BESI BETON (POLOS) / MILD STEEL ROUND BARS

Diameter (mm) Panjang/batang (m) Berat/batang (kg) Berat/meter (kg)


6 12 2.66 0.222
6.5 12 3.2 0.267
8 12 4.74 0.395
9 12 6 0.500
10 12 7.4 0.617
12 12 10.7 0.892
13 12 12.5 1.042
14 12 14.5 1.208
16 12 19 1.583
19 12 26.7 2.225
22 12 35.8 2.983
23 12 39.1 3.258
25 12 46.2 3.850
28 12 58 4.833
31 12 71.1 5.925
32 12 75.77 6.314

1a 3
1b 0
2 0
3 6
4 0
5 0
6 0
7 3
8 3
9 0
10 0
11 0
12 0
BESI BETON (SPIRAL) / DEFORMED BARS

Diameter (mm) Panjang/batang (m) Berat/batang (kg) Berat/meter (kg)


6 12 2.99 0.249
10 12 6.72 0.560
13 12 11.9 0.992
16 12 18.7 1.558
19 12 27 2.250
22 12 36.5 3.042
25 12 47.8 3.983
29 12 60.5 5.042
32 12 74.8 6.233
35 12 90.1 7.508
38 12 107 8.917
41 12 126 10.500
TOWER T.01 A
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 166.464 (5.1*5.1*1.6)*4
b Galian Tie Beam m3 10.24 (((0.4*1.6*4)*4))
c Urugan Pad m 4
49.62 166.46-20.81-10.4-83.23-(4-1.6)
d Urugan Beam m 3
3.84 10.24-1.28-0.64-4.48
e Pengeboran m' 140.00 ((7*5)*4) Quantity For 1 leg

Jumlah Ø Besi Unit Wight Panjang


No. Berat Besi (kg)
2 Beton Batang (mm) (kg/m') Potongan (m)

a Urugan Koral Pad (20cm) m3 20.8080 ((5.1*5.1*0.2)*4) 1) 52 D19 2.25 5.1 596.7
b Urugan Koral Beam (20cm) m3 1.28 ((0.4*0.2*4)*4) 2) 52 D19 2.25 6.3 737.1
c Beton 1:3:5, leveling Pad (10cm) m3 10.4040 ((5.1*5.1*0.1)*4) 3) 14 D19 2.25 6 189
d Beton 1:3:5, leveling Beam (10cm) m3 0.64 ((0.4*0.1*4)*4) 6) 36 D19 2.25 1.8 145.8
c Beton K-225 (Pad) m3 83.23 (0.8*5.1*5.1)*4 7) 5 Ø10 0.6167 3.4 10.4839
d Beton K-225 (Chimney) m3 4.00 (1*1*1)*4 8) 4 Ø10 0.6167 0.9 2.22012
e Beton K-225 (Slope/Beam) m3 4.48 ((0.4*0.7*4)*4) 9) 5 D19 2.25 1.45 16.3125
f Beton K-175 (Bore Pile) m3 65.97 ((1/4*π*0.6*7)*5)*4 10) 20 Ø10 0.6167 1.6 19.7344
g Besi beton kg 6869.40 TOTAL VOLUME (kg) 1717.35092
h Bekesting Pad m 2
65.28 ((4*5.1*0.8)*4) 10) 40 D19 2.25 Variable Variable
i Bekesting Tie Beam m2 22.40 (((2*0.7*4)*4)) 11) Variable Ø10 0.6167 Variable Variable
j Bekesting Chimney m 2
16.00 (4*1*1)*4
k Pre-cast block (20 x 20 x 10)cm bh 4.00
TOWER T.01 B
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 166.464 (5.1*5.1*1.6)*4
b Galian Tie Beam m3 10.24 (((0.4*1.6*4)*4))
c Urugan Pad m 4
49.62 166.46-20.81-10.4-83.23-(4-1.6)
d Urugan Beam m 3
3.84 10.24-1.28-0.64-4.48
e Pengeboran m' 140.00 ((7*5)*4) Quantity For 1 leg

