @ @ 160mm c/c
Distribution steel 6mm @ @ 230mm c/c
Weight of steel bars
Diameter of bar in mm
Weight in kg/m Diameter of bar in mm Weight in kg/m
6
0.22 16 1.58
8
0.39 18 2.00
9
0.50 20 2.46
10
0.62 22 2.98
12
0.89 25 3.85
Department of Civil EngineeringBAR BENDING SCHEDULE FOR FOOTING
br.Nq Type of Bar | Dia |No.|Length(m)|Total Length] Weight | Total Weight(kg)| ss
Po mmy im) teem
| 1] x-direction | 10 [10] 1.22 0.616
Y-direction | 10 | 9 [14 0.616
J fo Total weight of steel for one footing =15.29 kg
BAR BENDING SCHEDULE FOR COLUMN
BAR BENDING SCHEDULE FOR SLAB
| b) | Distribution
|_| Bars
| [| ff
Total Weight of
6 _| 5 | 0.4662
Total weight of s
Total weight of stee'
BAR BENDING SCHEDULE FOR BEAMS
Length(m)] Total Length Weight | Total Weight (kg)
(ke/m) |
ee | 88.595
0.222 10.7625
Total weight of steel for one column =99.36 kg
IR.NI Type of Bar | Dia | No |Length(m)} Total Length WEight Total Weight (kg)
Pf ffm) rm) kam)
| 1]onewaystab] | ff
| a) | Mainbars | 10 | 25| 1.7668 44.17 0.616 27.223
0.2218 5.6044
| 2 |twowaystabl | ff
|a)[Bentupbars| | [| f
|_| x-direction
y-direction
Total weight of steel for bent up bars =153.318 kg
|b) | Tortionsteel] | [of
|_| x-direction | 6 | 6{ 0591 | 3547 | 0.2218 | 0787 |
|_| Y-direct
teel used for tortion steel=1.304 ky
and at top and bottom=total weight *8=10.432 kg
steel for one way slab=32.827 kg|
used in tortion steel bars at 4 corr
r.Nq type of Bar | dia | No |Length(m)}Total Length| Weight Total Weight (kg)
(mm) (m) (kg/m)
A)| B1 and B3
Top main Bar} 12 | 2 5.422 10.844 0.887 9.624|_| Bottom Bar | 12 | 2] 5.422 | 10844 | 0887 | 9.624 |
|_| Bentupbars | 16 | 1] 5.703 | 5.703 | 1578 | 3.997 |
|_| stirrups | 6 [25] 1108 | 277 | 2218 | 6146 |
; [| [| J fo] Total weight of steel used in B1 and B3=34.391 kg
[@)| paandes | | PP
|__|Topmain Bar| 16 | 2 | 1661 | 3322 | 15778 | 5.2415 |
|_| BottomBar | 16 | 2] 2575 | 5.15 | 15778 | 3125 |
|_| stirrups | 6 | 9] 7524 | 7524 | 2218 | 16694 | |
i ee eee Total weight of steel used in B2 and B4=15.036 kg
| {| |
ro rope a2 [a aa | —aaea | oars | 7a J
|_| Bottom Bar | 12 | 9 | 4.422 | 13.266 | o8e7s | 11773 |
|_| stirrups | 6 [17] 1.208 | 20536 | 0.2218 | 4556 |
; [| f J tf] Total weight of steel used in BS and B6=24.178 kg
| |
poy} em |
|_|TopmainBar| 10 | 2] 414 | 828 | o6163 | 51029 |
|__| Bottom Bar | 12 | 3 | 4.132 | 12396 | 08875 | 11001 |
|_| _Serrups | 6 [us| 327 | sees | 02218 | _3055 | =
pp TT Total weight of steel used in B7=29.1589 kg _|