Professional Documents
Culture Documents
Process Evaluation
Process Control Taking as a basis of Improvement Conceptions (e. g. BPR, KVP, TCT) and adequate
(Multi-Moment)- Quality(management)conceptions (e. g. ISO 9000 ff., Six Sigma inclusive DMAIC)
Monitoring of Recourse to an integrated Schedule (Schedule with Dead-lines and Milestones) and Resource Plan
Processs Measures for Identification of Process Measures (e. g. costs, time, properties of certain resources) and for
Process Controlling Evaluating the Process Quality
Evaluation and Monitoring of Processes Weak-point-Analysis based on Process Measures
Application of Process Measures for the Monitoring
Process Simulation
Running Simulations on bases of Process Models
Evaluating of Process Ideas
Integrating of Simulation Results in the Process Documentation
Doing/Realization
Process Realization and Running
Dedication of personal and informational resources; People with
physical and mental activities, which are performed manually
Dedication of mechanical and informational resources;
Elektronic, mechanically, hydraulic and pneumatic Machines,
which perform automatically
Allocation of financial resources and other tangible-energetic
resources (e. g. tools, buildungs, facilities, raw materials,
auxiliary materials, working materials)