PUBLIC HEALTH AND MUNICIPAL

ECO PROTECTION ENGINEERS PRIVATE LTD., ENGINEERING DEPARTMENT


RAJAMAHENDRAVARAM AP

SEWAGE AND SEPTAGE MANAGEMENT WITH DOCUMENT NUMBER


CONSTRUCTION OF 5MLD STP IN
PROJECT BHIMAVARAM MUNICIPALITY UNDER AMRUT
PROJECT 2016-2020 18-EPE-BVRM-STP-SBR-STR-201-A

Prepared Checked Approved Date Sheet


SBR C Tech Basin Qauntity Estimate
TITLE
considering SBC as 150kN/m2
RKK VJ MGK

Estimation SBR (CONCRETE QUANTITY)


Rect Trap
Concrete Shuttering
No Length (m) Depth (m) Width (m)
(m3) (m2)

Basin 1 31.88 0.15 28.739 137.43 18.1857

Total 137.43 18.1857


Wastage
10% 13.743 0.909285

TOTAL 151.173 19.094985

2. RCC (M30)

Rect Trap
Concrete Shuttering
No Length (m) Depth (m) Width (m) a (m) b (m) h(m) (m3) (m2)
Raft
Long Wall
(Grid A) 1 26.8 0.400 4.45 47.71
Short Wall
(Gird 6 & 2) 2 26.5 0.400 4.3 91.16

Central Wall 1 26.5 0.400 4.75 50.35


Short Wall
(Grid F) 1 26.8 0.400 1.65 17.69

Divide Wall 1 26.8 0.300 1.2 9.65

Base Slab 2 22.59 0.300 9.015 122.19

Total 338.75
Wastage
10% 33.875
Total Raft 372.625

Wall
Long Wall
(rect) 1 13.4 2.000 0.2 5.36
Long Wall
(trap)
Long Wall 1 13.4 0.6 0.2 4 13.4
0.6m at T
junction
Long (rect)
Wall 1 8.2 2.000 0.45 7.38
0.6m at T
junction (trap) 1 8.2 0.6 0.45 4 12.3
Long Wall
(rect) 1 13.4 2.850 0.2 7.638 76.38

1
PUBLIC HEALTH AND MUNICIPAL
ECO PROTECTION ENGINEERS PRIVATE LTD., ENGINEERING DEPARTMENT
RAJAMAHENDRAVARAM AP

SEWAGE AND SEPTAGE MANAGEMENT WITH DOCUMENT NUMBER


CONSTRUCTION OF 5MLD STP IN
PROJECT BHIMAVARAM MUNICIPALITY UNDER AMRUT
PROJECT 2016-2020 18-EPE-BVRM-STP-SBR-STR-201-A

Prepared Checked Approved Date Sheet


SBR C Tech Basin Qauntity Estimate
TITLE
considering SBC as 150kN/m2
RKK VJ MGK
Long Wall
(trap)
Long Wall 1 13.4 0.45 0.2 4 11.39 0
0.45m at T
junction (rect) 1 8.2 6.000 0.45 22.14 98.4
Short Wall
0.75m (rect) 1 38.6 2.000 0.2 15.44 154.4
Short Wall
0.75m (trap)
Middle Short 1 38.6 0.75 0.2 4 44.39 0
Wall 0.75m
(rect)
Midlle Short 1 24.4 2.000 0.2 9.76 97.6
Wall 0.75m
(trap)
Wall parallel 1 24.4 0.75 0.2 4 28.06 0
to 0.3m thick
wall 1 22.6 6.000 0.3 40.68 271.2

Baffle Wall 4 3.8 2.900 0.2 8.82 88.16

Baffle
CornerWall
Wall 6 3.8 5.800 0.2 26.45 264.48
along Long
wall
Corner Wall 4 6 0.4 0.2 1.5 13.2 0
along Long
wall
Corner Wall 4 6 0.4 0.2 1.5 13.2 0
along Short
wall 4 6 0.75 0.45 1.5 26.1 0

Wall inside 1 5.1 1.500 0.4 3.06 15.3

Wall inside 1 1.8 1.500 0.4 1.08 5.4


Wall round
sump pit 1 9.2 0.550 0.3 1.52 10.12

Wall outlet 1 16 1.500 0.2 4.8 48


Outlet Base
Slab 1 16 0.200 0.7 2.24 11.2

Inlet Channel 1 5.3 1.500 0.2 1.59 1.06


Inlet Channel
from PTU 1 7.7 1.000 0.2 1.54 15.4
Platform Slab
all round 1 52.2 1.200 0.15 9.4 7.83
Platform Slab
Central Wall 1 26.75 1.200 0.15 4.82 4.0125
Platform
Flight 2 1.7 1.200 0.15 0.62 8.16

Beam 2 2.8 0.300 0.3 0.51

Beam 4 2.4 0.300 0.3 0.87 0.72

Column 4 10.3 0.300 0.3 3.71 3.09


Staircase
Beam 1 1.35 0.450 0.3 0.19 0.405
Staircase
Beam 5 1.35 0.450 0.3 0.92 2.025

2
PUBLIC HEALTH AND MUNICIPAL
ECO PROTECTION ENGINEERS PRIVATE LTD., ENGINEERING DEPARTMENT
RAJAMAHENDRAVARAM AP

SEWAGE AND SEPTAGE MANAGEMENT WITH DOCUMENT NUMBER


CONSTRUCTION OF 5MLD STP IN
PROJECT BHIMAVARAM MUNICIPALITY UNDER AMRUT
PROJECT 2016-2020 18-EPE-BVRM-STP-SBR-STR-201-A

Prepared Checked Approved Date Sheet


SBR C Tech Basin Qauntity Estimate
TITLE
considering SBC as 150kN/m2
RKK VJ MGK
Staircase
Flight 3 3.025 0.150 1.2 1.64 10.89

Landing Slab 1 2.1 0.150 1.2 0.38 2.52

Column C1 2 6 0.300 0.3 1.08 3.6


Actuator
Column 4 6 0.750 0.45 8.1 10.8
Decanter
Support 4 1.2 1.500 0.3 2.16 28.8
Decanter
Support 4 1.2 0.300 0.75 1.08 3.51

Pit 3 2.5 1.000 0.2 1.5 30

Total 358.518 0
Wastage
10% 35.8518 0
Total Wall + all other 394.3698 0
Total Quantity (Raft + all other) 766.9948