Jumlah Ø Besi Unit Wight Panjang


No. Berat Besi (kg)
2 Beton Batang (mm) (kg/m') Potongan (m)

a Urugan Koral Pad (20cm) m3 20.8080 ((5.1*5.1*0.2)*4) 1) 52 D19 2.25 5.1 596.7
b Urugan Koral Beam (20cm) m3 1.28 ((0.4*0.2*4)*4) 2) 52 D19 2.25 6.3 737.1
c Beton 1:3:5, leveling Pad (10cm) m3 10.4040 ((5.1*5.1*0.1)*4) 3) 14 D19 2.25 6 189
d Beton 1:3:5, leveling Beam (10cm) m3 0.64 ((0.5*0.1*4.6)*4) 6) 36 D19 2.25 1.8 145.8
c Beton K-225 (Pad) m3 83.23 (0.8*5.1*5.1)*4 7) 5 Ø10 0.6167 3.4 10.4839
d Beton K-225 (Chimney) m3 4.00 (1*1*1)*4 8) 4 Ø10 0.6167 0.9 2.22012
e Beton K-225 (Slope/Beam) m3 4.48 ((0.4*0.7*4)*4) 9) 5 D19 2.25 1.45 16.3125
f Beton K-175 (Bore Pile) m3 65.97 ((1/4*π*0.6*7)*5)*4 10) 20 Ø10 0.6167 1.8 22.2012
g Besi beton kg 6879.27 TOTAL VOLUME (kg) 1719.81772
h Bekesting Pad m 2
65.28 ((4*5.1*0.8)*4) 10) 40 D19 2.25 Variable Variable
i Bekesting Tie Beam m2 22.40 (((2*0.7*4)*4)) 11) Variable Ø10 0.6167 Variable Variable
j Bekesting Chimney m 2
16.00 (4*1*1)*4
k Pre-cast block (20 x 20 x 10)cm bh 4.00
TOWER T.02
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 166.464 (5.1*5.1*1.6)*4
b Galian Tie Beam m3 8.96 (((0.4*1.6*3.5)*4))
c Urugan Pad m 4
49.62 166.46-20.81-10.4-83.23-(4-1.6)
d Urugan Beam m 3
2.80 8.96-1.12-0.56-4.48
e Pengeboran m' 412.80 ((17.2*6)*4) Quantity For 1 leg

Jumlah Ø Besi Unit Wight Panjang


No. Berat Besi (kg)
2 Beton Batang (mm) (kg/m') Potongan (m)

a Urugan Koral Pad (20cm) m3 20.8080 ((5.1*5.1*0.2)*4) 1) 52 D19 2.25 5.1 596.7
b Urugan Koral Beam (20cm) m3 1.12 ((0.4*0.2*3.5)*4) 2) 52 D19 2.25 6.3 737.1
c Beton 1:3:5, leveling Pad (10cm) m3 10.4040 ((5.1*5.1*0.1)*4) 3) 14 D19 2.25 5.5 173.25
d Beton 1:3:5, leveling Beam (10cm) m3 0.56 ((0.4*0.1*3.5)*4) 6) 36 D19 2.25 1.8 145.8
c Beton K-225 (Pad) m3 83.23 (0.8*5.1*5.1)*4 7) 5 Ø10 0.6167 3.4 10.4839
d Beton K-225 (Chimney) m3 4.00 (1*1*1)*4 8) 4 Ø10 0.6167 0.9 2.22012
e Beton K-225 (Slope/Beam) m3 4.48 ((0.4*0.7*4)*4) 9) 5 D19 2.25 1.45 16.3125
f Beton K-175 (Bore Pile) m3 194.53 ((1/4*π*0.6*17.2)*6)*4 10) 20 Ø10 0.6167 1.8 22.2012
g Besi beton kg 6816.27 TOTAL VOLUME (kg) 1704.06772
h Bekesting Pad m 2
65.28 ((4*5.1*0.8)*4) 10) 40 D19 2.25 Variable Variable
i Bekesting Tie Beam m2 19.60 (((2*0.7*3.5)*4)) 11) Variable Ø10 0.6167 Variable Variable
j Bekesting Chimney m 2
16.00 (4*1*1)*4
k Pre-cast block (20 x 20 x 10)cm bh 4.00
TOWER T.03
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 156.060 (5.1*5.1*1.5)*4
b Galian Tie Beam m3 8.40 (((0.4*1.5*3.5)*4))
c Urugan Pad m 4
49.62 156.060-20.81-10.4-72.83-(4-1.6)
d Urugan Beam m 3
3.36 8.4-1.12-0.56-3.36
e Pengeboran m' 292.80 ((18.3*5)*4) Quantity For 1 leg

