Professional Documents
Culture Documents
Split Shaft Pto: Installation Instructions
Split Shaft Pto: Installation Instructions
APPLICATION INFORMATION
2
SPLIT-SHAFT INSTALLATION
Auxiliary PTO(s)
Truck Frame Mount to SS66 PTO
with the shaft
arrangement low.
Split-Shaft Unit
DRIVE SHAFTS
Contact your local Driveline shop for driveshafts and driveshaft alterations.
All shafts used in the vehicle’s driveline should be the same size and quality
as the original ones. The same applies to flanges, bolts, and nuts. Self-locking
nuts should never be used twice and should be replaced by new ones.
Balance - All drive shafts should be statically and dynamically balanced.
Angles - To prevent vibration and noise during operation all drive flanges must
be parallel. Therefore it is necessary to incline the split-shaft unit and all other
driven equipment at the same angle to the truck frame as the transmission.
This angle varies with the truck model. Information should be obtained from
the truck manufacturer.
Phase - Drivelines with slip joints should be used. Make sure enough
compensation is allowed for length changes. When assembling, make sure all
U-joints are correctly phased by ensuring that index markings are correctly
aligned.
Protection - For safety reasons it is highly recommended to provide all
accessible Drivelines with protection covers.
Gearbox Axis
Flanges Should Be Parallel
Truck Frame
Sliding Joint
Sliding Joint
4.50° Rear Axle
Mounting Angle
SS66 PTO
Yokes In Phase
PTO axis should be parallel
to the axis of the gearbox
OIL LEVEL
Split Shaft must be filled with oil up to fill level plug before use. Remove fill
plug and fill unit to this level with SAE 90 EP gearbox oil. Replace plug. Check
oil level regularly every two weeks.
4
DIMENSIONAL INFORMATION
SS66 PTO
8.82 30°
[224] 3.03
6.38 3.03
] [76.9
1.22 [162] [76.9 ]
[31]
2.60
[66]
7.40
[188]
0.83 3.54
[21] 4.80 [90]
[122]
5.63 0.98
Oil Level
0.83 Ø 0.51
[142.9] [21] [24.9] Fill Plug
7.83 [13]
[199] Stroke
2.76 3.94
[70] [100]
5.67
[144]
1.40 0.98
3.31 [25]
[84] [35.5]
FRONT OF VEHICLE
5
MAIN SHAFT FLANGES
1410/DIN 20 FLANGE
Ø 3.75 (1410)
[95.3]
80° Ø 4.00 (Din 20)
[101.6]
Ø .48
Ø 4.72 Ø 2.95 Ø 2.75 [12.3]
[120] [75] [69.9]
Ø .40
[10.3]
0.08 FRONT VIEW
[2] 0.31
[8]
PROFILE VIEW
1480/1550 FLANGE
Ø 0.50 Ø 0.56
[12.7] [14.2]
Ø 4.75
[120.7]
Ø 5.79 Ø 3.75
[147] [95.3]
80.00°
80.00°
0.12
[3] 0.39
[10]
FRONT VIEW
PROFILE VIEW
6
SUPPORT BRACKET
OPTIONAL KIT — 2991970000
2.64 2.64
[67] [67]
5.67
[144]
5.28
[134]
1.77
[45]
1.77
[45]
7
SS66 INSTALLATION KITS
SS66 ACTIVATION KIT INSTALLATION
SS66 Housing SS66 Housing
1/8" NPT
1/4" ID Tubing
Port 1 Port 2
Port R Port 3
To Pressure
Switch
To Battery Port 4
11 11
BACK OF VALVE ASSEMBLY
From Port 4
6
SS66 Split Shaft
9
8 10 To Truck Air 8
Supply Tank
NOTE: Connect directly to the air tank.
Do not use hose or tubing.
