FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE

STATE OF
GUJRAT
Current status of Box Type Structure
Span Thickness/
Sr. No. Chainage Structure Type Type of Construction Span (GAD Skew Item Nos Length Width Quantity
(P&P) Height
1 100+450 3x3.7 Minor Bridge New Construction 3x3.7 6O PCC 1 30.411 7.000 0.100 21.288
2 100+450 3x3.7 Minor Bridge New Construction 3x3.7 6O Raft 1 30.203 6.800 0.450 92.421
3 100+450 3x3.7 Minor Bridge New Construction 3x3.7 6O Wall 2 30.203 0.300 2.150 38.962
4 100+450 3x3.7 Minor Bridge New Construction 3x3.7 6O Hunch 2 30.203 0.150 0.150 1.359
5 100+450 3x3.7 Minor Bridge New Construction 3x3.7 6O Slab 1 30.203 6.800 0.425 87.287
6 100+450 3x3.7 Minor Bridge New Construction 3x3.7 6O Approch Slab PCC 4 3.600 12.200 0.100 17.568
7 100+450 3x3.7 Minor Bridge New Construction 3x3.7 6O Approch Slab 4 3.500 12.200 0.300 51.240
Total Quantity 310.125

1 101+230 3x3.7 Minor Bridge New Construction 3x3.7 PCC 1 25.200 12.400 0.100 31.248
2 101+230 3x3.7 Minor Bridge New Construction 3x3.7 Raft 1 25.000 12.200 0.400 122.000
3 101+230 3x3.7 Minor Bridge New Construction 3x3.7 Wall 2 25.000 0.300 2.145 32.175
4 101+230 3x3.7 Minor Bridge New Construction 3x3.7 Wall 2 25.000 0.250 2.145 26.813
5 101+230 3x3.7 Minor Bridge New Construction 3x3.7 Hunch 12 25.000 0.150 0.150 6.750
6 101+230 3x3.7 Minor Bridge New Construction 3x3.7 Slab 1 25.000 12.200 0.375 114.375
7 101+230 3x3.7 Minor Bridge New Construction 3x3.7 Approch Slab PCC 2 3.600 12.400 0.100 8.928
8 101+230 3x3.7 Minor Bridge New Construction 3x3.7 Approch Slab 2 3.500 12.200 0.300 25.620
Total Quantity 367.909

1 102+507 1x6.2 Minor Bridge Reconstruction 1x6.2 Skew 6 PCC 1 29.376 12.400 0.100 36.426
2 102+507 1x6.2 Minor Bridge Reconstruction 1x6.2 Skew 6 Raft 1 29.175 12.200 0.400 142.374
3 102+507 1x6.2 Minor Bridge Reconstruction 1x6.2 Skew 6 Wall 2 29.175 0.300 2.145 37.548
4 102+507 1x6.2 Minor Bridge Reconstruction 1x6.2 Skew 6 Wall 2 29.175 0.250 2.145 31.290
5 102+507 1x6.2 Minor Bridge Reconstruction 1x6.2 Skew 6 Hunch 12 29.175 0.150 0.150 7.877
6 102+507 1x6.2 Minor Bridge Reconstruction 1x6.2 Skew 6 Slab 1 29.175 12.200 0.375 133.476
7 102+507 1x6.2 Minor Bridge Reconstruction 1x6.2 Skew 6 Approch Slab PCC 2 3.600 12.400 0.100 8.928
8 102+507 1x6.2 Minor Bridge Reconstruction 1x6.2 Skew 6 Approch Slab 2 3.500 12.200 0.300 25.620
Total Quantity 423.540

2 103+798 1x3.0 Box Culvert Reconstruction

3 107+623 1x11.0 Minor Bridge Reconstruction 2x5.5 Skew 12 PCC 1 28.834 12.250 0.100 35.322
107+623 1x11.0 Minor Bridge Reconstruction 2x5.5 Skew 12 Raft 1 28.629 12.050 0.450 155.241
107+623 1x11.0 Minor Bridge Reconstruction 2x5.5 Skew 12 Wall 2 28.629 0.400 3.019 69.145
107+623 1x11.0 Minor Bridge Reconstruction 2x5.5 Skew 12 Wall 1 28.629 0.250 3.019 21.608
107+623 1x11.0 Minor Bridge Reconstruction 2x5.5 Skew 12 Hunch 8 28.629 0.150 0.150 5.153
107+623 1x11.0 Minor Bridge Reconstruction 2x5.5 Skew 12 Slab 1 28.629 12.050 0.400 137.992
107+623 1x11.0 Minor Bridge Reconstruction 2x5.5 Skew 12 Approch Slab PCC 2 3.600 12.250 0.100 8.820
107+623 1x11.0 Minor Bridge Reconstruction 2x5.5 Skew 12 Approch Slab 2 3.500 12.050 0.300 25.305
Total Quanti 458.585

4 107+952 1x1.2 Pipe Culvert Reconstruction


5 108+588 1x2.0 Slab Culvert Reconstruction
6 108+710 1x7.5x4.5 CUP New Construction 1x7.0x4.50
7 108+900 1x2.6 Slab Culvert Reconstruction

8 109+240 2x10.8 Minor Bridge Reconstruction 4x5.4 PCC 1 28.200 23.350 0.100 65.847
9 109+240 2x10.8 Minor Bridge Reconstruction 4x5.4 Raft 1 28.000 23.150 0.450 291.690
10 109+240 2x10.8 Minor Bridge Reconstruction 4x5.4 Wall 2 28.000 0.400 3.785 84.784
11 109+240 2x10.8 Minor Bridge Reconstruction 4x5.4 Wall 3 28.000 0.250 3.785 79.485
12 109+240 2x10.8 Minor Bridge Reconstruction 4x5.4 Hunch 16 28.000 0.150 0.150 10.080
13 109+240 2x10.8 Minor Bridge Reconstruction 4x5.4 Slab 1 28.000 23.150 0.400 259.280
14 109+240 2x10.8 Minor Bridge Reconstruction 4x5.4 Approch Slab PCC 2 3.600 23.350 0.100 16.812
15 109+240 2x10.8 Minor Bridge Reconstruction 4x5.4 Approch Slab 2 3.500 23.150 0.300 48.615
Total Quanti 856.593

9 109+681 1x2.9 Box Culvert Reconstruction


10 112+260 1x12.5x5.5 VUP New Construction 1x12x5.5

1 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Current status of Box Type Structure
Span Thickness/
Sr. No. Chainage Structure Type Type of Construction Span (GAD Skew Item Nos Length Width Quantity
(P&P) Height

11 113+357 1x12x5.5 VUP New Construction 1x12x5.5

12 114+516 2x4.5 Minor Bridge New Construction 2x3.95 Skew 8 PCC 1 28.485 9.124 0.150 38.985
114+516 2x4.5 Minor Bridge New Construction 2x3.95 Skew 8 Raft 1 28.283 8.924 0.450 113.579
114+516 2x4.5 Minor Bridge New Construction 2x3.95 Skew 8 Wall 2 28.283 0.400 3.714 84.034
114+516 2x4.5 Minor Bridge New Construction 2x3.95 Skew 8 Wall 1 28.283 0.300 3.714 31.513
114+516 2x4.5 Minor Bridge New Construction 2x3.95 Skew 8 Hunch 8 28.283 0.150 0.150 5.091
114+516 2x4.5 Minor Bridge New Construction 2x3.95 Skew 8 Slab 1 28.283 8.924 0.375 94.649
114+516 2x4.5 Minor Bridge New Construction 2x3.95 Skew 8 Approch Slab PCC 2 3.600 9.124 0.100 6.569
114+516 2x4.5 Minor Bridge New Construction 2x3.95 Skew 8 Approch Slab 2 3.500 8.924 0.300 18.740
Total Quanti 393.160

13 115+644 1x12x5.5 VUP New Construction 1x12x5.5


14 116+053 1x9.9 Minor Bridge Reconstruction 2x3.95 PCC 1 34.925 9.124 0.100 31.866
116+053 1x9.9 Minor Bridge Reconstruction 2x3.95 Raft 1 34.725 8.924 0.450 139.449
116+053 1x9.9 Minor Bridge Reconstruction 2x3.95 Wall 2 34.725 0.400 3.714 103.175
116+053 1x9.9 Minor Bridge Reconstruction 2x3.95 Wall 1 34.725 0.300 3.714 38.691
116+053 1x9.9 Minor Bridge Reconstruction 2x3.95 Hunch 8 34.725 0.150 0.150 6.251
116+053 1x9.9 Minor Bridge Reconstruction 2x3.95 Slab 1 34.725 8.924 0.375 116.207
116+053 1x9.9 Minor Bridge Reconstruction 2x3.95 Approch Slab PCC 2 3.600 9.124 0.100 6.569
116+053 1x9.9 Minor Bridge Reconstruction 2x3.95 Approch Slab 2 3.500 8.924 0.300 18.740
Total Quanti 460.947

15 116+474 1x13.0 Minor Bridge Reconstruction 2x6 PCC 1 28.200 13.300 0.100 37.506
116+474 1x13.0 Minor Bridge Reconstruction 2x6 Raft 1 28.000 13.100 0.450 165.060
116+474 1x13.0 Minor Bridge Reconstruction 2x6 Wall 2 28.000 0.400 2.854 63.930
116+474 1x13.0 Minor Bridge Reconstruction 2x6 Wall 1 28.000 0.300 2.854 23.974
116+474 1x13.0 Minor Bridge Reconstruction 2x6 Hunch 8 28.000 0.150 0.150 5.040
116+474 1x13.0 Minor Bridge Reconstruction 2x6 Slab 1 28.000 13.100 0.375 137.550
116+474 1x13.0 Minor Bridge Reconstruction 2x6 Approch Slab PCC 2 3.600 13.300 0.100 9.576
116+474 1x13.0 Minor Bridge Reconstruction 2x6 Approch Slab 2 3.500 13.100 0.300 27.510
Total Quanti 470.145

16 116+843 1x8.7 Minor Bridge Reconstruction 1x8 PCC 1 28.200 9.100 0.100 25.662
116+843 1x8.7 Minor Bridge Reconstruction 1x8 Raft 1 28.000 8.900 0.550 137.060
116+843 1x8.7 Minor Bridge Reconstruction 1x8 Wall 2 28.000 0.450 1.713 43.168
116+843 1x8.7 Minor Bridge Reconstruction 1x8 Wall 0 0.000 0.000 0.000 0.000
116+843 1x8.7 Minor Bridge Reconstruction 1x8 Hunch 4 28.000 0.150 0.150 2.520
116+843 1x8.7 Minor Bridge Reconstruction 1x8 Slab 1 28.000 8.900 0.500 124.600
116+843 1x8.7 Minor Bridge Reconstruction 1x8 Approch Slab PCC 2 3.600 9.100 0.100 6.552
116+843 1x8.7 Minor Bridge Reconstruction 1x8 Approch Slab 2 3.500 8.900 0.300 18.690
Total Quanti 358.252

17 117+438 2x5.5 Minor Bridge New Construction 2x5.5 PCC 1 43.277 12.300 0.100 53.230
117+438 2x5.5 Minor Bridge New Construction 2x5.5 Raft 1 43.077 12.100 0.450 234.552
117+438 2x5.5 Minor Bridge New Construction 2x5.5 Wall 2 43.077 0.400 2.203 75.918
117+438 2x5.5 Minor Bridge New Construction 2x5.5 Wall 1 43.077 0.300 2.203 28.469
117+438 2x5.5 Minor Bridge New Construction 2x5.5 Hunch 8 43.077 0.150 0.150 7.754
117+438 2x5.5 Minor Bridge New Construction 2x5.5 Slab 1 43.077 12.100 0.500 260.613
117+438 2x5.5 Minor Bridge New Construction 2x5.5 Approch Slab PCC 2 3.600 12.300 0.100 8.856
117+438 2x5.5 Minor Bridge New Construction 2x5.5 Approch Slab 2 3.500 12.100 0.300 25.410
Total Quanti 694.802

18 117+700 1x7x3.5 CUP New Construction 1x7.0x4.50


19 117+891 4x3.0 Minor Bridge New Construction MCW 2x6 PCC 1 54.800 13.300 0.100 72.884
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Raft 1 54.600 13.100 0.450 321.867
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Wall MCW 2 28.500 0.400 3.998 91.154
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Wall MCW 1 28.500 0.300 3.998 34.183
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Wall SR 2 26.100 0.400 2.340 48.859
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Wall SR 1 26.100 0.300 2.340 18.322
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Hunch 16 54.600 0.150 0.150 19.656
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Slab 1 54.600 13.100 0.500 357.630
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Approch Slab PCC 2 3.600 13.300 0.100 9.576
117+891 4x3.0 Minor Bridge New Construction MCW 2x6 Approch Slab 2 3.500 13.100 0.300 27.510
Total Quanti 1001.642

20 118+378 2x14.2 Minor Bridge Reconstruction 4x7.1 PCC 1 28.200 30.150 0.100 85.023
118+378 2x14.2 Minor Bridge Reconstruction 4x7.1 Raft 1 28.000 29.950 0.525 440.265
118+378 2x14.2 Minor Bridge Reconstruction 4x7.1 Wall 2 28.000 0.400 3.974 89.018
118+378 2x14.2 Minor Bridge Reconstruction 4x7.1 Wall 3 28.000 0.250 3.974 83.454
118+378 2x14.2 Minor Bridge Reconstruction 4x7.1 Hunch 16 28.000 0.150 0.150 10.080
2 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Current status of Box Type Structure
Span Thickness/
Sr. No. Chainage Structure Type Type of Construction Span (GAD Skew Item Nos Length Width Quantity
(P&P) Height
118+378 2x14.2 Minor Bridge Reconstruction 4x7.1 Slab 1 28.000 29.950 0.500 419.300
118+378 2x14.2 Minor Bridge Reconstruction 4x7.1 Approch Slab PCC 2 3.600 30.150 0.100 21.708
118+378 2x14.2 Minor Bridge Reconstruction 4x7.1 Approch Slab 2 3.500 29.950 0.300 62.895
Total Quanti 1211.743