Jumlah Ø Besi Unit Wight Panjang


No. Berat Besi (kg)
2 Beton Batang (mm) (kg/m') Potongan (m)

a Urugan Koral Pad (20cm) m3 20.8080 ((5.1*5.1*0.2)*4) 1) 52 D19 2.25 5.1 596.7
b Urugan Koral Beam (20cm) m3 1.12 ((0.4*0.2*3.5)*4) 2) 52 D19 2.25 6.1 713.7
c Beton 1:3:5, leveling Pad (10cm) m3 10.4040 ((5.1*5.1*0.1)*4) 3) 14 D19 2.25 5.5 173.25
d Beton 1:3:5, leveling Beam (10cm) m3 0.56 ((0.4*0.1*3.5)*4) 6) 36 D19 2.25 1.7 137.7
c Beton K-225 (Pad) m3 72.83 (0.7*5.1*5.1)*4 7) 5 Ø10 0.6167 2.6 8.0171
d Beton K-225 (Chimney) m3 4.00 (1*1*1)*4 8) 4 Ø10 0.6167 0.7 1.72676
e Beton K-225 (Slope/Beam) m3 3.36 ((0.4*0.6*3.5)*4) 9) 5 D19 2.25 1.25 14.0625
f Beton K-175 (Bore Pile) m3 137.98 ((1/4*π*0.6*18.3)*5)*4 10) 20 Ø10 0.6167 1.8 22.2012
g Besi beton kg 6669.43 TOTAL VOLUME (kg) 1667.35756
h Bekesting Pad m 2
57.12 ((4*5.1*0.7)*4) 10) 40 D19 2.25 Variable Variable
i Bekesting Tie Beam m2 16.80 (((2*0.6*3.5)*4)) 11) Variable Ø10 0.6167 Variable Variable
j Bekesting Chimney m 2
16.00 (4*1*1)*4
k Pre-cast block (20 x 20 x 10)cm bh 4.00
TOWER T.02
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 166.464 (5.1*5.1*1.6)*4
b Galian Tie Beam m3 8.96 (((0.4*1.6*3.5)*4))
c Urugan Pad m 4
49.62 166.46-20.81-10.4-83.23-(4-1.6)
d Urugan Beam m 3
2.80 8.96-1.12-0.56-4.48
e Pengeboran m' 412.80 ((17.2*6)*4) Quantity For 1 leg

Jumlah Ø Besi Unit Wight Panjang


No. Berat Besi (kg)
2 Beton Batang (mm) (kg/m') Potongan (m)

a Urugan Koral Pad (20cm) m3 20.8080 ((5.1*5.1*0.2)*4) 1) 52 D19 2.25 5.1 596.7
b Urugan Koral Beam (20cm) m3 1.12 ((0.4*0.2*3.5)*4) 2) 52 D19 2.25 6.3 737.1
c Beton 1:3:5, leveling Pad (10cm) m3 10.4040 ((5.1*5.1*0.1)*4) 3) 14 D19 2.25 5.5 173.25
d Beton 1:3:5, leveling Beam (10cm) m3 0.56 ((0.4*0.1*3.5)*4) 6) 36 D19 2.25 1.8 145.8
c Beton K-225 (Pad) m3 83.23 (0.8*5.1*5.1)*4 7) 5 Ø10 0.6167 3.4 10.4839
d Beton K-225 (Chimney) m3 4.00 (1*1*1)*4 8) 4 Ø10 0.6167 0.9 2.22012
e Beton K-225 (Slope/Beam) m3 4.48 ((0.4*0.7*4)*4) 9) 5 D19 2.25 1.45 16.3125
f Beton K-175 (Bore Pile) m3 194.53 ((1/4*π*0.6*17.2)*6)*4 10) 20 Ø10 0.6167 1.8 22.2012
g Besi beton kg 6816.27 TOTAL VOLUME (kg) 1704.06772
h Bekesting Pad m 2
65.28 ((4*5.1*0.8)*4) 10) 40 D19 2.25 Variable Variable
i Bekesting Tie Beam m2 19.60 (((2*0.7*3.5)*4)) 11) Variable Ø10 0.6167 Variable Variable
j Bekesting Chimney m 2
16.00 (4*1*1)*4
k Pre-cast block (20 x 20 x 10)cm bh 4.00
TOWER 3 Pre - Concrete
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 124.85 (5.1*5.1*1.2)*4
b Galian Tie Beam m3 3.92 (0.4*0.7*3.5)*4
b Urugan kembali m 3
20.58 (124.85+3.92)-(10.40+0.56+93.64+3.58)
c Pengeboran m' 288.00 ((18.3*4)*4)

