T D S Description T D
1.0 Pit Excavation 17.32
M3
Backfill
M3
1 5.6
cartaway surplus material
3.4 (excavatedmaterial-Backfill)M 3
4.13 2. Concrete work
50mm C-5 lean concrete
77.93
M2
2 8.2 Total C-5 concrete
0.5 C- 25 Concrete
for the base slab (500mm thick)
4.13 M2
33.87 for shear wall
M3
Top slab
M3
44.07 M3 TOTAL CONCRETE
3. Formwork
a. To Base Slab
M2
1 5.8
3.4
19.72
19.72
5.6
1 3.6
0.5
10.08
14.4
1 3.4
0.25
12.24
4.8
1 2.4
0.15
1.73
24.05
2 5.6
0.5 5.60
2 3.2
0.5 3.20 M2
2 14.4 Side Shear walls
3.4 97.92 M2
2 12.6
3.4 85.68 M2
1 4.3 Top slab
1.9 8.17 M2
1 14.4 side to top slab
0.18 2.59 M2
185.6 185.6
294.4 294.4
799.7 799.68
408.0 408
576.0 576
288.0 288
139.4 139.4
104.0 104
(m) 0 0 1049.6 537.8 1207.68 0 0
Backfill with non expansive granular excavated material and well ram in
layers not exceeding 20cm thick around fthe septic tank.
1.2
m3
2. Concrete Work
m3
2.3
Supply and fix Zigba sawn or equivalent form work for concrete m2
diam. 10mm kg
diam. 12mm kg
diam. 14mm kg
GRAND TOTAL
Qty
77.93
33.87
44.07
19.7
24.05
203.16
647.60
477.57
1,461.29
`
Rate Amount
110.00 8,572.64
395.00 13,377.07
101.00 4,450.78
26,400.49
137.00 2,701.64
137.00 3,294.58
290.00 58,916.98
0.00
36.00 23,313.72
36.00 17,192.39
36.00 52,606.54
158,025.84
184,426.33