21 119+322 1x16.5 Minor Bridge Reconstruction 3x5.2 PCC 1 25.400 17.200 0.100 43.688
119+322 1x16.5 Minor Bridge Reconstruction 3x5.2 Raft 1 25.000 17.000 0.525 223.125
119+322 1x16.5 Minor Bridge Reconstruction 3x5.2 Wall 2 25.000 0.400 3.765 75.300
119+322 1x16.5 Minor Bridge Reconstruction 3x5.2 Wall 2 25.000 0.300 3.765 56.475
119+322 1x16.5 Minor Bridge Reconstruction 3x5.2 Hunch 12 25.000 0.150 0.150 6.750
119+322 1x16.5 Minor Bridge Reconstruction 3x5.2 Slab 1 25.000 17.000 0.500 212.500
119+322 1x16.5 Minor Bridge Reconstruction 3x5.2 Approch Slab PCC 2 3.600 17.200 0.100 12.384
119+322 1x16.5 Minor Bridge Reconstruction 3x5.2 Approch Slab 2 3.500 17.000 0.300 35.700
Total Quanti 665.922

22 119+721 1x8.1 Minor Bridge Reconstruction 1x7.4 PCC 1 25.200 8.400 0.100 21.168
119+721 1x8.1 Minor Bridge Reconstruction 1x7.4 Raft 1 24.800 8.200 0.500 101.680
119+721 1x8.1 Minor Bridge Reconstruction 1x7.4 Wall 2 24.800 0.400 2.016 39.997
119+721 1x8.1 Minor Bridge Reconstruction 1x7.4 Wall 0 24.800 0.300 2.016 0.000
119+721 1x8.1 Minor Bridge Reconstruction 1x7.4 Hunch 4 24.800 0.150 0.150 2.232
119+721 1x8.1 Minor Bridge Reconstruction 1x7.4 Slab 1 24.800 8.200 0.450 91.512
119+721 1x8.1 Minor Bridge Reconstruction 1x7.4 Approch Slab PCC 2 3.600 8.400 0.100 6.048
119+721 1x8.1 Minor Bridge Reconstruction 1x7.4 Approch Slab 2 3.500 8.200 0.300 17.220
Total Quanti 279.857

23 120+977 1x4.4 Box Culvert Reconstruction

24 121+051 1x8.4 Minor Bridge Reconstruction 1x8.3 Skew 13.24 PCC 1 28.982 8.279 0.100 23.994
121+051 1x8.4 Minor Bridge Reconstruction 1x8.3 Skew 13.24 Raft 1 28.776 8.079 0.550 127.865
121+051 1x8.4 Minor Bridge Reconstruction 1x8.3 Skew 13.24 Wall 2 28.776 0.450 3.667 94.969
121+051 1x8.4 Minor Bridge Reconstruction 1x8.3 Skew 13.24 Wall 0 28.776 0.300 3.667 0.000
121+051 1x8.4 Minor Bridge Reconstruction 1x8.3 Skew 13.24 Hunch 4 28.776 0.150 0.150 2.590
121+051 1x8.4 Minor Bridge Reconstruction 1x8.3 Skew 13.24 Slab 1 28.776 8.079 0.500 116.241
121+051 1x8.4 Minor Bridge Reconstruction 1x8.3 Skew 13.24 Approch Slab PCC 2 3.600 8.279 0.100 5.961
121+051 1x8.4 Minor Bridge Reconstruction 1x8.3 Skew 13.24 Approch Slab 2 3.500 8.079 0.300 16.966
Total Quanti 388.586

25 121+461 3x3.0 Minor Bridge Reconstruction 3x3.0 PCC 1 17.955 10.400 0.100 18.673
121+461 3x3.0 Minor Bridge Reconstruction 3x3.0 Raft 1 17.755 10.200 0.325 58.858
121+461 3x3.0 Minor Bridge Reconstruction 3x3.0 Wall 4 17.755 0.300 1.306 27.826
121+461 3x3.0 Minor Bridge Reconstruction 3x3.0 Wall 0 17.755 0.300 1.306 0.000
121+461 3x3.0 Minor Bridge Reconstruction 3x3.0 Hunch 12 17.755 0.150 0.150 4.794
121+461 3x3.0 Minor Bridge Reconstruction 3x3.0 Slab 1 17.755 10.200 0.300 54.330
121+461 3x3.0 Minor Bridge Reconstruction 3x3.0 Approch Slab PCC 2 3.600 10.400 0.100 7.488
121+461 3x3.0 Minor Bridge Reconstruction 3x3.0 Approch Slab 2 3.500 10.200 0.300 21.420
Total Quanti 193.389

26 122+241 2x13.5 Minor Bridge Reconstruction 4x6.6 PCC 1 28.146 25.928 0.100 72.977
122+241 2x13.5 Minor Bridge Reconstruction 4x6.6 Raft 1 27.925 25.728 0.500 359.227
122+241 2x13.5 Minor Bridge Reconstruction 4x6.6 Wall 2 27.925 0.450 3.502 88.014
122+241 2x13.5 Minor Bridge Reconstruction 4x6.6 Wall 3 27.925 0.300 3.502 88.014
122+241 2x13.5 Minor Bridge Reconstruction 4x6.6 Hunch 16 27.925 0.150 0.150 10.053
122+241 2x13.5 Minor Bridge Reconstruction 4x6.6 Slab 1 27.925 25.728 0.450 323.304
122+241 2x13.5 Minor Bridge Reconstruction 4x6.6 Approch Slab PCC 2 3.600 25.928 0.100 18.668
122+241 2x13.5 Minor Bridge Reconstruction 4x6.6 Approch Slab 2 3.500 25.728 0.300 54.029
Total Quanti 1014.287
27 122+700 1x12x5.5 VUP New Construction 1x12x5.5
28 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 PCC 1 51.650 13.300 0.100 68.695
29 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Raft MCW 1 28.500 13.100 0.850 317.348
30 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Raft SR 1 22.950 13.100 0.550 165.355
31 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Wall MCW 2 28.500 0.800 4.600 209.760
32 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Wall MCW 0 0.000 0.000 0.000 0.000
33 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Wall SR 2 22.950 0.450 2.153 44.470
34 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Wall SR 0 0.000 0.000 0.000 0.000
35 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Hunch 8 28.500 0.150 0.150 5.130
36 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Slab MCW 1 28.500 13.100 0.800 298.680
37 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Slab 1 22.950 13.100 0.500 150.323
38 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Approch Slab PCC 2 3.600 13.300 0.100 9.576
39 122+793 1x8.3 Minor Bridge Reconstruction 1x8.3 Approch Slab 2 3.500 13.100 0.300 27.510
Total Quanti 1296.845

29 123+238 2x5.65 Minor Bridge New Construction

3 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Current status of Box Type Structure
Span Thickness/
Sr. No. Chainage Structure Type Type of Construction Span (GAD Skew Item Nos Length Width Quantity
(P&P) Height

30 123+292 1x1.2 Pipe Culvert Reconstruction


31 123+672 1x18.2 Minor Bridge New Construction 3x5.6 PCC 1 12.600 18.300 0.100 23.058
123+672 1x18.2 Minor Bridge New Construction 3x5.6 Raft 1 12.500 18.100 0.450 101.813
123+672 1x18.2 Minor Bridge New Construction 3x5.6 Wall 2 12.500 4.000 3.087 308.700
123+672 1x18.2 Minor Bridge New Construction 3x5.6 Wall 2 12.500 0.250 3.087 19.294
123+672 1x18.2 Minor Bridge New Construction 3x5.6 Hunch 12 12.500 0.150 0.150 3.375
123+672 1x18.2 Minor Bridge New Construction 3x5.6 Slab 1 12.500 18.100 0.400 90.500
123+672 1x18.2 Minor Bridge New Construction 3x5.6 Approch Slab PCC 2 3.600 18.300 0.100 13.176
123+672 1x18.2 Minor Bridge New Construction 3x5.6 Approch Slab 2 3.500 18.100 0.300 38.010
Total Quanti 597.925

32 124+015 5x8.2 Minor Bridge New Construction 5x7.78 PCC 1 20.444 39.661 0.100 81.083
124+015 5x8.2 Minor Bridge New Construction 5x7.78 Raft 1 20.233 39.461 0.750 598.811
124+015 5x8.2 Minor Bridge New Construction 5x7.78 Wall 2 20.233 0.528 3.375 72.110
124+015 5x8.2 Minor Bridge New Construction 5x7.78 Wall 4 20.233 0.400 3.375 109.258
124+015 5x8.2 Minor Bridge New Construction 5x7.78 Hunch 20 20.233 0.150 0.150 9.105
124+015 5x8.2 Minor Bridge New Construction 5x7.78 Slab 1 20.233 39.461 0.700 558.890
124+015 5x8.2 Minor Bridge New Construction 5x7.78 Approch Slab PCC 2 3.600 39.661 0.100 28.556
124+015 5x8.2 Minor Bridge New Construction 5x7.78 Approch Slab 2 3.500 39.461 0.300 82.868
Total Quanti 1540.681

33 124+189 1x4.0 Slab Culvert Reconstruction


34 124+391 4x9.4 Minor Bridge New Construction 5x8.96 PCC 1 20.024 47.200 0.100 94.513
124+391 4x9.4 Minor Bridge New Construction 5x8.96 Raft 1 19.824 47.000 0.600 559.037
124+391 4x9.4 Minor Bridge New Construction 5x8.96 Wall 2 19.824 0.500 2.661 52.752
124+391 4x9.4 Minor Bridge New Construction 5x8.96 Wall 4 19.824 0.300 2.661 63.302
124+391 4x9.4 Minor Bridge New Construction 5x8.96 Hunch 20 19.824 0.150 0.150 8.921
124+391 4x9.4 Minor Bridge New Construction 5x8.96 Slab 1 19.824 47.000 0.550 512.450
124+391 4x9.4 Minor Bridge New Construction 5x8.96 Approch Slab PCC 2 3.600 47.200 0.100 33.984
124+391 4x9.4 Minor Bridge New Construction 5x8.96 Approch Slab 2 3.500 47.000 0.300 98.700
Total Quanti 1423.659

35 125+791 1x10.2 Minor Bridge Reconstruction 2x4.6 PCC 1 28.200 10.400 0.100 29.328
125+791 1x10.2 Minor Bridge Reconstruction 2x4.6 Raft 1 28.000 10.200 0.450 128.520
125+791 1x10.2 Minor Bridge Reconstruction 2x4.6 Wall 2 28.000 0.375 2.838 59.598
125+791 1x10.2 Minor Bridge Reconstruction 2x4.6 Wall 1 28.000 0.250 2.838 19.866
125+791 1x10.2 Minor Bridge Reconstruction 2x4.6 Hunch 8 28.000 0.150 0.150 5.040
125+791 1x10.2 Minor Bridge Reconstruction 2x4.6 Slab 1 28.000 10.200 0.400 114.240
125+791 1x10.2 Minor Bridge Reconstruction 2x4.6 Approch Slab PCC 2 3.600 10.400 0.100 7.488
125+791 1x10.2 Minor Bridge Reconstruction 2x4.6 Approch Slab 2 3.500 10.200 0.300 21.420
Total Quanti 385.500

36 125+868 1x3.0 Box Culvert Reconstruction


37 125+955 1x3.0 Box Culvert Reconstruction
38 125+988 1x4.1 Box Culvert Reconstruction
39 126+342 1x1.2 Pipe Culvert Reconstruction
40 126+655 1x10 Minor Bridge Reconstruction 2x4.5 Skew 16.95 PCC 1 26.569 9.858 0.100 26.192
126+655 1x10 Minor Bridge Reconstruction 2x4.5 Skew 16.95 Raft 1 26.151 9.658 0.450 113.655
126+655 1x10 Minor Bridge Reconstruction 2x4.5 Skew 16.95 Wall 2 26.151 0.400 3.064 64.101
126+655 1x10 Minor Bridge Reconstruction 2x4.5 Skew 16.95 Wall 1 26.151 0.250 3.064 20.032
126+655 1x10 Minor Bridge Reconstruction 2x4.5 Skew 16.95 Hunch 8 26.151 0.150 0.150 4.707
126+655 1x10 Minor Bridge Reconstruction 2x4.5 Skew 16.95 Slab 1 26.151 9.658 0.400 101.027
126+655 1x10 Minor Bridge Reconstruction 2x4.5 Skew 16.95 Approch Slab PCC 2 3.600 9.858 0.100 7.098
126+655 1x10 Minor Bridge Reconstruction 2x4.5 Skew 16.95 Approch Slab 2 3.500 9.658 0.300 20.282
Total Quanti 357.093

41 127+016 2x11.8 Minor Bridge Reconstruction 4x5.575 PCC 1 25.400 24.200 0.100 61.468
127+016 2x11.8 Minor Bridge Reconstruction 4x5.575 Raft 1 25.000 24.000 0.525 315.000
127+016 2x11.8 Minor Bridge Reconstruction 4x5.575 Wall 2 25.000 0.400 3.750 75.000
127+016 2x11.8 Minor Bridge Reconstruction 4x5.575 Wall 3 25.000 0.300 3.750 84.375
127+016 2x11.8 Minor Bridge Reconstruction 4x5.575 Hunch 16 25.000 0.150 0.150 9.000
127+016 2x11.8 Minor Bridge Reconstruction 4x5.575 Slab 1 25.000 24.000 0.500 300.000
127+016 2x11.8 Minor Bridge Reconstruction 4x5.575 Approch Slab PCC 2 3.600 24.200 0.100 17.424
127+016 2x11.8 Minor Bridge Reconstruction 4x5.575 Approch Slab 2 3.500 24.000 0.300 50.400
Total Quanti 912.667

