Calculation Air Change

Example Calculation Air Change


Total Air Change = Area x Ceiling Height x Air Change

Post Op & Pre Op Room :


Air Change = 140 m2 x 3 meter x 6 ACH (Based on Permenkes 2016) = 2.520 m3/h
Air flow capacity installed on site = 5.763 m3/h.

5.763 m3/h
Total Air Change On Site = -------------------------
140 m2 x 3 meter

= 13,72 Air Change

576 m3/h
Fresh air 10% of total air flow = -------------------------
140 m2 x 3 meter

= 1,37 Air Change