FIGURE 1

STIRRUPS FOR BEAM 15 FIRST FLOOR STIRRUPS FOR BEAM 13 FIRST FLOOR PLEASE NOTE THAT THE DEGREE OF BEND HERE
PO 146 AT 65PCS NEEDED PO 120 AT 15 PCS NEEDED SHOULD BE 60mm RADIUS ON PO 128 IRON
USE DiAMETER 10mm Rod FOR THIS USE DIAMETER 10mm Rod FOR THIS

BOTTOM BARS FOR BEAM 15 FIRST FLOOR


PO 128 AT 3PCS NEEDED
USE DiAMETER 16mm Rod FOR THIS