42 127+219 1x18.6 Minor Bridge Reconstruction 3x5.8 PCC 1 25.400 19.100 0.100 48.514
127+219 1x18.6 Minor Bridge Reconstruction 3x5.8 Raft 1 25.000 18.900 0.500 236.250
127+219 1x18.6 Minor Bridge Reconstruction 3x5.8 Wall 2 25.000 0.450 4.575 102.938
4 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Current status of Box Type Structure
Span Thickness/
Sr. No. Chainage Structure Type Type of Construction Span (GAD Skew Item Nos Length Width Quantity
(P&P) Height
127+219 1x18.6 Minor Bridge Reconstruction 3x5.8 Wall 2 25.000 0.300 4.575 68.625
127+219 1x18.6 Minor Bridge Reconstruction 3x5.8 Hunch 16 25.000 0.150 0.150 9.000
127+219 1x18.6 Minor Bridge Reconstruction 3x5.8 Slab 1 25.000 18.900 0.400 189.000
127+219 1x18.6 Minor Bridge Reconstruction 3x5.8 Approch Slab PCC 2 3.600 19.100 0.100 13.752
127+219 1x18.6 Minor Bridge Reconstruction 3x5.8 Approch Slab 2 3.500 18.900 0.300 39.690
Total Quanti 707.769

43 127+995 2x15.0 Flyover New Construction 2x15.0x5.5 PCC 1 28.700 12.200 0.100 35.014
Raft 1 28.500 12.000 0.875 299.250
Wall 2 28.500 0.750 5.685 243.034
Hunch 4 28.500 0.150 0.150 2.565
Slab 1 28.500 9.500 0.750 203.063
Approch Slab PCC 2 3.600 12.200 0.100 8.784
Approch Slab 2 3.500 12.000 0.300 25.200

44 129+238 1x22.5 Minor Bridge Reconstruction 3x7.1 PCC 1 28.200 23.300 0.100 65.706
129+238 1x22.5 Minor Bridge Reconstruction 3x7.1 Raft 1 28.000 23.100 0.700 452.760
129+238 1x22.5 Minor Bridge Reconstruction 3x7.1 Wall 2 28.000 0.500 3.915 109.620
129+238 1x22.5 Minor Bridge Reconstruction 3x7.1 Wall 2 28.000 0.400 3.915 87.696
129+238 1x22.5 Minor Bridge Reconstruction 3x7.1 Hunch 12 28.000 0.150 0.150 7.560
129+238 1x22.5 Minor Bridge Reconstruction 3x7.1 Slab 1 28.000 23.100 0.650 420.420
129+238 1x22.5 Minor Bridge Reconstruction 3x7.1 Approch Slab PCC 2 3.600 23.300 0.100 16.776
129+238 1x22.5 Minor Bridge Reconstruction 3x7.1 Approch Slab 2 3.500 23.100 0.300 48.510
Total Quanti 1209.048

45 129+410 1x3.0 Box Culvert Reconstruction

46 129+943 2x3.4 Minor Bridge New Construction 1x6.0 PCC 1 14.040 7.100 0.100 9.968
129+943 2x3.4 Minor Bridge New Construction 1x6.0 Raft 1 13.940 6.900 0.450 43.284
129+943 2x3.4 Minor Bridge New Construction 1x6.0 Wall 2 13.940 0.450 2.750 34.502
129+943 2x3.4 Minor Bridge New Construction 1x6.0 Wall 0 0.000 0.000 0.000 0.000
129+943 2x3.4 Minor Bridge New Construction 1x6.0 Hunch 4 13.940 0.150 0.150 1.255
129+943 2x3.4 Minor Bridge New Construction 1x6.0 Slab 1 13.940 6.900 0.425 40.879
129+943 2x3.4 Minor Bridge New Construction 1x6.0 Approch Slab PCC 2 3.600 7.100 0.100 5.112
129+943 2x3.4 Minor Bridge New Construction 1x6.0 Approch Slab 2 3.500 6.900 0.300 14.490
Total Quanti 149.489

47 131+660 1x9x5.5 VUP New Construction 1x9.0x5.5


48 131+741 1x9x5.5 VUP New Construction 1x9.0x5.5
49 132+726 1x3.0 Box Culvert Reconstruction
50 132+870 1x3.0 Box Culvert Reconstruction
51 133+595 1x12x5.5 VUP New Construction 1x12x5.5

52 134+061 5x3.5 Minor Bridge New Construction 5x3.25 PCC 1 28.200 17.950 0.100 50.619
134+061 5x3.5 Minor Bridge New Construction 5x3.25 Raft 1 28.000 17.750 0.250 124.250
134+061 5x3.5 Minor Bridge New Construction 5x3.25 Wall 6 28.000 0.250 2.940 123.480
134+061 5x3.5 Minor Bridge New Construction 5x3.25 Wall 0 0.000 0.000 0.000 0.000
134+061 5x3.5 Minor Bridge New Construction 5x3.25 Hunch 20 28.000 0.150 0.150 12.600
134+061 5x3.5 Minor Bridge New Construction 5x3.25 Slab 1 28.000 17.750 0.250 124.250
134+061 5x3.5 Minor Bridge New Construction 5x3.25 Approch Slab PCC 2 3.600 17.950 0.100 12.924
134+061 5x3.5 Minor Bridge New Construction 5x3.25 Approch Slab 2 3.500 17.750 0.300 37.275
Total Quanti 485.398

53 134+875 1x12x5.5 VUP New Construction 1x12x5.5


54 135+084 1x1.5 Slab Culvert Reconstruction
55 136+127 1x6.0 Box Culvert Reconstruction
56 136+389 1x6.0 Box Culvert Reconstruction
57 136+400 1x2.3 Box Culvert Reconstruction
58 136+623 1x2.3 Box Culvert Reconstruction
59 136+735 1x6.0 Box Culvert Reconstruction
60 137+794 1x2.3 Box Culvert Reconstruction
61 138+089 1x2.5 Slab Culvert Reconstruction
62 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 PCC 1 28.700 32.200 0.100 92.414
Raft 1 28.500 32.000 0.800 729.600
Wall 2 28.500 0.700 6.265 249.974
Wall 1 28.500 0.600 6.265 107.132
Hunch 8 28.500 0.150 0.150 5.130
Slab 1 28.500 29.500 0.700 588.525
Approch Slab PCC 2 3.600 32.200 0.100 23.184
Approch Slab 2 3.500 32.000 0.300 67.200

63 138+580 2x4.5 Minor Bridge New Construction 2x4.5 PCC 1 28.200 14.400 0.100 40.608
138+580 2x4.5 Minor Bridge New Construction 2x4.5 Raft 1 28.000 14.200 0.500 198.800
5 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Current status of Box Type Structure
Span Thickness/
Sr. No. Chainage Structure Type Type of Construction Span (GAD Skew Item Nos Length Width Quantity
(P&P) Height
138+580 2x4.5 Minor Bridge New Construction 2x4.5 Wall 2 28.000 0.450 4.500 113.400
138+580 2x4.5 Minor Bridge New Construction 2x4.5 Wall 1 28.000 0.300 4.500 37.800
138+580 2x4.5 Minor Bridge New Construction 2x4.5 Hunch 8 28.000 0.150 0.150 5.040
138+580 2x4.5 Minor Bridge New Construction 2x4.5 Slab 1 28.000 14.200 0.450 178.920
138+580 2x4.5 Minor Bridge New Construction 2x4.5 Approch Slab PCC 2 3.600 14.400 0.100 10.368
138+580 2x4.5 Minor Bridge New Construction 2x4.5 Approch Slab 2 3.500 14.200 0.300 29.820
Total Quanti 614.756

6 of 32
Balance
Remark
Quantity

15.624 RHS Complite


61.000 RHS Complite
16.088 RHS Complite
13.406 RHS Complite
3.375 RHS Complite
57.188 RHS Complite
8.928
25.620

18.213 LHS Complite


71.187 LHS Complite
18.774 LHS Complite
15.645 LHS Complite
3.939 LHS Complite
66.738 LHS Complite
8.928
25.620

17.661 RHS Complite


77.620 RHS Complite
34.572 RHS Complite
10.804 RHS Complite
2.577 RHS Complite
68.996 RHS Complite
8.820
25.305

BHS Complite
BHS Complite
BHS Complite
BHS Complite
BHS Complite
BHS Complite
16.812
48.615

7 of 32
Balance
Remark
Quantity

BHS Complite
BHS Complite
BHS Complite
BHS Complite
BHS Complite
BHS Complite
6.569
18.740

15.933 RHS Complite


69.724 RHS Complite
51.587 RHS Complite
19.345 RHS Complite
3.125 RHS Complite
58.104 RHS Complite
6.569
18.740

18.753 RHS Complite


82.530 RHS Complite
31.965 RHS Complite
11.987 RHS Complite
2.520 RHS Complite
68.775 RHS Complite
9.576
27.510

12.831 RHS Complite


68.530 RHS Complite
21.584 RHS Complite
0.000 RHS Complite
1.260 RHS Complite
62.300 RHS Complite
6.552
18.690

26.615 RHS Complite


117.276 RHS Complite
37.959 RHS Complite
14.235 RHS Complite
3.877 RHS Complite
130.306 RHS Complite
8.856
25.410

37.905 SR Str. Compilte


168.008 SR Str. Compilte
91.154 SR Str. Compilte
34.183 SR Str. Compilte
SR Str. Compilte
SR Str. Compilte
10.260 SR Str. Compilte
186.675 SR Str. Compilte
9.576
27.510

42.512 RHS Complite


220.133 RHS Complite
44.509 RHS Complite
41.727 RHS Complite
5.040 RHS Complite
8 of 32
Balance
Remark
Quantity
209.650 RHS Complite
21.708
62.895

21.844 RHS Complite


111.563 RHS Complite
37.650 RHS Complite
28.238 RHS Complite
3.375 RHS Complite
106.250 RHS Complite
12.384
35.700

10.584 RHS Complite


50.840 RHS Complite
19.999 RHS Complite
0.000 RHS Complite
1.116 RHS Complite
45.756 RHS Complite
6.048
17.220

23.994
127.865
94.969
0.000
2.590
116.241
5.961
16.966

9.337 RHS Complite


29.429 RHS Complite
13.913 RHS Complite
0.000 RHS Complite
2.397 RHS Complite
27.165 RHS Complite
7.488
21.420

72.977
359.227
88.014
88.014
10.053
323.304
18.668
54.029

68.695
317.348
165.355
209.760
0.000
44.470
0.000
5.130
298.680
150.323
9.576
27.510

9 of 32
Balance
Remark
Quantity

11.529 RHS Compilte


50.906 RHS Compilte
154.350 RHS Compilte
9.647 RHS Compilte
1.688 RHS Compilte
45.250 RHS Compilte
13.176
38.010

40.541 RHS Compilte


299.405 RHS Compilte
36.055 RHS Compilte
54.629 RHS Compilte
4.552 RHS Compilte
279.445 RHS Compilte
28.556
82.868

47.257 RHS Compilte


279.518 RHS Compilte
26.376 RHS Compilte
31.651 RHS Compilte
4.460 RHS Compilte
256.225 RHS Compilte
33.984
98.700

14.664 LHS Raft Compilte


64.260 LHS Raft Compilte
59.598
19.866
5.040
114.240
7.488
21.420

26.192
113.655
64.101
20.032
4.707
101.027
7.098
20.282

61.468
315.000
75.000
84.375
9.000
300.000
17.424
50.400

48.514
236.250
102.938
10 of 32
Balance
Remark
Quantity
68.625
9.000
189.000
13.752
39.690

32.853 RHS PCC Complite


452.760
109.620
87.696
7.560
420.420
16.776
48.510

9.968
43.284
34.502
0.000
1.255
40.879
5.112
14.490

50.619
124.250
123.480
0.000
12.600
124.250
12.924
37.275

40.608
198.800
11 of 32
Balance
Remark
Quantity
113.400
37.800
5.040
178.920
10.368
29.820

12 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF GUJRAT

Fly Over
Span Structure Thickness/ Balance
Sr. No. Chainage Type of Construction Span (GAD Skew Item Nos Length Width Quantity Remark
(P&P) Type Height Quantity
1 127+995 2x15.0 Flyover New Construction 2x15.0x5.5 PCC 1 28.700 12.200 0.100 35.014 BHS Wall Complite
2 127+995 2x15.0 Flyover New Construction 2x15.0x5.5 Raft 1 28.500 12.000 0.875 299.250 BHS Wall Complite
3 127+995 2x15.0 Flyover New Construction 2x15.0x5.5 Wall 2 28.500 0.750 5.685 243.034 BHS Wall Complite
4 127+995 2x15.0 Flyover New Construction 2x15.0x5.5 Hunch 4 28.500 0.150 0.150 2.565 1.283
5 127+995 2x15.0 Flyover New Construction 2x15.0x5.5 Slab 1 28.500 9.500 0.750 203.063 203.063
6 127+995 2x15.0 Flyover New Construction 2x15.0x5.5 Approch Slab PCC 2 3.600 12.200 0.100 8.784 8.784
7 127+995 2x15.0 Flyover New Construction 2x15.0x5.5 Approch Slab 2 3.500 12.000 0.300 25.200 25.200
Total Quantity 816.909
1 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 PCC 1 28.700 32.200 0.100 92.414 BHS Wall Complite
2 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 Raft 1 28.500 32.000 0.800 729.600 BHS Wall Complite
3 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 Wall 2 28.500 0.700 6.265 249.974 BHS Wall Complite
4 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 Wall 1 28.500 0.600 6.265 107.132 BHS Wall Complite
5 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 Hunch 8 28.500 0.150 0.150 5.130 2.565
6 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 Slab 1 28.500 29.500 0.700 588.525 588.525
7 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 Approch Slab PCC 2 3.600 32.200 0.100 23.184 23.184
8 138+124 2x15.0 Flyover Reconstruction 2x15.0x5.5 Approch Slab 2 3.500 32.000 0.300 67.200 67.200
Total Quantity 1863.158