2 Beton
a Urugan Koral Pad (20cm) m3 20.81 (5.1*5.1*0.2)*4
b Urugan Koral Beam (20cm) m3 1.12 (0.4*3.5*0.2)*4
c Beton 1:3:5, leveling Pad (10cm) m3 10.40 (5.1*5.1*0.1)*4
d Beton 1:3:5, leveling Beam (10cm) m3 0.56 (0.4*3.5*0.1)*4
c Beton K-225 (Pad) m3 93.64 (5.1*5.1*0.9)*4 Jumlah Ø Besi Unit Wight Panjang
No. Berat Besi (kg)
d Beton K-225 (Chimney) m3 2.00 (1*1*0.5)*4 Batang (mm) (kg/m') Potongan (m)

e Beton K-225 (Slope/Beam) m3 3.58 (0.4*0.7*3.2)*4 1) 52 D19 2.25 5.1 596.7


f Beton K-175 (Bore Pile) m3 135.72 ((1/4*π*0.6*18.2)*4)*4 3) 52 D19 2.25 6.5 760.5
g Besi beton kg 6370.55 4) 14 D19 2.25 3.7 116.55
h Bekesting Pad m2 57.12 (4*0.7*5.1)*4 5) 20 D19 2.25 1.6 72
i Bekesting Tie Beam m2 19.60 (2*0.7*3.5)*4 6) 8 Ø10 0.6167 2.6 12.82736
j Bekesting Chimney m 2
12.80 (4*0.9*1)*4 7) 4 Ø10 0.6167 0.7 1.72676
k Pre-cast block (20 x 20 x 10)cm bh 4.00 8) 4 D19 2.25 1.4 12.6
9) 20 Ø10 0.6167 1.6 19.7344
3 Lain-Lain TOTAL VOLUME (kg) 1592.63852
a Pembuatan dan Pemasangan Patok Beton Batas Tanah bh x 10) 40 D19 2.25 Variable Variable
b Transport Material Pondasi ke Lokasi Tower kg x 11) Variable Ø10 0.6167 Variable Variable
c Tes Kubus Beton (15 x 15 x 15)cm3 bh x
d Penyetelan stub (besi kaki) tower kg x
e Pemasangan grounding dan perlengkapannya set x
f Pengujian grounding dan perlengkapannya set x
TOWER 3 Pre - Concrete
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 124.85 (5.1*5.1*1.2)*4
b Galian Tie Beam m3 3.92 (0.4*0.7*3.5)*4
b Urugan kembali m 3
20.58
c Pengeboran m' 292.80 ((18.3*4)*4)

2 Beton
a Urugan Koral Pad (20cm) m3 20.81 (5.1*5.1*0.2)*4
b Urugan Koral Beam (20cm) m3 1.12 (0.4*3.5*0.2)*4
c Beton 1:3:5, leveling Pad (10cm) m3 10.40 (5.1*5.1*0.1)*4
d Beton 1:3:5, leveling Beam (10cm) m3 0.56 (0.4*3.5*0.1)*4
c Beton K-225 (Pad) m3 93.64 (5.1*5.1*0.9)*4 Jumlah Ø Besi Unit Wight Panjang
No. Berat Besi (kg)
d Beton K-225 (Chimney) m3 2.00 (1*1*0.5)*4 Batang (mm) (kg/m') Potongan (m)

e Beton K-225 (Slope/Beam) m3 3.58 (0.4*0.7*3.2)*4 1) 52 D19 2.25 5.1 596.7


f Beton K-175 (Bore Pile) m3 137.22 ((1/4*π*0.6*18.2)*4)*4 3) 52 D19 2.25 6.5 760.5
g Besi beton kg 6370.55 4) 14 D19 2.25 3.7 116.55
h Bekesting Pad m2 57.12 (4*0.7*5.1)*4 5) 20 D19 2.25 1.6 72
i Bekesting Tie Beam m2 19.60 (2*0.7*3.5)*4 6) 8 Ø10 0.6167 2.6 12.82736
j Bekesting Chimney m 2
12.80 (4*0.9*1)*4 7) 4 Ø10 0.6167 0.7 1.72676
k Pre-cast block (20 x 20 x 10)cm bh 4.00 8) 4 D19 2.25 1.4 12.6
9) 20 Ø10 0.6167 1.6 19.7344
3 Lain-Lain TOTAL VOLUME (kg) 1592.63852
a Pembuatan dan Pemasangan Patok Beton Batas Tanah bh x 10) 40 D19 2.25 Variable Variable
b Transport Material Pondasi ke Lokasi Tower kg x 11) Variable Ø10 0.6167 Variable Variable
c Tes Kubus Beton (15 x 15 x 15)cm3 bh x
d Penyetelan stub (besi kaki) tower kg x
e Pemasangan grounding dan perlengkapannya set x
f Pengujian grounding dan perlengkapannya set x
TOWER 1A Pre - Concrete
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 135.25 (5.1*5.1*1.3)*4
b Galian Tie Beam m3 4.48 (0.4*0.8*3.5)*4
b Urugan kembali m 3
x (((5.1*5.1*0.5)*4)+((0.5*4*0.9)*4))
c Pengeboran m' 140.00 ((7*5)*4)
90.4000
2 Beton
a Urugan Koral Pad (20cm) m3 20.81 (5.1*5.1*0.2)*4
b Urugan Koral Beam (20cm) m3 1.12 (0.4*3.5*0.2)*4
c Beton 1:3:5, leveling Pad (20cm) m3 20.81 (5.1*5.1*0.2)*4
d Beton 1:3:5, leveling Beam (20cm) m3 0.96 (0.4*3.5*0.2)*4
c Beton K-225 (Pad) m3 62.42 (5.1*5.1*0.6)*4 Ø Besi Unit Wight Panjang
No. Jumlah Batang Berat Besi (kg)
d Beton K-225 (Chimney) m3 3.33 (0.8*0.8*1.3)*4 (mm) (kg/m') Potongan (m)