From Port 1
From Port 2
2 3
3 4
16
5 1
Ground
13 15
14 17
12 7 12V DC Battery
AIR VALVE ASSEMBLY
ITEM QTY PART NO. DESCRIPTION ITEM QTY PART NO. DESCRIPTION
ACTIVATION KIT 48TK4985 10 1 44MB6844 Tube Fitting
1 1 30T37954 Pressure Switch 11 2 44MB6942 Tube Fitting (Elbow)
2 1 44MB2252 Fitting 12 3 34M18002 End Crimp
3 2 44MB6842 Fitting 13 12.5' 37M18000 Electrical Wire
4 1 44T35791 Fitting 14 1 35T37955 Air Valve
5 1 34T36941 Pig Tail 15 1 32M12001 PTO Light - 12VDC
ACTIVATION KIT 48M61261A (included in 48TK4985) 16 1 36T38049 Dash Bracket
6 1 31M15759 Pressure Protection Valve 17 1 36T38016 Face Plate
7 1 33T36299 Fuse Assembly N.S. 1 34T38163 Booted Connector
8 1 45M44430 Air Tubing (0.25" x 30 ft.) N.S. 1 36MK1007 Bolt Kit
9 1 44MB2164 1/4" N.P.T. Nipple
8
SS66 INSTALLATION KITS
ELECTRIC/AIR 12V: “E” OPTION — 48TK4986
16
18
17
DASH BRACKET
To Truck Air
Supply Tank
NOTE: Connect directly to the air tank. 9 9
Do not use hose or tubing.
7
5
8
6 6 SS66 Split Shaft
15
4 6
8 2
Ground
1
10
11 14 3
Ground
12 13
12V DC Battery
ITEM QTY PART NO. DESCRIPTION ITEM QTY PART NO. DESCRIPTION
ACTIVATION KIT 48TK4986 11 1 33T36299 Fuse Assembly
1 1 30T37954 Pressure Switch 12 3 34T36362 End Crimp
2 1 44MB2252 Fitting 13 3 34M18250 Female Spade Connector
3 1 34T36941 Pig Tail 14 12' 37M18000 Electrical Wire
ACTIVATION KIT 48T37421A (included in 48TK4986) 15 1 45M44430 Air Tubing (0.25" x 30 ft.)
4 1 44MB2164 1/4" N.P.T. Nipple 16 1 36MA1005 Dash Bracket
5 1 31M15759 Pressure Protection Valve 17 1 36M01007 Face Plate
6 1 44MB6844 Tube Fitting 18 1 30T35687 Switch
7 1 35T41078 Solenoid Valve N.S. 2 44MB0942 Adapter Bushing
8 2 44M30137 Breather N.S. 1 34T38163 Booted Connector
9 2 44MB6942 Tube Fitting (Elbow) N.S. 1 36MK1007 Bolt Kit
10 1 34M18009 Ring Terminal
9
MANUAL TRANSMISSION
AUTOMATIC TRANSMISSION
ENGAGING THE SPLIT SHAFT PTO
1. Stop the vehicle and put the transmission in neutral.
2. Apply the parking brake and block wheels (if the unit is to operate while
the vehicle is stationary).
3. For stationary operation: Shift the main shaft air control (double acting) to
disconnect the drive to the rear axle.
4. Engage the required PTO output(s) by operating the relevant air control(s).
5. Shift transmission into the required gear selection. Use caution if
placing the transmission into reverse as it may cause damage to the
driven component(s).
10
AUTOMATIC TRANSMISSION
6. Stationary application: Using a method specified by the transmission
manufacturer, shift transmission into direct drive.
Mobile application: If Split Shaft is not disengaged from the rear axle,
release parking brake to allow vehicle to be driven at application rate.
7. For stationary operation: Set the engine speed to the required R.P.M.
11
POWER TAKE-OFF WARRANTY
The Muncie Power Take-Off is warranted to be free of defects in material
or workmanship and to meet Muncie’s standard written specifications at
the time of sale. Muncie’s obligation and liability under this warranty is
expressly limited to repairing or replacing, at Muncie’s option, within one
year after date of original installation any defective part or parts or any
product not meeting the specifications.