13 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF GUJRAT

VUP
Span Structure Thickness/ Balance
Sr. No. Chainage (P&P) Type Type of Construction Span (GAD Skew Item Nos Length Width Height Quantity Quantity Remark
1 112+260 1x12.5x5.5 VUP New Construction 1x12x5.5 PCC 1 29.700 13.400 0.100 39.798 19.899 RHS Complite
2 112+260 1x12.5x5.5 VUP New Construction 1x12x5.5 Raft 1 29.500 13.200 0.650 253.110 126.555 RHS Complite
3 112+260 1x12.5x5.5 VUP New Construction 1x12x5.5 Wall 2 29.500 0.600 5.683 201.178 100.5891 RHS Complite
4 112+260 1x12.5x5.5 VUP New Construction 1x12x5.5 Hunch 4 29.500 0.150 0.150 2.655 1.3275 RHS Complite
5 112+260 1x12.5x5.5 VUP New Construction 1x12x5.5 Slab 1 29.500 13.200 0.600 233.640 116.82 RHS Complite
6 112+260 1x12.5x5.5 VUP New Construction 1x12x5.5 Approch Slab PCC 2 3.600 13.400 0.100 9.648 9.648
7 112+260 1x12.5x5.5 VUP New Construction 1x12x5.5 Approch Slab 2 3.500 13.200 0.300 27.720 27.720
Total Quantity 402.559
8 113+357 1x12x5.5 VUP New Construction 1x12x5.5 PCC 1 12.700 13.400 0.100 17.018 17.018
9 113+357 1x12x5.5 VUP New Construction 1x12x5.5 Raft 1 12.500 13.200 0.650 107.250 107.250
10 113+357 1x12x5.5 VUP New Construction 1x12x5.5 Wall 2 12.500 0.600 5.683 85.245 85.245
11 113+357 1x12x5.5 VUP New Construction 1x12x5.5 Hunch 4 12.500 0.150 0.150 1.125 1.125
12 113+357 1x12x5.5 VUP New Construction 1x12x5.5 Slab 1 12.500 13.200 0.600 99.000 99.000
13 113+357 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab PCC 2 3.600 13.400 0.100 9.648 9.648
14 113+357 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab 2 3.500 13.200 0.300 27.720 27.720
Total Quantity 347.006
15 115+644 1x12x5.5 VUP New Construction 1x12x5.5 PCC 1 12.700 13.400 0.100 17.018 17.018
16 115+644 1x12x5.5 VUP New Construction 1x12x5.5 Raft 1 12.500 13.200 0.650 107.250 107.250
17 115+644 1x12x5.5 VUP New Construction 1x12x5.5 Wall 2 12.500 0.600 5.683 85.245 85.245
18 115+644 1x12x5.5 VUP New Construction 1x12x5.5 Hunch 4 12.500 0.150 0.150 1.125 1.125
19 115+644 1x12x5.5 VUP New Construction 1x12x5.5 Slab 1 12.500 13.200 0.600 99.000 99.000
20 115+644 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab PCC 2 3.600 13.400 0.100 9.648 9.648
21 115+644 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab 2 3.500 13.200 0.300 27.720 27.720
Total Quantity 347.006
22 122+700 1x12x5.5 VUP New Construction 1x12x5.5 PCC 1 29.700 13.400 0.100 39.798 39.798
23 122+700 1x12x5.5 VUP New Construction 1x12x5.5 Raft 1 29.500 13.200 0.650 253.110 253.110
24 122+700 1x12x5.5 VUP New Construction 1x12x5.5 Wall 2 29.500 0.600 5.683 201.178 201.178
25 122+700 1x12x5.5 VUP New Construction 1x12x5.5 Hunch 4 29.500 0.150 0.150 2.655 2.655
26 122+700 1x12x5.5 VUP New Construction 1x12x5.5 Slab 1 29.500 13.200 0.600 233.640 233.640
27 122+700 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab PCC 2 3.600 13.400 0.100 9.648 9.648
28 122+700 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab 2 3.500 13.200 0.300 27.720 27.720
Total Quantity 767.749
29 131+660 1x9x5.5 VUP New Construction 1x9.0x5.5 PCC 1 30.180 13.400 0.100 40.441 40.441
30 131+660 1x9x5.5 VUP New Construction 1x9.0x5.5 Raft 1 29.980 13.200 0.650 257.228 257.228
31 131+660 1x9x5.5 VUP New Construction 1x9.0x5.5 Wall 2 29.980 0.600 5.683 204.452 204.452
32 131+660 1x9x5.5 VUP New Construction 1x9.0x5.5 Hunch 4 29.980 0.150 0.150 2.698 2.698
33 131+660 1x9x5.5 VUP New Construction 1x9.0x5.5 Slab 1 29.980 13.200 0.600 237.442 237.442
34 131+660 1x9x5.5 VUP New Construction 1x9.0x5.5 Approch Slab PCC 2 3.600 13.400 0.100 9.648 9.648
35 131+660 1x9x5.5 VUP New Construction 1x9.0x5.5 Approch Slab 2 3.500 13.200 0.300 27.720 27.720
Total Quantity 779.629
36 131+741 1x9x5.5 VUP New Construction 1x9.0x5.5 PCC 1 30.180 13.400 0.100 40.441 40.441
14 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF GUJRAT

VUP
Span Structure Thickness/ Balance
Sr. No. Chainage (P&P) Type Type of Construction Span (GAD Skew Item Nos Length Width Height Quantity Quantity Remark
37 131+741 1x9x5.5 VUP New Construction 1x9.0x5.5 Raft 1 29.980 13.200 0.650 257.228 257.228
38 131+741 1x9x5.5 VUP New Construction 1x9.0x5.5 Wall 2 29.980 0.600 5.683 204.452 204.452
39 131+741 1x9x5.5 VUP New Construction 1x9.0x5.5 Hunch 4 29.980 0.150 0.150 2.698 2.698
40 131+741 1x9x5.5 VUP New Construction 1x9.0x5.5 Slab 1 29.980 13.200 0.600 237.442 237.442
41 131+741 1x9x5.5 VUP New Construction 1x9.0x5.5 Approch Slab PCC 2 3.600 13.400 0.100 9.648 9.648
42 131+741 1x9x5.5 VUP New Construction 1x9.0x5.5 Approch Slab 2 3.500 13.200 0.300 27.720 27.720
Total Quantity 779.629
43 133+595 1x12x5.5 VUP New Construction 1x12x5.5 PCC 1 28.700 13.400 0.100 38.458 38.458
44 133+595 1x12x5.5 VUP New Construction 1x12x5.5 Raft 1 28.500 13.200 0.650 244.530 244.530
45 133+595 1x12x5.5 VUP New Construction 1x12x5.5 Wall 2 28.500 0.600 5.683 194.359 194.359
46 133+595 1x12x5.5 VUP New Construction 1x12x5.5 Hunch 4 28.500 0.150 0.150 2.565 2.565
47 133+595 1x12x5.5 VUP New Construction 1x12x5.5 Slab 1 28.500 13.200 0.600 225.720 225.720
48 133+595 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab PCC 2 3.600 13.400 0.100 9.648 9.648
49 133+595 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab 2 3.500 13.200 0.300 27.720 27.720
Total Quantity 743.000
50 134+875 1x12x5.5 VUP New Construction 1x12x5.5 PCC 1 28.700 13.400 0.100 38.458 38.458
51 134+875 1x12x5.5 VUP New Construction 1x12x5.5 Raft 1 28.500 13.200 0.650 244.530 244.530
52 134+875 1x12x5.5 VUP New Construction 1x12x5.5 Wall 2 28.500 0.600 5.683 194.359 194.359
53 134+875 1x12x5.5 VUP New Construction 1x12x5.5 Hunch 4 28.500 0.150 0.150 2.565 2.565
54 134+875 1x12x5.5 VUP New Construction 1x12x5.5 Slab 1 28.500 13.200 0.600 225.720 225.720
55 134+875 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab PCC 2 3.600 13.400 0.100 9.648 9.648
56 134+875 1x12x5.5 VUP New Construction 1x12x5.5 Approch Slab 2 3.500 13.200 0.300 27.720 27.720
Total Quantity 743.000

15 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
PUP
Span Structure Thickness/ Balance
Sr. No. Chainage (P&P) Type Type of Construction Span (GAD Skew Item Nos Length Width Height Quantity Quantity Remark
1 108+710 1x7.5x4.5 CUP New Construction 1x7.0x4.50 PCC 1 28.700 8.000 0.100 22.960 11.48 LHS Complite
2 108+710 1x7.5x4.5 CUP New Construction 1x7.0x4.50 Raft 1 28.500 7.800 0.450 100.035 50.0175 LHS Complite
3 108+710 1x7.5x4.5 CUP New Construction 1x7.0x4.50 Wall 2 28.500 0.400 4.500 102.600 51.3 LHS Complite
4 108+710 1x7.5x4.5 CUP New Construction 1x7.0x4.50 Hunch 4 28.500 0.150 0.150 2.565 1.2825 LHS Complite
5 108+710 1x7.5x4.5 CUP New Construction 1x7.0x4.50 Slab 1 28.500 7.800 0.400 88.920 44.46 LHS Complite
6 108+710 1x7.5x4.5 CUP New Construction 1x7.0x4.50 Approch Slab PCC 2 3.600 8.000 0.100 5.760 5.760
7 108+710 1x7.5x4.5 CUP New Construction 1x7.0x4.50 Approch Slab 2 3.500 7.800 0.300 16.380 16.380
Total Quantity 180.680
8 117+700 1x7x3.5 CUP New Construction 1x7.0x4.50 PCC 1 28.700 8.000 0.100 22.960 11.48 RHS Complite
9 117+700 1x7x3.5 CUP New Construction 1x7.0x4.50 Raft 1 28.500 7.800 0.450 100.035 50.0175 RHS Complite
10 117+700 1x7x3.5 CUP New Construction 1x7.0x4.50 Wall 2 28.500 0.400 4.500 102.600 51.3 RHS Complite
11 117+700 1x7x3.5 CUP New Construction 1x7.0x4.50 Hunch 4 28.500 0.150 0.150 2.565 1.2825 RHS Complite
12 117+700 1x7x3.5 CUP New Construction 1x7.0x4.50 Slab 1 28.500 7.800 0.400 88.920 44.46 RHS Complite
13 117+700 1x7x3.5 CUP New Construction 1x7.0x4.50 Approch Slab PCC 2 3.600 8.000 0.100 5.760 5.760
14 117+700 1x7x3.5 CUP New Construction 1x7.0x4.50 Approch Slab 2 3.500 7.800 0.300 16.380 16.380
Total Quantity 180.680