e Beton K-225 (Slope/Beam) m3 2.88 (0.4*0.6*3)*4 1) 52 D19 2.25 5.1 596.7


f Beton K-175 (Bore Pile) m3 65.97 ((1/4*π*0.6*7)*5)*4 3) 52 D19 2.25 6.3 737.1
g Besi beton kg 6339.72 4) 14 D19 2.25 4 126
h Bekesting Pad m2 57.12 (4*0.7*5.1)*4 5) 20 D19 2.25 1.6 72
i Bekesting Tie Beam m 2
19.60 (2*0.7*3.5)*4 6) 8 Ø10 0.6167 3.4 16.77424
j Bekesting Chimney m 2
12.80 (4*0.9*1)*4 7) 4 Ø10 0.6167 0.9 2.22012
k Pre-cast block (20 x 20 x 10)cm bh 4.00 8) 4 D19 2.25 1.6 14.4
9) 20 Ø10 0.6167 1.6 19.7344
3 Lain-Lain TOTAL VOLUME (kg) 1584.92876
a Pembuatan dan Pemasangan Patok Beton Batas Tanah bh x 10) 40 D19 2.25 Variable Variable
b Transport Material Pondasi ke Lokasi Tower kg 396685.18 (4.05x1650) + (2.03x2300) + ((14.58+21.91)x2400) + 4723.59 11) Variable Ø10 0.6167 Variable Variable
c Tes Kubus Beton (15 x 15 x 15)cm3 bh x
d Penyetelan stub (besi kaki) tower kg x
e Pemasangan grounding dan perlengkapannya set x
f Pengujian grounding dan perlengkapannya set x
TOWER 1A Pre - Concrete
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 135.25 (5.1*5.1*1.3)*4
b Galian Tie Beam m3 4.48 (0.4*0.8*3.5)*4
b Urugan kembali m 3
x (((5.1*5.1*0.5)*4)+((0.5*4*0.9)*4))
c Pengeboran m' 140.00 ((7*5)*4)
89.12
2 Beton
a Urugan Koral Pad (20cm) m3 20.81 (5.1*5.1*0.2)*4
b Urugan Koral Beam (20cm) m3 1.12 (0.4*3.5*0.2)*4
c Beton 1:3:5, leveling Pad (20cm) m3 20.81 (5.1*5.1*0.2)*4
d Beton 1:3:5, leveling Beam (20cm) m3 0.64 (0.4*3.5*0.2)*4
c Beton K-225 (Pad) m3 62.42 (5.1*5.1*0.7)*4 Ø Besi Unit Wight Panjang
No. Jumlah Batang Berat Besi (kg)
d Beton K-225 (Chimney) m3 3.33 (0.8*0.8*1)*4 (mm) (kg/m') Potongan (m)

