10 FC-0508-80(PYC.80) Powder material 1.Hall flow meter
1. Sub-supplier Incoming (NO.002) manufacturing process inspection 2.Atomic Absorption 2. Material label 粉末原料入库 Spectrophotometer 110. Material conform to FC-0508- 检查 80(Modified) 3. Measurement system (NO.DB4-30001) a. Chemical Analysis 1.供应商制造过程 3.Carbon determination C 0.75%-0.95% 2.原料标签 (LECO C-200) Cu 5%-6% 3.量测系统 (NO.DB4-30003) Fe remainder b. Apparent density: 3.00-3.40 g/cm3 1.霍尔流量计 c. Flow rate: 35s max/50g (NO.002) 2.原子吸收光谱 110.原料符合FC-0508-80(改良) (NO.DB4-30001) a. 化学分析 3.C分析仪 C 0.75%-95% (NO.DB4-30003) Cu 5%-6% Fe remainder b. 松装密度: 3.00-3.40 g/cm3 c. 流动性: 35s max/50g
20 1. The storage location for Material storage
individual material 粉末储存 2. The identification of material 3. Powder packaging status 4. Powder storage time Only confirming material release to 1. 原料存放的独立位置 production 2. 原料标识 只有经过确认的原料才能发放到生产线 3. 粉末包装状态 4. 粉末储存时间 Process Flow Diagram Prototype样件 Pre-Launch预生产 Production生产 Supplier/Plant供应商/制造厂商: Date (Orig.)日期 (编制.):
Part Number/Latest Change Level零件号/更改水平: Supplier Code供应商代号: Date (Rev.)日期(更改):
Part Name/Description零件名称/描述: Key Contact/Phone主要联系人/电话: Customer(顾客) :
Program机型: Core Team核心小组:
Opera- Operation Equipment Process Flow过程流程 ( Equipment No.设备编号)