16 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Minor Bridge
Span Structure Thickness/ Balance
Sr. No. Chainage Type of Construction Span (GAD Skew Item Nos Length Width Quantity Remark
(P&P) Type Height Quantity
1 100+450 3x3.7 Minor BridgNew Construction 3x3.7 6 PCC 1 30.411 7.000 0.100 21.288
2 100+450 3x3.7 Minor BridgNew Construction 3x3.7 6 Raft 1 30.203 6.800 0.450 92.421
3 100+450 3x3.7 Minor BridgNew Construction 3x3.7 6 Wall 2 30.203 0.300 2.150 38.962
4 100+450 3x3.7 Minor BridgNew Construction 3x3.7 6 Hunch 2 30.203 0.150 0.150 1.359
5 100+450 3x3.7 Minor BridgNew Construction 3x3.7 6 Slab 1 30.203 6.800 0.425 87.287
6 100+450 3x3.7 Minor BridgNew Construction 3x3.7 6 Approch Slab PCC 4 3.600 12.200 0.100 17.568
7 100+450 3x3.7 Minor BridgNew Construction 3x3.7 6 Approch Slab 4 3.500 12.200 0.300 51.240
Total Quantity 310.125
1 101+230 3x3.7 Minor BridgNew Construction 3x3.7 PCC 1 25.200 12.400 0.100 31.248 15.624 RHS Complite
2 101+230 3x3.7 Minor BridgNew Construction 3x3.7 Raft 1 25.000 12.200 0.400 122.000 61.000 RHS Complite
3 101+230 3x3.7 Minor BridgNew Construction 3x3.7 Wall 2 25.000 0.300 2.145 32.175 16.088 RHS Complite
4 101+230 3x3.7 Minor BridgNew Construction 3x3.7 Wall 2 25.000 0.250 2.145 26.813 13.406 RHS Complite
5 101+230 3x3.7 Minor BridgNew Construction 3x3.7 Hunch 12 25.000 0.150 0.150 6.750 3.375 RHS Complite
6 101+230 3x3.7 Minor BridgNew Construction 3x3.7 Slab 1 25.000 12.200 0.375 114.375 57.188 RHS Complite
7 101+230 3x3.7 Minor BridgNew Construction 3x3.7 Approch Slab PCC 2 3.600 12.400 0.100 8.928 8.928
8 101+230 3x3.7 Minor BridgNew Construction 3x3.7 Approch Slab 2 3.500 12.200 0.300 25.620 25.620
Total Quantity 367.909
1 102+507 1x6.2 Minor BridgReconstruction 1x6.2 Skew 6 PCC 1 29.376 12.400 0.100 36.426 18.213 LHS Complite
2 102+507 1x6.2 Minor BridgReconstruction 1x6.2 Skew 6 Raft 1 29.175 12.200 0.400 142.374 71.187 LHS Complite
3 102+507 1x6.2 Minor BridgReconstruction 1x6.2 Skew 6 Wall 2 29.175 0.300 2.145 37.548 18.774 LHS Complite
4 102+507 1x6.2 Minor BridgReconstruction 1x6.2 Skew 6 Wall 2 29.175 0.250 2.145 31.290 15.645 LHS Complite
5 102+507 1x6.2 Minor BridgReconstruction 1x6.2 Skew 6 Hunch 12 29.175 0.150 0.150 7.877 3.939 LHS Complite
6 102+507 1x6.2 Minor BridgReconstruction 1x6.2 Skew 6 Slab 1 29.175 12.200 0.375 133.476 66.738 LHS Complite
7 102+507 1x6.2 Minor BridgReconstruction 1x6.2 Skew 6 Approch Slab PCC 2 3.600 12.400 0.100 8.928 8.928
8 102+507 1x6.2 Minor BridgReconstruction 1x6.2 Skew 6 Approch Slab 2 3.500 12.200 0.300 25.620 25.620
Total Quantity 423.540
#REF! 107+623 1x11.0 Minor BridgReconstruction 2x5.5 Skew 12 PCC 1 28.834 12.250 0.100 35.322 17.661 RHS Complite
107+623 1x11.0 Minor BridgReconstruction 2x5.5 Skew 12 Raft 1 28.629 12.050 0.450 155.241 77.620 RHS Complite
107+623 1x11.0 Minor BridgReconstruction 2x5.5 Skew 12 Wall 2 28.629 0.400 3.019 69.145 34.572 RHS Complite
107+623 1x11.0 Minor BridgReconstruction 2x5.5 Skew 12 Wall 1 28.629 0.250 3.019 21.608 10.804 RHS Complite
107+623 1x11.0 Minor BridgReconstruction 2x5.5 Skew 12 Hunch 8 28.629 0.150 0.150 5.153 2.577 RHS Complite
107+623 1x11.0 Minor BridgReconstruction 2x5.5 Skew 12 Slab 1 28.629 12.050 0.400 137.992 68.996 RHS Complite
107+623 1x11.0 Minor BridgReconstruction 2x5.5 Skew 12 Approch Slab PCC 2 3.600 12.250 0.100 8.820 8.820
107+623 1x11.0 Minor BridgReconstruction 2x5.5 Skew 12 Approch Slab 2 3.500 12.050 0.300 25.305 25.305
Total Quantity 458.585
#REF! 109+240 2x10.8 Minor BridgReconstruction 4x5.4 PCC 1 28.200 23.350 0.100 65.847 BHS Complite
#REF! 109+240 2x10.8 Minor BridgReconstruction 4x5.4 Raft 1 28.000 23.150 0.450 291.690 BHS Complite
#REF! 109+240 2x10.8 Minor BridgReconstruction 4x5.4 Wall 2 28.000 0.400 3.785 84.784 BHS Complite
#REF! 109+240 2x10.8 Minor BridgReconstruction 4x5.4 Wall 3 28.000 0.250 3.785 79.485 BHS Complite
#REF! 109+240 2x10.8 Minor BridgReconstruction 4x5.4 Hunch 16 28.000 0.150 0.150 10.080 BHS Complite
#REF! 109+240 2x10.8 Minor BridgReconstruction 4x5.4 Slab 1 28.000 23.150 0.400 259.280 BHS Complite
17 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Minor Bridge
Span Structure Thickness/ Balance
Sr. No. Chainage Type of Construction Span (GAD Skew Item Nos Length Width Quantity Remark
(P&P) Type Height Quantity
#REF! 109+240 2x10.8 Minor BridgReconstruction 4x5.4 Approch Slab PCC 2 3.600 23.350 0.100 16.812 16.812
#REF! 109+240 2x10.8 Minor BridgReconstruction 4x5.4 Approch Slab 2 3.500 23.150 0.300 48.615 48.615
Total Quantity 856.593
#REF! 114+516 2x4.5 Minor BridgNew Construction 2x3.95 Skew 8 PCC 1 28.485 9.124 0.150 38.985 BHS Complite
114+516 2x4.5 Minor BridgNew Construction 2x3.95 Skew 8 Raft 1 28.283 8.924 0.450 113.579 BHS Complite
114+516 2x4.5 Minor BridgNew Construction 2x3.95 Skew 8 Wall 2 28.283 0.400 3.714 84.034 BHS Complite
114+516 2x4.5 Minor BridgNew Construction 2x3.95 Skew 8 Wall 1 28.283 0.300 3.714 31.513 BHS Complite
114+516 2x4.5 Minor BridgNew Construction 2x3.95 Skew 8 Hunch 8 28.283 0.150 0.150 5.091 BHS Complite
114+516 2x4.5 Minor BridgNew Construction 2x3.95 Skew 8 Slab 1 28.283 8.924 0.375 94.649 BHS Complite
114+516 2x4.5 Minor BridgNew Construction 2x3.95 Skew 8 Approch Slab PCC 2 3.600 9.124 0.100 6.569 6.569
114+516 2x4.5 Minor BridgNew Construction 2x3.95 Skew 8 Approch Slab 2 3.500 8.924 0.300 18.740 18.740
Total Quantity 393.160
#REF! 116+053 1x9.9 Minor BridgReconstruction 2x3.95 PCC 1 34.925 9.124 0.100 31.866 15.933 RHS Complite
116+053 1x9.9 Minor BridgReconstruction 2x3.95 Raft 1 34.725 8.924 0.450 139.449 69.724 RHS Complite
116+053 1x9.9 Minor BridgReconstruction 2x3.95 Wall 2 34.725 0.400 3.714 103.175 51.587 RHS Complite
116+053 1x9.9 Minor BridgReconstruction 2x3.95 Wall 1 34.725 0.300 3.714 38.691 19.345 RHS Complite
116+053 1x9.9 Minor BridgReconstruction 2x3.95 Hunch 8 34.725 0.150 0.150 6.251 3.125 RHS Complite
116+053 1x9.9 Minor BridgReconstruction 2x3.95 Slab 1 34.725 8.924 0.375 116.207 58.104 RHS Complite
116+053 1x9.9 Minor BridgReconstruction 2x3.95 Approch Slab PCC 2 3.600 9.124 0.100 6.569 6.569
116+053 1x9.9 Minor BridgReconstruction 2x3.95 Approch Slab 2 3.500 8.924 0.300 18.740 18.740
Total Quantity 460.947
#REF! 116+474 1x13.0 Minor BridgReconstruction 2x6 PCC 1 28.200 13.300 0.100 37.506 18.753 RHS Complite
116+474 1x13.0 Minor BridgReconstruction 2x6 Raft 1 28.000 13.100 0.450 165.060 82.530 RHS Complite
116+474 1x13.0 Minor BridgReconstruction 2x6 Wall 2 28.000 0.400 2.854 63.930 31.965 RHS Complite
116+474 1x13.0 Minor BridgReconstruction 2x6 Wall 1 28.000 0.300 2.854 23.974 11.987 RHS Complite
116+474 1x13.0 Minor BridgReconstruction 2x6 Hunch 8 28.000 0.150 0.150 5.040 2.520 RHS Complite
116+474 1x13.0 Minor BridgReconstruction 2x6 Slab 1 28.000 13.100 0.375 137.550 68.775 RHS Complite
116+474 1x13.0 Minor BridgReconstruction 2x6 Approch Slab PCC 2 3.600 13.300 0.100 9.576 9.576
116+474 1x13.0 Minor BridgReconstruction 2x6 Approch Slab 2 3.500 13.100 0.300 27.510 27.510
Total Quantity 470.145
#REF! 116+843 1x8.7 Minor BridgReconstruction 1x8 PCC 1 28.200 9.100 0.100 25.662 12.831 RHS Complite
116+843 1x8.7 Minor BridgReconstruction 1x8 Raft 1 28.000 8.900 0.550 137.060 68.530 RHS Complite
116+843 1x8.7 Minor BridgReconstruction 1x8 Wall 2 28.000 0.450 1.713 43.168 21.584 RHS Complite
116+843 1x8.7 Minor BridgReconstruction 1x8 Wall 0 0.000 0.000 0.000 0.000 0.000 RHS Complite
116+843 1x8.7 Minor BridgReconstruction 1x8 Hunch 4 28.000 0.150 0.150 2.520 1.260 RHS Complite
116+843 1x8.7 Minor BridgReconstruction 1x8 Slab 1 28.000 8.900 0.500 124.600 62.300 RHS Complite
116+843 1x8.7 Minor BridgReconstruction 1x8 Approch Slab PCC 2 3.600 9.100 0.100 6.552 6.552
116+843 1x8.7 Minor BridgReconstruction 1x8 Approch Slab 2 3.500 8.900 0.300 18.690 18.690
Total Quantity 358.252
#REF! 117+438 2x5.5 Minor BridgNew Construction 2x5.5 PCC 1 43.277 12.300 0.100 53.230 26.615 RHS Complite
117+438 2x5.5 Minor BridgNew Construction 2x5.5 Raft 1 43.077 12.100 0.450 234.552 117.276 RHS Complite
18 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Minor Bridge
Span Structure Thickness/ Balance
Sr. No. Chainage Type of Construction Span (GAD Skew Item Nos Length Width Quantity Remark
(P&P) Type Height Quantity
117+438 2x5.5 Minor BridgNew Construction 2x5.5 Wall 2 43.077 0.400 2.203 75.918 37.959 RHS Complite
117+438 2x5.5 Minor BridgNew Construction 2x5.5 Wall 1 43.077 0.300 2.203 28.469 14.235 RHS Complite
117+438 2x5.5 Minor BridgNew Construction 2x5.5 Hunch 8 43.077 0.150 0.150 7.754 3.877 RHS Complite
117+438 2x5.5 Minor BridgNew Construction 2x5.5 Slab 1 43.077 12.100 0.500 260.613 130.306 RHS Complite
117+438 2x5.5 Minor BridgNew Construction 2x5.5 Approch Slab PCC 2 3.600 12.300 0.100 8.856 8.856
117+438 2x5.5 Minor BridgNew Construction 2x5.5 Approch Slab 2 3.500 12.100 0.300 25.410 25.410
Total Quantity 694.802
#REF! 117+891 4x3.0 Minor BridgNew Construction MC 2x6 PCC 1 54.800 13.300 0.100 72.884 37.905 SR Str. Compilte
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Raft 1 54.600 13.100 0.450 321.867 168.008 SR Str. Compilte
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Wall MCW 2 28.500 0.400 3.998 91.154 91.154 SR Str. Compilte
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Wall MCW 1 28.500 0.300 3.998 34.183 34.183 SR Str. Compilte
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Wall SR 2 26.100 0.400 2.340 48.859 SR Str. Compilte
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Wall SR 1 26.100 0.300 2.340 18.322 SR Str. Compilte
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Hunch 16 54.600 0.150 0.150 19.656 10.260 SR Str. Compilte
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Slab 1 54.600 13.100 0.500 357.630 186.675 SR Str. Compilte
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Approch Slab PCC 2 3.600 13.300 0.100 9.576 9.576
117+891 4x3.0 Minor BridgNew Construction MC 2x6 Approch Slab 2 3.500 13.100 0.300 27.510 27.510
Total Quantity 1001.642
#REF! 118+378 2x14.2 Minor BridgReconstruction 4x7.1 PCC 1 28.200 30.150 0.100 85.023 42.512 RHS Complite
118+378 2x14.2 Minor BridgReconstruction 4x7.1 Raft 1 28.000 29.950 0.525 440.265 220.133 RHS Complite
118+378 2x14.2 Minor BridgReconstruction 4x7.1 Wall 2 28.000 0.400 3.974 89.018 44.509 RHS Complite
118+378 2x14.2 Minor BridgReconstruction 4x7.1 Wall 3 28.000 0.250 3.974 83.454 41.727 RHS Complite
118+378 2x14.2 Minor BridgReconstruction 4x7.1 Hunch 16 28.000 0.150 0.150 10.080 5.040 RHS Complite
118+378 2x14.2 Minor BridgReconstruction 4x7.1 Slab 1 28.000 29.950 0.500 419.300 209.650 RHS Complite
118+378 2x14.2 Minor BridgReconstruction 4x7.1 Approch Slab PCC 2 3.600 30.150 0.100 21.708 21.708
118+378 2x14.2 Minor BridgReconstruction 4x7.1 Approch Slab 2 3.500 29.950 0.300 62.895 62.895
Total Quantity 1211.743
#REF! 119+322 1x16.5 Minor BridgReconstruction 3x5.2 PCC 1 25.400 17.200 0.100 43.688 21.844 RHS Complite
119+322 1x16.5 Minor BridgReconstruction 3x5.2 Raft 1 25.000 17.000 0.525 223.125 111.563 RHS Complite
119+322 1x16.5 Minor BridgReconstruction 3x5.2 Wall 2 25.000 0.400 3.765 75.300 37.650 RHS Complite
119+322 1x16.5 Minor BridgReconstruction 3x5.2 Wall 2 25.000 0.300 3.765 56.475 28.238 RHS Complite
119+322 1x16.5 Minor BridgReconstruction 3x5.2 Hunch 12 25.000 0.150 0.150 6.750 3.375 RHS Complite
119+322 1x16.5 Minor BridgReconstruction 3x5.2 Slab 1 25.000 17.000 0.500 212.500 106.250 RHS Complite
119+322 1x16.5 Minor BridgReconstruction 3x5.2 Approch Slab PCC 2 3.600 17.200 0.100 12.384 12.384
119+322 1x16.5 Minor BridgReconstruction 3x5.2 Approch Slab 2 3.500 17.000 0.300 35.700 35.700
Total Quantity 665.922
#REF! 119+721 1x8.1 Minor BridgReconstruction 1x7.4 PCC 1 25.200 8.400 0.100 21.168 10.584 RHS Complite
119+721 1x8.1 Minor BridgReconstruction 1x7.4 Raft 1 24.800 8.200 0.500 101.680 50.840 RHS Complite
119+721 1x8.1 Minor BridgReconstruction 1x7.4 Wall 2 24.800 0.400 2.016 39.997 19.999 RHS Complite
119+721 1x8.1 Minor BridgReconstruction 1x7.4 Wall 0 24.800 0.300 2.016 0.000 0.000 RHS Complite
119+721 1x8.1 Minor BridgReconstruction 1x7.4 Hunch 4 24.800 0.150 0.150 2.232 1.116 RHS Complite
19 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Minor Bridge
Span Structure Thickness/ Balance
Sr. No. Chainage Type of Construction Span (GAD Skew Item Nos Length Width Quantity Remark
(P&P) Type Height Quantity
119+721 1x8.1 Minor BridgReconstruction 1x7.4 Slab 1 24.800 8.200 0.450 91.512 45.756 RHS Complite
119+721 1x8.1 Minor BridgReconstruction 1x7.4 Approch Slab PCC 2 3.600 8.400 0.100 6.048 6.048
119+721 1x8.1 Minor BridgReconstruction 1x7.4 Approch Slab 2 3.500 8.200 0.300 17.220 17.220
Total Quantity 279.857
#REF! 121+051 1x8.4 Minor BridgReconstruction 1x8.3 Skew 13.24 PCC 1 28.982 8.279 0.100 23.994 23.994