e Beton K-225 (Slope/Beam) m3 1.92 (0.4*0.7*3.5)*4 1) 52 D19 2.25 5.1 596.7


f Beton K-175 (Bore Pile) m3 65.97 ((1/4*π*0.6*7)*5)*4 3) 52 D19 2.25 6.3 737.1
g Besi beton kg 6339.72 4) 14 D19 2.25 4 126
h Bekesting Pad m2 57.12 (4*0.7*5.1)*4 5) 20 D19 2.25 1.6 72
i Bekesting Tie Beam m 2
19.60 (2*0.7*3.5)*4 6) 8 Ø10 0.6167 3.4 16.77424
j Bekesting Chimney m 2
12.80 (4*0.9*1)*4 7) 4 Ø10 0.6167 0.9 2.22012
k Pre-cast block (20 x 20 x 10)cm bh 4.00 8) 4 D19 2.25 1.6 14.4
9) 20 Ø10 0.6167 1.6 19.7344
3 Lain-Lain TOTAL VOLUME (kg) 1584.92876
a Pembuatan dan Pemasangan Patok Beton Batas Tanah bh x 10) 40 D19 2.25 Variable Variable
b Transport Material Pondasi ke Lokasi Tower kg 396685.18 (4.05x1650) + (2.03x2300) + ((14.58+21.91)x2400) + 4723.59 11) Variable Ø10 0.6167 Variable Variable
c Tes Kubus Beton (15 x 15 x 15)cm3 bh x
d Penyetelan stub (besi kaki) tower kg x
e Pemasangan grounding dan perlengkapannya set x
f Pengujian grounding dan perlengkapannya set x
TOWER 1A Pre - Concrete
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 135.25 (5.1*5.1*1.3)*4
b Galian Tie Beam m3 4.48 (0.4*0.8*3.5)*4
b Urugan kembali m 3
x (((5.1*5.1*0.5)*4)+((0.5*4*0.9)*4))
c Pengeboran m' 140.00 ((7*5)*4)
102.12
2 Beton
a Urugan Koral Pad (20cm) m3 20.81 (5.1*5.1*0.2)*4
b Urugan Koral Beam (20cm) m3 1.12 (0.4*3.5*0.2)*4
c Beton 1:3:5, leveling Pad (20cm) m3 20.81 (5.1*5.1*0.2)*4
d Beton 1:3:5, leveling Beam (20cm) m3 1.12 (0.4*3.5*0.2)*4
c Beton K-225 (Pad) m3 72.83 (5.1*5.1*0.7)*4 Jumlah Ø Besi Unit Wight Panjang
No. Berat Besi (kg)
d Beton K-225 (Chimney) m3 3.33 (0.8*0.8*1)*4 Batang (mm) (kg/m') Potongan (m)

e Beton K-225 (Slope/Beam) m3 4.03 (0.4*0.7*3.5)*4 1) 52 D19 2.25 5.1 596.7


f Beton K-175 (Bore Pile) m3 65.97 ((1/4*π*0.6*7)*5)*4 3) 52 D19 2.25 6.3 737.1
g Besi beton kg 6339.72 4) 14 D19 2.25 4 126
h Bekesting Pad m2 57.12 (4*0.7*5.1)*4 5) 20 D19 2.25 1.6 72
i Bekesting Tie Beam m 2
19.60 (2*0.7*3.5)*4 6) 8 Ø10 0.6167 3.4 16.77424
j Bekesting Chimney m 2
12.80 (4*0.9*1)*4 7) 4 Ø10 0.6167 0.9 2.22012
k Pre-cast block (20 x 20 x 10)cm bh 4.00 8) 4 D19 2.25 1.6 14.4
9) 20 Ø10 0.6167 1.6 19.7344
3 Lain-Lain TOTAL VOLUME (kg) 1584.92876
a Pembuatan dan Pemasangan Patok Beton Batas Tanah bh x 10) 40 D19 2.25 Variable Variable
b Transport Material Pondasi ke Lokasi Tower kg 421654.78 (4.05x1650) + (2.03x2300) + ((14.58+21.91)x2400) + 4723.59 11) Variable Ø10 0.6167 Variable Variable
c Tes Kubus Beton (15 x 15 x 15)cm3 bh x
d Penyetelan stub (besi kaki) tower kg x
e Pemasangan grounding dan perlengkapannya set x
f Pengujian grounding dan perlengkapannya set x
Tabel Kebutuhan Besi Percepatan T12

Panjang
Jumlah Unit Wight
No. Ø Besi (mm) Potongan Berat Besi (kg) Ket Waste
Batang (kg/m')
(m)
1) 80 D19 2.25 6 1080 Pad Atas 40 x x x 0
2) 80 D19 2.25 7 1314 Pad Bawah 80 x x x 80 @ 5 m
3) 208 D19 2.25 1.6 748.8 Pad Atas 0 69 @ 5 m 1@ 5m x 69 @ 0.2 m + 1 @ 3.4 m

4) 208 D19 2.25 2.8 1310 Pad Bawah 50 1 @ 3.4 m 10 @ 5 m x 49 @ 0.8m + 1 @11.2 m +1 @ 0.6m + 10 @ 2.2 m

