QUESTIONS ON Basic Construction Safety


SITUATION 3.1 Company AAA is going to construct a 8,000 square meters cold storage factory in
6 month time steel framed and covered with the pre-painted and insulated steel roofing
and wall cladding.
VEST & HARD GOGGLES/ 4 PAIRS - SAFETY
PERSONAL 8 PCS - DUST
HARNESS HAT FACE GLOVES / SHOES
PROTECTION MASK /
(1SET (1SET SHIELD MONTHLY (1SET
EQUIPMENT (PPE) MONTHLY
ONLY) ONLY) 1SET ONLY ONLY)
Project Manager (1) 1 1 4 1 8
Project Engineer (1) 1 1 4 1 8
Plant Manager (1) 1 1 4 1 8
Finishing (4) 1 1 1 4 1
Painting (4) 1 1 1 4 1
Electrical (2) 1 1 1 4 1
Welders (6) 1 1 1 4 1
Workers (100) 1 1 4 1 8
Safety Officer (1) 1 1 4 1 8
Unit Cost ( in PhP) 465 200 300 80 1,400 20

a) How much does it cost per month without the painter and finisher?
b) How much is the TOTAL BUDGET required for PPE?
c) If the project is extended for another 3 months, how much is the upgraded PPE budget?
d) How much does extension of construction time cost per month with finishing and painting added?
e) What is the percentage increase of PPE cost over the original (6) months project duration?