121+051 1x8.4 Minor BridgReconstruction 1x8.3 Skew 13.24 Raft 1 28.776 8.079 0.550 127.865 127.865
121+051 1x8.4 Minor BridgReconstruction 1x8.3 Skew 13.24 Wall 2 28.776 0.450 3.667 94.969 94.969
121+051 1x8.4 Minor BridgReconstruction 1x8.3 Skew 13.24 Wall 0 28.776 0.300 3.667 0.000 0.000
121+051 1x8.4 Minor BridgReconstruction 1x8.3 Skew 13.24 Hunch 4 28.776 0.150 0.150 2.590 2.590
121+051 1x8.4 Minor BridgReconstruction 1x8.3 Skew 13.24 Slab 1 28.776 8.079 0.500 116.241 116.241
121+051 1x8.4 Minor BridgReconstruction 1x8.3 Skew 13.24 Approch Slab PCC 2 3.600 8.279 0.100 5.961 5.961
121+051 1x8.4 Minor BridgReconstruction 1x8.3 Skew 13.24 Approch Slab 2 3.500 8.079 0.300 16.966 16.966
Total Quantity 388.586
#REF! 121+461 3x3.0 Minor BridgReconstruction 3x3.0 PCC 1 17.955 10.400 0.100 18.673 9.337 RHS Complite
121+461 3x3.0 Minor BridgReconstruction 3x3.0 Raft 1 17.755 10.200 0.325 58.858 29.429 RHS Complite
121+461 3x3.0 Minor BridgReconstruction 3x3.0 Wall 4 17.755 0.300 1.306 27.826 13.913 RHS Complite
121+461 3x3.0 Minor BridgReconstruction 3x3.0 Wall 0 17.755 0.300 1.306 0.000 0.000 RHS Complite
121+461 3x3.0 Minor BridgReconstruction 3x3.0 Hunch 12 17.755 0.150 0.150 4.794 2.397 RHS Complite
121+461 3x3.0 Minor BridgReconstruction 3x3.0 Slab 1 17.755 10.200 0.300 54.330 27.165 RHS Complite
121+461 3x3.0 Minor BridgReconstruction 3x3.0 Approch Slab PCC 2 3.600 10.400 0.100 7.488 7.488
121+461 3x3.0 Minor BridgReconstruction 3x3.0 Approch Slab 2 3.500 10.200 0.300 21.420 21.420
Total Quantity 193.389
#REF! 122+241 2x13.5 Minor BridgReconstruction 4x6.6 PCC 1 28.146 25.928 0.100 72.977 72.977
122+241 2x13.5 Minor BridgReconstruction 4x6.6 Raft 1 27.925 25.728 0.500 359.227 359.227
122+241 2x13.5 Minor BridgReconstruction 4x6.6 Wall 2 27.925 0.450 3.502 88.014 88.014
122+241 2x13.5 Minor BridgReconstruction 4x6.6 Wall 3 27.925 0.300 3.502 88.014 88.014
122+241 2x13.5 Minor BridgReconstruction 4x6.6 Hunch 16 27.925 0.150 0.150 10.053 10.053
122+241 2x13.5 Minor BridgReconstruction 4x6.6 Slab 1 27.925 25.728 0.450 323.304 323.304
122+241 2x13.5 Minor BridgReconstruction 4x6.6 Approch Slab PCC 2 3.600 25.928 0.100 18.668 18.668
122+241 2x13.5 Minor BridgReconstruction 4x6.6 Approch Slab 2 3.500 25.728 0.300 54.029 54.029
Total Quantity 1014.287
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 PCC 1 51.650 13.300 0.100 68.695 68.695
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Raft MCW 1 28.500 13.100 0.850 317.348 317.348
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Raft SR 1 22.950 13.100 0.550 165.355 165.355
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Wall MCW 2 28.500 0.800 4.600 209.760 209.760
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Wall MCW 0 0.000 0.000 0.000 0.000 0.000
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Wall SR 2 22.950 0.450 2.153 44.470 44.470
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Wall SR 0 0.000 0.000 0.000 0.000 0.000
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Hunch 8 28.500 0.150 0.150 5.130 5.130
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Slab MCW 1 28.500 13.100 0.800 298.680 298.680
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Slab 1 22.950 13.100 0.500 150.323 150.323
20 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Minor Bridge
Span Structure Thickness/ Balance
Sr. No. Chainage Type of Construction Span (GAD Skew Item Nos Length Width Quantity Remark
(P&P) Type Height Quantity
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Approch Slab PCC 2 3.600 13.300 0.100 9.576 9.576
#REF! 122+793 1x8.3 Minor BridgReconstruction 1x8.3 Approch Slab 2 3.500 13.100 0.300 27.510 27.510
Total Quantity 1296.845
#REF! 123+672 1x18.2 Minor BridgNew Construction 3x5.6 PCC 1 12.600 18.300 0.100 23.058 11.529 RHS Compilte
123+672 1x18.2 Minor BridgNew Construction 3x5.6 Raft 1 12.500 18.100 0.450 101.813 50.906 RHS Compilte
123+672 1x18.2 Minor BridgNew Construction 3x5.6 Wall 2 12.500 4.000 3.087 308.700 154.350 RHS Compilte
123+672 1x18.2 Minor BridgNew Construction 3x5.6 Wall 2 12.500 0.250 3.087 19.294 9.647 RHS Compilte
123+672 1x18.2 Minor BridgNew Construction 3x5.6 Hunch 12 12.500 0.150 0.150 3.375 1.688 RHS Compilte
123+672 1x18.2 Minor BridgNew Construction 3x5.6 Slab 1 12.500 18.100 0.400 90.500 45.250 RHS Compilte
123+672 1x18.2 Minor BridgNew Construction 3x5.6 Approch Slab PCC 2 3.600 18.300 0.100 13.176 13.176
123+672 1x18.2 Minor BridgNew Construction 3x5.6 Approch Slab 2 3.500 18.100 0.300 38.010 38.010
Total Quantity 597.925
#REF! 124+015 5x8.2 Minor BridgNew Construction 5x7.78 PCC 1 20.444 39.661 0.100 81.083 40.541 RHS Compilte
124+015 5x8.2 Minor BridgNew Construction 5x7.78 Raft 1 20.233 39.461 0.750 598.811 299.405 RHS Compilte
124+015 5x8.2 Minor BridgNew Construction 5x7.78 Wall 2 20.233 0.528 3.375 72.110 36.055 RHS Compilte
124+015 5x8.2 Minor BridgNew Construction 5x7.78 Wall 4 20.233 0.400 3.375 109.258 54.629 RHS Compilte
124+015 5x8.2 Minor BridgNew Construction 5x7.78 Hunch 20 20.233 0.150 0.150 9.105 4.552 RHS Compilte
124+015 5x8.2 Minor BridgNew Construction 5x7.78 Slab 1 20.233 39.461 0.700 558.890 279.445 RHS Compilte
124+015 5x8.2 Minor BridgNew Construction 5x7.78 Approch Slab PCC 2 3.600 39.661 0.100 28.556 28.556
124+015 5x8.2 Minor BridgNew Construction 5x7.78 Approch Slab 2 3.500 39.461 0.300 82.868 82.868
Total Quantity 1540.681
#REF! 124+391 4x9.4 Minor BridgNew Construction 5x8.96 PCC 1 20.024 47.200 0.100 94.513 47.257 RHS Compilte
124+391 4x9.4 Minor BridgNew Construction 5x8.96 Raft 1 19.824 47.000 0.600 559.037 279.518 RHS Compilte
124+391 4x9.4 Minor BridgNew Construction 5x8.96 Wall 2 19.824 0.500 2.661 52.752 26.376 RHS Compilte
124+391 4x9.4 Minor BridgNew Construction 5x8.96 Wall 4 19.824 0.300 2.661 63.302 31.651 RHS Compilte
124+391 4x9.4 Minor BridgNew Construction 5x8.96 Hunch 20 19.824 0.150 0.150 8.921 4.460 RHS Compilte
124+391 4x9.4 Minor BridgNew Construction 5x8.96 Slab 1 19.824 47.000 0.550 512.450 256.225 RHS Compilte
124+391 4x9.4 Minor BridgNew Construction 5x8.96 Approch Slab PCC 2 3.600 47.200 0.100 33.984 33.984
124+391 4x9.4 Minor BridgNew Construction 5x8.96 Approch Slab 2 3.500 47.000 0.300 98.700 98.700
Total Quantity 1423.659
#REF! 125+791 1x10.2 Minor BridgReconstruction 2x4.6 PCC 1 28.200 10.400 0.100 29.328 14.664 LHS Raft Compilte
125+791 1x10.2 Minor BridgReconstruction 2x4.6 Raft 1 28.000 10.200 0.450 128.520 64.260 LHS Raft Compilte
125+791 1x10.2 Minor BridgReconstruction 2x4.6 Wall 2 28.000 0.375 2.838 59.598 59.598
125+791 1x10.2 Minor BridgReconstruction 2x4.6 Wall 1 28.000 0.250 2.838 19.866 19.866
125+791 1x10.2 Minor BridgReconstruction 2x4.6 Hunch 8 28.000 0.150 0.150 5.040 5.040
125+791 1x10.2 Minor BridgReconstruction 2x4.6 Slab 1 28.000 10.200 0.400 114.240 114.240
125+791 1x10.2 Minor BridgReconstruction 2x4.6 Approch Slab PCC 2 3.600 10.400 0.100 7.488 7.488
125+791 1x10.2 Minor BridgReconstruction 2x4.6 Approch Slab 2 3.500 10.200 0.300 21.420 21.420
Total Quantity 385.500
#REF! 126+655 1x10 Minor BridgReconstruction 2x4.5 Skew 16.95 PCC 1 26.569 9.858 0.100 26.192 26.192
126+655 1x10 Minor BridgReconstruction 2x4.5 Skew 16.95 Raft 1 26.151 9.658 0.450 113.655 113.655
21 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Minor Bridge
Span Structure Thickness/ Balance
Sr. No. Chainage Type of Construction Span (GAD Skew Item Nos Length Width Quantity Remark
(P&P) Type Height Quantity
126+655 1x10 Minor BridgReconstruction 2x4.5 Skew 16.95 Wall 2 26.151 0.400 3.064 64.101 64.101
126+655 1x10 Minor BridgReconstruction 2x4.5 Skew 16.95 Wall 1 26.151 0.250 3.064 20.032 20.032
126+655 1x10 Minor BridgReconstruction 2x4.5 Skew 16.95 Hunch 8 26.151 0.150 0.150 4.707 4.707
126+655 1x10 Minor BridgReconstruction 2x4.5 Skew 16.95 Slab 1 26.151 9.658 0.400 101.027 101.027
126+655 1x10 Minor BridgReconstruction 2x4.5 Skew 16.95 Approch Slab PCC 2 3.600 9.858 0.100 7.098 7.098
126+655 1x10 Minor BridgReconstruction 2x4.5 Skew 16.95 Approch Slab 2 3.500 9.658 0.300 20.282 20.282
Total Quantity 357.093
#REF! 127+016 2x11.8 Minor BridgReconstruction 4x5.575 PCC 1 25.400 24.200 0.100 61.468 61.468
127+016 2x11.8 Minor BridgReconstruction 4x5.575 Raft 1 25.000 24.000 0.525 315.000 315.000
127+016 2x11.8 Minor BridgReconstruction 4x5.575 Wall 2 25.000 0.400 3.750 75.000 75.000
127+016 2x11.8 Minor BridgReconstruction 4x5.575 Wall 3 25.000 0.300 3.750 84.375 84.375
127+016 2x11.8 Minor BridgReconstruction 4x5.575 Hunch 16 25.000 0.150 0.150 9.000 9.000
127+016 2x11.8 Minor BridgReconstruction 4x5.575 Slab 1 25.000 24.000 0.500 300.000 300.000
127+016 2x11.8 Minor BridgReconstruction 4x5.575 Approch Slab PCC 2 3.600 24.200 0.100 17.424 17.424
127+016 2x11.8 Minor BridgReconstruction 4x5.575 Approch Slab 2 3.500 24.000 0.300 50.400 50.400
Total Quantity 912.667
#REF! 127+219 1x18.6 Minor BridgReconstruction 3x5.8 PCC 1 25.400 19.100 0.100 48.514 48.514
127+219 1x18.6 Minor BridgReconstruction 3x5.8 Raft 1 25.000 18.900 0.500 236.250 236.250
127+219 1x18.6 Minor BridgReconstruction 3x5.8 Wall 2 25.000 0.450 4.575 102.938 102.938
127+219 1x18.6 Minor BridgReconstruction 3x5.8 Wall 2 25.000 0.300 4.575 68.625 68.625
127+219 1x18.6 Minor BridgReconstruction 3x5.8 Hunch 16 25.000 0.150 0.150 9.000 9.000
127+219 1x18.6 Minor BridgReconstruction 3x5.8 Slab 1 25.000 18.900 0.400 189.000 189.000
127+219 1x18.6 Minor BridgReconstruction 3x5.8 Approch Slab PCC 2 3.600 19.100 0.100 13.752 13.752
127+219 1x18.6 Minor BridgReconstruction 3x5.8 Approch Slab 2 3.500 18.900 0.300 39.690 39.690
Total Quantity 707.769
#REF! 129+238 1x22.5 Minor BridgReconstruction 3x7.1 PCC 1 28.200 23.300 0.100 65.706 32.853 RHS PCC Complite
129+238 1x22.5 Minor BridgReconstruction 3x7.1 Raft 1 28.000 23.100 0.700 452.760 452.760
129+238 1x22.5 Minor BridgReconstruction 3x7.1 Wall 2 28.000 0.500 3.915 109.620 109.620
129+238 1x22.5 Minor BridgReconstruction 3x7.1 Wall 2 28.000 0.400 3.915 87.696 87.696
129+238 1x22.5 Minor BridgReconstruction 3x7.1 Hunch 12 28.000 0.150 0.150 7.560 7.560
129+238 1x22.5 Minor BridgReconstruction 3x7.1 Slab 1 28.000 23.100 0.650 420.420 420.420
129+238 1x22.5 Minor BridgReconstruction 3x7.1 Approch Slab PCC 2 3.600 23.300 0.100 16.776 16.776
129+238 1x22.5 Minor BridgReconstruction 3x7.1 Approch Slab 2 3.500 23.100 0.300 48.510 48.510
Total Quantity 1209.048
#REF! 129+943 2x3.4 Minor BridgNew Construction 1x6.0 PCC 1 14.040 7.100 0.100 9.968 9.968
129+943 2x3.4 Minor BridgNew Construction 1x6.0 Raft 1 13.940 6.900 0.450 43.284 43.284
129+943 2x3.4 Minor BridgNew Construction 1x6.0 Wall 2 13.940 0.450 2.750 34.502 34.502
129+943 2x3.4 Minor BridgNew Construction 1x6.0 Wall 0 0.000 0.000 0.000 0.000 0.000
129+943 2x3.4 Minor BridgNew Construction 1x6.0 Hunch 4 13.940 0.150 0.150 1.255 1.255
129+943 2x3.4 Minor BridgNew Construction 1x6.0 Slab 1 13.940 6.900 0.425 40.879 40.879
129+943 2x3.4 Minor BridgNew Construction 1x6.0 Approch Slab PCC 2 3.600 7.100 0.100 5.112 5.112
22 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF
GUJRAT
Minor Bridge
Span Structure Thickness/ Balance
Sr. No. Chainage Type of Construction Span (GAD Skew Item Nos Length Width Quantity Remark
(P&P) Type Height Quantity
129+943 2x3.4 Minor BridgNew Construction 1x6.0 Approch Slab 2 3.500 6.900 0.300 14.490 14.490
Total Quantity 149.489
#REF! 134+061 5x3.5 Minor BridgNew Construction 5x3.25 PCC 1 28.200 17.950 0.100 50.619 50.619
134+061 5x3.5 Minor BridgNew Construction 5x3.25 Raft 1 28.000 17.750 0.250 124.250 124.250
134+061 5x3.5 Minor BridgNew Construction 5x3.25 Wall 6 28.000 0.250 2.940 123.480 123.480
134+061 5x3.5 Minor BridgNew Construction 5x3.25 Wall 0 0.000 0.000 0.000 0.000 0.000
134+061 5x3.5 Minor BridgNew Construction 5x3.25 Hunch 20 28.000 0.150 0.150 12.600 12.600
134+061 5x3.5 Minor BridgNew Construction 5x3.25 Slab 1 28.000 17.750 0.250 124.250 124.250
134+061 5x3.5 Minor BridgNew Construction 5x3.25 Approch Slab PCC 2 3.600 17.950 0.100 12.924 12.924
134+061 5x3.5 Minor BridgNew Construction 5x3.25 Approch Slab 2 3.500 17.750 0.300 37.275 37.275
Total Quantity 485.398
#REF! 138+580 2x4.5 Minor BridgNew Construction 2x4.5 PCC 1 28.200 14.400 0.100 40.608 40.608
138+580 2x4.5 Minor BridgNew Construction 2x4.5 Raft 1 28.000 14.200 0.500 198.800 198.800
138+580 2x4.5 Minor BridgNew Construction 2x4.5 Wall 2 28.000 0.450 4.500 113.400 113.400
138+580 2x4.5 Minor BridgNew Construction 2x4.5 Wall 1 28.000 0.300 4.500 37.800 37.800
138+580 2x4.5 Minor BridgNew Construction 2x4.5 Hunch 8 28.000 0.150 0.150 5.040 5.040
138+580 2x4.5 Minor BridgNew Construction 2x4.5 Slab 1 28.000 14.200 0.450 178.920 178.920
138+580 2x4.5 Minor BridgNew Construction 2x4.5 Approch Slab PCC 2 3.600 14.400 0.100 10.368 10.368
138+580 2x4.5 Minor BridgNew Construction 2x4.5 Approch Slab 2 3.500 14.200 0.300 29.820 29.820
Total Quantity 614.756