5) 144 D19 2.25 2 648 Pad Bawah 22 5 @ 11.2 m 10 @ 2.2 m x 1 @ 6 m + 1 @ 1.2 m + 10 @ 0.2 m
6) 32 Ø10 0.6167 2.6 51.3 Pad Bawah 8 x x x 8 @ 1.6 m
192 D19
TOTAL VOLUME (kg) 5152.5094 x x
8 Ø10
TOWER 12 Ready Mix
No. Pekerjaan Satuan Volume 4 Leg Keterangan
1 Ready Mix
a Beton K-225 (Pad) m3 170.89 Ready Mix
b Beton K-225 (Chimney) m3 3.60 Ready Mix

2 Site Mix
a Semen
b Pasir 119.62
2.52 3875.265 3.875265
10.51237517416
16075.265 16.075265
180.8899013742
170.3775262
85444329.3893 0.5111325786
170.8886587786
24.4126655398
TOWER 1A 4DRD+0
No. Pekerjaan Satuan Volume 1 Leg Volume 4 Leg Formula Ket
1 Tanah
a Galian m3 27.06 108.22 (5.1*6*0.8)+(4.6*0.7*0.8)
b Urugan kembali m3 12.64 50.56 (28.62-15.98)
c Pengeboran m' 70.00 280.00 (14*5)

2 Beton
a Urugan koral (20cm) m3 6.12 24.48 (0.2*5.1*6)
b Beton 1:3:5, leveling (10cm) m3 3.06 12.24 (0.1*5.1*6)
c Beton K-225 (Pad) m3 24.48 97.92 (0.7*5.1*6) Ready Mix Aktual
e Beton K-225 (Slope/Beam) m3 1.65 6.14 ((0.5*0.7*4.7)x3)+(0.5*0.65*3.7) lapangan 99 m3

d Beton K-225 (Chimney) m4 24.88 99.52 (0.7*4.5*4.5)+(0.5*0.5*1.6)


f Beton K-175 (Bore Pile) m3 32.99 131.95 ((1/4*π*0.6*14)*5)
g Besi beton kg 628.77 2515.07
h Cetakan m2 3.20 12.80 (4*0.5*1.6)
i Pre-cast block (20 x 20 x 10)cm bh 1.00 4.00

3 Lain-Lain
a Bekesting Pad m2 x
b Bekesting Tie Beam m2 155684.90 622739.61 (4.05x1650) + (2.03x2300) + ((14.58+21.91)x2400) + 4723.59
c Bekesting Chimney m2 x
d Penyetelan stub (besi kaki) tower kg x
e Pemasangan grounding dan perlengkapannya set x
f Pengujian grounding dan perlengkapannya set x
Jumlah Ø Besi Unit Wight Panjang
No. Berat Besi (kg)
Batang (mm) (kg/m') Potongan (m)

1) 52 D19 2.25 5.1 596.7


2) 20 Ø10 0.6167 2.6 32.0684
TOTAL VOLUME (kg) 628.7684
628768.4
TOWER 10 4BB +0
No. Pekerjaan Satuan Volume 1 Leg Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 36.30 145.20 (5.5*5.5*1.2)
b Galian Tie Beam m3 1.47 5.88 (0.6*0.7*3.5)
b Urugan kembali m 3
x 54.94 (((5.1*5.1*0.5)*4)+((0.5*3.5*0.9)*4))
c Pengeboran m' 70.00 280.00 (14*5)

2 Beton
a Urugan pasir Pad (20cm) m3 5.20 20.81 (0.2*4.5*4.5)
b Urugan pasir Tie Beam (20cm) m3 0.28 1.12 (0.2*0.4*3.5)
c Beton 1:3:5, leveling (10cm) m3 2.74 10.96 (0.1*5.1*5.1)+(0.1*0.4*3.5)
d Beton K-225 (Pad) m3 20.81 83.23 (0.8*5.1*5.1)
e Beton K-225 (Chimney) m3 0.58 2.30 (0.8*0.8*0.9)
f Beton K-225 (Slope/Beam) m3 1.12 4.48 (0.4*0.8*3.5) Jumlah Ø Besi Unit Wight Panjang
No. Berat Besi (kg)
g Beton K-175 (Bore Pile) m3 32.99 131.95 ((1/4*π*0.6*14)*5) Batang (mm) (kg/m') Potongan (m)