23 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF GUJRAT
Major Bridge
Pile Balance
Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Th/Height Quantity Remark
Area/Width Quantity

1 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile A1 12 18.515 1.130 251.152 Complite
2 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile P1 6 14.811 0.785 69.760 Complite
3 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile P2 6 16.269 0.785 76.627 Complite
4 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile P3 6 13.627 0.785 64.183 Complite
5 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile A2 12 13.662 1.130 185.322 Complite
6 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap PCC A1 1 16.750 4.700 0.080 6.298 Complite
7 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap PCC P1 1 7.500 4.500 0.080 2.700 Complite
8 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap PCC P2 1 7.500 4.500 0.080 2.700 Complite
9 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap PCC P3 1 7.500 4.500 0.080 2.700 Complite
10 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap PCC A2 1 17.010 4.700 0.080 6.396 Complite
11 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap A1 1 16.550 4.500 1.800 134.055 134.055
12 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap P1 1 7.300 4.300 1.500 47.085 47.085
13 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap P2 1 7.300 4.300 1.500 47.085 47.085
14 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap P3 1 7.300 4.300 1.500 47.085 47.085
15 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile Cap A2 1 16.810 4.500 1.800 136.161 136.161
16 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Abutment 1 1 15.500 1.200 2.977 55.372 55.372
17 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pier 1 1 4.200 1.200 4.314 21.743 21.743
18 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pier 2 1 4.200 1.200 4.120 20.765 20.765
19 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pier 3 1 4.200 1.200 2.851 14.369 14.369
20 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Abutment 2 1 15.500 1.200 3.323 61.808 61.808
21 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 15.500 1.310 0.400 8.122 8.122
Abutment Cap 1
22 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 15.500 1.420 0.400 8.804 8.804
23 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 7.250 2.400 0.750 13.050 13.050
Pier Cap 1
24 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 10.300 2.400 0.750 18.540 18.540
25 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 7.250 2.400 0.750 13.050 13.050
Pier Cap 2
26 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 10.300 2.400 0.750 18.540 18.540
27 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 7.250 2.400 0.750 13.050 13.050
Pier Cap 3
28 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 10.300 2.400 0.750 18.540 18.540
29 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 15.500 1.310 0.400 8.122 8.122
Abutment Cap 2
30 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 1 15.500 1.420 0.400 8.804 8.804
31 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Slab 1 78.000 15.500 0.275 332.475 332.475
32 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 4 23.000 1.000 0.150 13.800 13.800
33 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 4 23.000 0.650 0.750 44.850 44.850
Gider 24 Mtr Span
34 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 4 23.000 0.300 1.175 32.430 32.430
At Mid
35 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 4 23.000 0.450 0.150 6.210 6.210
36 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 4 23.000 0.600 0.250 13.800 13.800
37 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 4 23.000 1.000 0.150 13.800 13.800
Gider 24 Mtr Span
38 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 4 23.000 0.800 0.430 31.648 31.648
At Support
39 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 4 23.000 0.600 1.607 88.706 88.706
40 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 17.000 1.000 0.150 5.100 5.100
41 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 17.000 0.650 0.750 16.575 16.575
Gider 18 Mtr Span
At Mid
Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Pile Th/Height Quantity Balance Remark
Area/Width Quantity
Gider 18 Mtr Span
42 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 17.000 0.300 0.825 8.415 8.415
At Mid
43 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 17.000 0.450 0.150 2.295 2.295
44 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 17.000 0.600 0.250 5.100 5.100
45 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 17.000 1.000 0.150 5.100 5.100
Gider 18 Mtr Span
46 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 17.000 0.800 0.430 11.696 11.696
At Support
47 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 17.000 0.600 1.257 25.643 25.643
48 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 11.000 1.000 0.150 3.300 3.300
49 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 11.000 0.650 0.750 10.725 10.725
Gider 12 Mtr Span
50 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 11.000 0.300 0.425 2.805 2.805
At Mid
51 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 11.000 0.450 0.150 1.485 1.485
52 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 11.000 0.600 0.250 3.300 3.300
53 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 11.000 1.000 0.150 3.300 3.300
Gider 12 Mtr Span
54 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 11.000 0.800 0.430 7.568 7.568
At Support
55 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 2 11.000 0.600 0.857 11.312 11.312
Total Quantity
56 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile A1 24 24.394 1.130 661.799 Complite
57 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile P1 12 28.000 0.785 263.760 Complite
58 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile P2 12 28.000 0.785 263.760 Complite
59 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile P3 12 28.000 0.785 263.760 Complite
60 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile P4 12 28.000 0.785 263.760 Complite
61 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile A2 24 24.009 1.130 651.355 Complite
62 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap PCC A1 1 28.200 5.300 0.080 11.957 Complite
63 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap PCC P1 2 7.500 4.500 0.080 5.400 Complite
64 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap PCC P2 2 7.500 4.500 0.080 5.400 5.400
65 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap PCC P3 2 7.500 4.500 0.080 5.400 Complite
66 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap PCC P4 2 7.500 4.500 0.080 5.400 Complite
67 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap PCC A2 1 28.200 5.300 0.080 11.957 Complite
68 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap A1 1 28.000 5.100 1.800 257.040 Complite
69 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap P1 2 7.300 4.300 1.500 94.170 Complite
70 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap P2 2 7.300 4.300 1.500 94.170 Complite
71 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap P3 2 7.300 4.300 1.500 94.170 Complite
72 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap P4 2 7.300 4.300 1.500 94.170 94.170
73 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pile Cap A2 1 28.000 5.100 1.800 257.040 Complite
74 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Abutment 1 1 28.000 1.000 2.013 56.364 Complite
75 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pier 1 2 4.200 1.200 3.814 38.445 Complite
76 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pier 2 2 4.200 1.200 3.814 38.445 Complite
77 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pier 3 2 4.200 1.200 3.814 38.445 Complite
78 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Pier 4 2 4.200 1.200 3.814 38.445 38.445
79 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Abutment 2 1 28.000 1.000 1.579 44.212 Complite
80 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 1 28.000 1.210 0.400 13.552 13.552
Abutment Cap 1
81 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 1 28.000 1.420 0.400 15.904 15.904
82 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 2 7.250 2.400 0.750 26.100 26.100
Pier Cap 1
83 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 2 10.300 2.400 0.750 37.080 37.080
84 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 2 7.250 2.400 0.750 26.100 26.100
Pier Cap 2
85 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 2 10.300 2.400 0.750 37.080 37.080
Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Pile Th/Height Quantity Balance Remark
Area/Width Quantity
86 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 2 7.250 2.400 0.750 26.100 26.100
Pier Cap 3
87 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 2 10.300 2.400 0.750 37.080 37.080
88 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 2 7.250 2.400 0.750 26.100 26.100
Pier Cap 4
89 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 2 10.300 2.400 0.750 37.080 37.080
90 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 1 28.000 1.210 0.400 13.552 13.552
Abutment Cap 2
91 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 1 28.000 1.420 0.400 15.904 15.904
92 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Slab 1 104.800 28.000 0.275 806.960 806.960
93 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 20 20.960 1.000 0.150 62.880 62.880
94 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 20 20.960 0.650 0.750 204.360 204.360
95 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Gider At Mid Span 20 20.960 0.300 1.025 128.904 128.904
96 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 20 20.960 0.450 0.150 28.296 28.296
97 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 20 20.960 0.600 0.250 62.880 62.880
98 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 20 20.960 1.000 0.150 62.880 62.880
99 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 Girder At Support 20 20.960 0.800 0.430 144.205 144.205
100 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96 20 20.960 0.600 1.457 366.465 366.465
Total Quantity
101 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile A1 24 21.200 1.130 575.148
102 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile P1 12 27.200 0.785 256.224 256.224
103 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile P2 12 27.200 0.785 256.224 256.224
104 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile A2 24 21.200 1.130 575.148 311.538
105 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile Cap PCC A1 1 28.200 4.700 0.080 10.603
106 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile Cap PCC P1 2 8.900 5.300 0.080 7.547 7.547
107 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile Cap PCC P2 2 8.900 5.300 0.080 7.547 7.547
108 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile Cap PCC A2 1 28.200 4.700 0.080 10.603 10.603
109 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile Cap A1 1 28.000 4.500 1.800 226.800 226.800
110 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile Cap P1 2 8.700 5.100 1.800 159.732 159.732
111 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile Cap P2 2 8.700 5.100 1.800 159.732 159.732
112 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pile Cap A2 1 28.000 4.500 1.800 226.800 226.800
113 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Abutment 1 1 28.000 1.200 3.010 101.136 101.136
114 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pier 1 2 4.200 1.200 3.374 34.010 34.010
115 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Pier 2 2 4.200 1.200 3.374 34.010 34.010
116 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Abutment 2 1 28.000 1.200 3.010 101.136 101.136
117 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 1 28.000 1.310 0.400 14.672 14.672
Abutment Cap 1
118 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 1 28.000 1.420 0.400 15.904 15.904
119 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 2 7.250 2.400 0.750 26.100 26.100
Pier Cap 1
120 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 2 10.300 2.400 0.750 37.080 37.080
121 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 2 7.250 2.400 0.750 26.100 26.100
Pier Cap2
122 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 3 10.300 2.400 0.750 55.620 55.620
123 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 1 28.000 1.310 0.400 14.672 14.672
Abutment Cap 2
124 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 1 28.000 1.420 0.400 15.904 15.904
125 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Slab 1 60.000 28.000 0.275 462.000 462.000
126 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 12 20.000 1.000 0.150 36.000 36.000
127 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 12 20.000 0.650 0.750 117.000 117.000
128 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Gider At Mid Span 12 20.000 0.300 1.025 73.800 73.800
129 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 12 20.000 0.450 0.150 16.200 16.200
Gider At Mid Span Pile Balance
Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Th/Height Quantity Remark
Area/Width Quantity
130 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 12 20.000 0.600 0.250 36.000 36.000
131 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 12 20.000 1.000 0.150 36.000 36.000
132 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 Girder At Support 12 20.000 0.800 0.430 82.560 82.560
133 117+178 3x18+1x9 Major Bridge Reconstruction 3x21 12 20.000 0.600 1.457 209.808 209.808
Total Quantity
134 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Abutment 1 24 11.090 1.130 300.867
135 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pier 1 12 11.161 0.785 105.137
136 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pier 2 12 11.161 0.785 105.137 105.137
137 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Abutment 2 24 11.090 1.130 300.867 300.867
138 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pile Cap PCC A1 1 28.200 5.365 0.080 12.104 12.104
139 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pile Cap PCC P1 2 7.500 5.137 0.080 6.164 6.164
140 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pile Cap PCC P2 2 7.500 5.137 0.080 6.164 6.164
141 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pile Cap PCC A2 1 28.200 5.365 0.080 12.104 12.104
142 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pile Cap A1 1 28.000 5.137 1.800 258.904 258.904
143 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pile Cap P1 2 7.500 4.909 1.500 110.445 110.445
144 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pile Cap P2 2 7.500 4.909 1.500 110.445 110.445
145 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pile Cap A2 1 28.000 5.137 1.800 258.904 258.904
146 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Abutment 1 1 28.000 1.200 4.349 146.126 146.126
147 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pier 1 2 4.795 1.200 3.786 43.565 43.565
148 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Pier 2 2 4.795 1.200 3.786 43.565 43.565
149 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Abutment 2 1 28.000 1.200 4.349 146.126 146.126
150 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 1 28.000 1.310 0.400 14.672 14.672
Abutment Cap 1
151 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 1 28.000 1.420 0.400 15.904 15.904
152 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 2 7.250 2.740 0.750 29.795 29.795
Pier Cap 1
153 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 2 10.300 2.740 0.750 42.329 42.329
154 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 2 7.250 2.740 0.750 29.795 29.795
Pier Cap2
155 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 2 10.300 2.740 0.750 42.329 42.329
156 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 1 28.000 1.310 0.400 14.672 14.672
Abutment Cap 2
157 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 1 28.000 1.420 0.400 15.904 15.904
158 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Slab 1 57.863 28.000 0.275 445.545 445.545
159 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 12 19.288 1.000 0.150 34.718 34.718
160 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 12 19.288 0.650 0.750 112.835 112.835
161 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Gider At Mid Span 12 19.288 0.300 1.025 71.173 71.173
162 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 12 19.288 0.450 0.150 15.623 15.623
163 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 12 19.288 0.600 0.250 34.718 34.718
164 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 12 19.288 1.000 0.150 34.718 34.718
165 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew Girder At Support 12 19.288 0.800 0.430 79.621 79.621
166 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew 12 19.288 0.600 1.457 202.339 202.339
Total Quantity
167 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile A1 24 32.000 1.130 868.147
168 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile P1 12 31.000 0.785 292.020
169 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile P2 12 31.000 0.785 292.020 146.01
170 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile P3 12 31.000 0.785 292.020 292.020
171 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile A2 24 32.000 1.130 868.147 868.147
172 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap PCC A1 1 28.200 8.900 0.080 20.078 20.078
Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Pile Th/Height Quantity Balance Remark
Area/Width Quantity
173 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap PCC P1 2 8.900 5.300 0.080 7.547 7.547
174 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap PCC P2 2 8.900 5.300 0.080 7.547 7.547
175 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap PCC P3 2 8.900 5.300 0.080 7.547 7.547
176 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap PCC A2 1 28.200 8.900 0.080 20.078 20.078
177 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap A1 1 28.000 8.700 1.800 438.480 438.480
178 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap P1 2 8.700 5.100 1.800 159.732 159.732
179 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap P2 2 8.700 5.100 1.800 159.732 159.732
180 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap P3 2 8.700 5.100 1.800 159.732 159.732
181 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pile Cap A2 1 28.000 8.700 1.800 438.480 438.480
182 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Abutment 1 1 28.000 1.200 2.465 82.824 82.824
183 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pier 1 2 4.200 1.200 3.202 32.276 32.276
184 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pier 2 2 4.200 1.200 3.202 32.276 32.276
185 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Pier 3 2 4.200 1.200 3.202 32.276 32.276
186 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Abutment 2 1 28.000 1.200 2.465 82.824 82.824
187 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 1 28.000 1.310 0.400 14.672 14.672
Abutment Cap 1
188 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 1 28.000 1.420 0.400 15.904 15.904
189 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 2 7.250 2.400 0.750 26.100 26.100
Pier Cap 1
190 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 2 10.300 2.400 0.750 37.080 37.080
191 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 2 7.250 2.400 0.750 26.100 26.100
Pier Cap 2
192 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 2 10.300 2.400 0.750 37.080 37.080
193 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 2 7.250 2.400 0.750 26.100 26.100
Pier Cap 3
194 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 2 10.300 2.400 0.750 37.080 37.080
195 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 1 28.000 1.310 0.400 14.672 14.672
Abutment Cap 2
196 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 1 28.000 1.420 0.400 15.904 15.904
197 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Slab 1 68.000 28.000 0.275 523.600 523.600
198 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 12 17.000 1.000 0.150 30.600 30.600
199 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 12 17.000 0.650 0.750 99.450 99.450
200 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Gider At Mid Span 12 17.000 0.300 0.825 50.490 50.490
201 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 12 17.000 0.450 0.150 13.770 13.770
202 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 12 17.000 0.600 0.250 30.600 30.600
203 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 12 17.000 1.000 0.150 30.600 30.600
204 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 Girder At Support 12 17.000 0.800 0.430 70.176 70.176
205 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 12 17.000 0.600 1.257 153.857 153.857
Total Quantity
206 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile A1 20 32.660 1.130 738.377 369.189 LHS Complite
207 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P1 12 10.315 0.785 97.167 48.584 LHS Complite
208 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P2 12 11.932 0.785 112.399 56.200 LHS Complite
209 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P3 12 10.197 0.785 96.056 48.028 LHS Complite
210 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P4 12 10.197 0.785 96.056 48.028 LHS Complite
211 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P5 12 10.197 0.785 96.056 48.028 LHS Complite
212 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P6 12 10.197 0.785 96.056 48.028 LHS Complite
213 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P7 12 10.197 0.785 96.056 48.028 LHS Complite
214 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P8 12 14.072 0.785 132.558 66.279 LHS Complite
215 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P9 12 11.763 0.785 110.807 55.404 LHS Complite
216 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P10 12 10.934 0.785 102.998 51.499 LHS Complite
Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Pile Th/Height Quantity Balance Remark
Area/Width Quantity
217 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile P11 12 10.934 0.785 102.998 51.499 LHS Complite
218 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile A2 24 24.410 1.130 662.234 331.117 LHS Complite
219 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC A1 1 28.080 4.700 0.080 10.558 5.279 LHS Complite
220 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P1 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
221 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P2 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
222 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P3 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
223 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P4 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
224 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P5 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
225 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P6 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
226 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P7 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
227 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P8 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
228 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P9 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
229 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P10 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
230 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC P11 2 7.500 4.700 0.080 5.640 2.820 LHS Complite
231 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap PCC A2 1 28.080 4.700 0.080 10.558 5.279 LHS Complite
232 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap A1 1 27.880 4.500 1.800 225.828 112.914 LHS Complite
233 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P1 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
234 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P2 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
235 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P3 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
236 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P4 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
237 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P5 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
238 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P6 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
239 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P7 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
240 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P8 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
241 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P9 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
242 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P10 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
243 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap P11 2 7.300 4.500 1.500 98.550 49.275 LHS Complite
244 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pile Cap A2 1 27.880 4.500 1.800 225.828 112.914 LHS Complite
245 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Abutment 1 1 27.880 1.200 2.231 74.640 37.320 LHS Complite
246 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 1 2 4.200 1.200 2.760 27.821 13.910 LHS Complite
247 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 2 2 4.200 1.200 4.437 44.725 22.362 LHS Complite
248 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 3 2 4.200 1.200 5.718 57.637 28.819 LHS Complite
249 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 4 2 4.200 1.200 3.202 32.276 16.138 LHS Complite
250 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 5 2 4.200 1.200 3.202 32.276 16.138 LHS Complite
251 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 6 2 4.200 1.200 3.202 32.276 16.138 LHS Complite
252 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 7 2 4.200 1.200 3.202 32.276 16.138 LHS Complite
253 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 8 2 4.200 1.200 3.202 32.276 16.138 LHS Complite
254 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 9 2 4.200 1.200 3.202 32.276 16.138 LHS Complite
255 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 10 2 4.200 1.200 3.202 32.276 16.138 LHS Complite
256 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Pier 11 2 4.200 1.200 3.202 32.276 16.138 LHS Complite
257 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Abutment 2 1 27.880 1.200 2.998 100.301 50.151 LHS Complite
258 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 1 27.880 1.310 0.400 14.609 14.609
Abutment Cap 1
259 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 1 27.880 2.500 0.400 27.880 27.880
260 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 1
261 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Pile Th/Height Quantity Balance Remark
Area/Width Quantity
262 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 2
263 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
264 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 3
265 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
266 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 4
267 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
268 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 5
269 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
270 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 6
271 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
272 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 7
273 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
274 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 8
275 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
276 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 9
277 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
278 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 10
279 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
280 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 7.250 2.700 0.750 29.363 29.363
Pier Cap 11
281 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 2 10.300 2.700 0.750 41.715 41.715
282 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 1 27.880 1.310 0.400 14.609 14.609
Abutment Cap 2
283 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 1 27.880 7.500 0.400 83.640 83.640
284 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Slab 1 255.930 27.880 0.250 1783.832 1783.832
285 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 8 24.950 1.000 0.150 29.940 29.940
286 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 8 24.950 0.650 0.750 97.305 97.305
287 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Gider At Mid Span 8 24.950 0.300 15.750 943.110 943.110
288 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 8 24.950 0.450 0.150 13.473 13.473
289 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 8 24.950 0.600 0.250 29.940 29.940
290 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 8 24.950 1.000 0.150 29.940 29.940
291 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Girder At Support 8 24.950 0.800 0.430 68.662 68.662
292 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 8 24.950 0.600 2.007 240.358 240.358
293 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 44 18.730 1.000 0.150 123.618 123.618
294 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 44 18.730 0.650 0.750 401.759 401.759
295 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Gider At Mid Span 44 18.730 0.300 1.025 253.417 253.417
296 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 44 18.730 0.450 0.150 55.628 55.628
297 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 44 18.730 0.600 0.250 123.618 123.618
298 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 44 18.730 1.000 0.150 123.618 123.618
299 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 Girder At Support 44 18.730 0.800 0.430 283.497 283.497
300 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 44 18.730 0.600 1.457 720.446 720.446
Total Quantity
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF GUJRAT