h Besi beton kg 1573.29 6293.15 1) 52 D19 2.25 5.1 596.7


i Bekesting Pad m2 16.32 65.28 (4*5.1*0.8) 2) 52 D19 2.25 6.2 725.4
j Bekesting Tie Beam m2 5.60 22.40 (2*0.8*3.5) 3) 14 D19 2.25 4 126
k Bekesting Chimney m 2
3.20 12.80 (4*0.8*1) 4) 20 D19 2.25 1.7 76.5
l Pre-cast block (20 x 20 x 10)cm bh 1.00 4.00 5) 8 Ø10 0.6167 2.6 12.82736
6) 4 Ø10 0.6167 0.7 1.72676
3 Lain-Lain 7) 4 D19 2.25 1.6 14.4
a Pembuatan dan Pemasangan Patok Beton Batas Tanah bh x 8) 20 Ø10 0.6167 1.6 19.7344
b Transport Material Pondasi ke Lokasi Tower kg 145568.22 582272.89 (4.05x1650) + (2.03x2300) + ((14.58+21.91)x2400) + 4723.59 TOTAL VOLUME (kg) 1573.28852
c Tes Kubus Beton (15 x 15 x 15)cm3 bh x 9) 40 D19 2.25 Variable Variable
d Penyetelan stub (besi kaki) tower kg x 10) Variable Ø10 0.6167 Variable Variable
e Pemasangan grounding dan perlengkapannya set x
f Pengujian grounding dan perlengkapannya set x
TOWER 10 4BB +0
No. Pekerjaan Satuan Volume 1 Leg Volume 4 Leg Keterangan
1 Tanah
a Galian Pad m3 48.40 193.60 (5.5*5.5*1.6)
b Galian Tie Beam m3 1.68 6.72 (0.6*0.8*3.5)
b Urugan kembali m 3
x 54.94 (((5.1*5.1*0.5)*4)-((0.8*0.8*0.5)*4))+((0.6*3.5*0.5)*4)
c Pengeboran m' 70.00 280.00 (14*5)

2 Beton
a Urugan pasir Pad (20cm) m3 5.20 20.81 (0.2*5.1*5.1)
b Urugan pasir Tie Beam (20cm) m3 0.28 1.12 (0.2*0.4*3.5)
c Beton 1:3:5, leveling (10cm) m3 2.74 10.96 (0.1*5.1*5.1)+(0.1*0.4*3.5)
d Beton K-225 (Pad) m3 20.81 83.23 (0.8*5.1*5.1)
e Beton K-225 (Chimney) m3 0.58 2.30 (0.8*0.8*0.9)
f Beton K-225 (Slope/Beam) m3 1.12 4.48 (0.4*0.8*3.5) Jumlah Ø Besi Unit Wight Panjang
No. Berat Besi (kg)
g Beton K-175 (Bore Pile) m3 32.99 131.95 ((1/4*π*0.6*14)*5) Batang (mm) (kg/m') Potongan (m)

h Besi beton kg 1573.29 6293.15 1) 52 D19 2.25 5.1 596.7


i Bekesting Pad m2 16.32 65.28 (4*5.1*0.8) 2) 52 D19 2.25 6.2 725.4
j Bekesting Tie Beam m2 5.60 22.40 (2*0.8*3.5) 3) 14 D19 2.25 4 126
k Bekesting Chimney m 2
3.20 12.80 (4*0.8*1) 4) 20 D19 2.25 1.7 76.5
l Pre-cast block (20 x 20 x 10)cm bh 1.00 4.00 5) 8 Ø10 0.6167 2.6 12.82736
6) 4 Ø10 0.6167 0.7 1.72676
3 Lain-Lain 7) 4 D19 2.25 1.6 14.4
a Pembuatan dan Pemasangan Patok Beton Batas Tanah bh x 8) 20 Ø10 0.6167 1.6 19.7344
b Transport Material Pondasi ke Lokasi Tower kg 145568.22 582272.89 (4.05x1650) + (2.03x2300) + ((14.58+21.91)x2400) + 4723.59 TOTAL VOLUME (kg) 1573.28852
c Tes Kubus Beton (15 x 15 x 15)cm3 bh x 9) 40 D19 2.25 Variable Variable
d Penyetelan stub (besi kaki) tower kg x 10) Variable Ø10 0.6167 Variable Variable
e Pemasangan grounding dan perlengkapannya set x
f Pengujian grounding dan perlengkapannya set x
No. Jumlah Batang Ø Besi (mm)

1) 52 D19
2) 20 Ø10
TOTAL VOLUME (kg)
Unit Wight Panjang Potongan Berat Besi
(kg/m') (m) (kg)
2.25 5.1 596.7
0.6167 2.6 32.0684
TAL VOLUME (kg) 628.7684