Current status of Girder Type Structure


Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Pile Area Qty

Pile A1 12 18.515 1.1304 251.152

Pile P1 6 14.811 0.785 69.760

1 101+841 13x6.0 Major Bridge New Construction 2x24 + 1x18 + 1x12 Pile P2 6 16.269 0.785 76.627

Pile P3 6 13.627 0.785 64.183

Pile A2 12 13.662 1.1304 185.322

A1 24 24.394 1.1304 661.799

P1 12 28.000 0.785 263.760

P2 12 28.000 0.785 263.760


2 114+048 4x24.4+1x12.2 Major Bridge New Construction 5x 21.96
P3 12 28.000 0.785 263.760

P4 12 28.000 0.785 263.760

A2 24 24.009 1.1304 651.355

A1 24 21.200 1.1304 575.148

P1 12 27.200 0.785 256.224


3 117+178 3x18+1x9 Major Bridge Reconstruction 3x21
P2 12 27.200 0.785 256.224

A2 24 21.200 1.1304 575.148

A1 24 11.090 1.1304 300.867

P1 12 11.161 0.785 105.137


4 120+726 2x18+1x9 Major Bridge Reconstruction 3x21 Skew
P2 12 11.161 0.785 105.137

A2 24 11.090 1.1304 300.867

A1 24 32.000 1.1304 868.147

P1 12 31.000 0.785 292.020

5 124+657 4x18.0 Major Bridge Reconstruction 4x18.0 P2 12 31.000 0.785 292.020

P3 12 31.000 0.785 292.020

A2 24 32.000 1.1304 868.147

A1

6 125+285 2x18+1x9 Minor Bridge New Construction 2x22.5 P1

A2

31 of 32
FOUR LANING OF MAHUVA-KAGAVADAR SECTION OF NH-51 FROM Km 100+100 TO Km 139+915 (DESIGN CHAINAGE FROM KM 100+450 TO KM 140+541) PACKAGE-III IN THE STATE OF GUJRAT

Current status of Girder Type Structure


Sr. No. Chainage Span (P&P) Structure Type Type of Construction Span (GAD Pier Nos. Pile Length Pile Area Qty

A1

P1
7 127+703 7x7.6 Minor Bridge New Construction 3x17.75
P2

A2

A1
8 131+705 1x51.4 ROB New Construction 1x51.4
A2

A1 20 32.660 1.1304 738.377

P1 12 10.315 0.785 97.167

P2 12 11.932 0.785 112.399

P3 12 10.197 0.785 96.056

P4 12 10.197 0.785 96.056

P5 12 10.197 0.785 96.056

9 135+386 2x26+10x20 Major Bridge New Construction 2x26+10x20 P6 12 10.197 0.785 96.056

P7 12 10.197 0.785 96.056

P8 12 14.072 0.785 132.558

P9 12 11.763 0.785 110.807

P10 12 10.934 0.785 102.998

P11 12 10.934 0.785 102.998

A2 24 24.410 1.1304 662.234

32 of 32