1 101910 - 350KVA 21-Apr-14 11167 8-Apr-14 10991 26-Apr-14 11291 0
2 120344 - 350KVA 6-Feb-14 11971 18-Feb-14 12271 0
3 101024 - 350KVA 28-Apr-14 8390 10-May-14 8690 0
4 117824 - 270KVA 17-Apr-14 5355 29-Apr-14 5655 0
5 116004 - TITAN701 2-Apr-14 690 28-Feb-14 602 7-May-14 902 0
6 P 40138 - CD.200 20-Apr-14 2454 22-Jan-14 2371 8-May-14 2671 0
7 P 40161 - HL.150 22-Apr-14 3686 4-May-14 3986 0
8 120624 - HL.200 20-Apr-14 8011 12-Feb-14 7945 9-May-14 8245 0
9 P 40674 - HL.200 21-Apr-14 6957 16-May-14 7257 0
10 P 40677 - HL.150 22-Apr-14 9996 4-May-14 10296 0
11 120124 - CD.200 20-Apr-14 8475 21-Jan-14 8261 4-May-14 8561 0
12 122044 - LT 23-Apr-14 6796 18-May-14 7096 0
13 122084 - LT 23-Apr-14 7019 18-May-14 7319 0
14 122224 - LT 23-Apr-14 5053 18-May-14 5353 0
15 122324 - LT 15-Apr-14 5340 10-May-14 5640 0
16 122464 - LT 6-Apr-14 7520 1-May-14 7820 0

INTERVAL DAYS CODE REMARKS UNIT


300 25 SERVICE IN WEEK 12
12.5 SERVICE NEXT WEEK 11
18 SERVICE OFF / STANDBY 14
21 NOT UPDATE 0
16 UPDATE 12
OFF HIRE
11 TOTAL 49
44
47
68
9
11
24
493.41666667
495.16666667
651.58333333
250.95833333
469.5
205.79166667
483.16666667
UNIT REPLACED WATER COOLANT / 60
ESTIMATE REMARKS LOCATION
OPR STB BD/OH HM
5.16666666667 (replaced to 120524) Operation Base Camp - Mine Site 1 4870
0 Operation Port - Betung 1 4381
3.91666666667 Operation Base Camp - Mine Site 1 2210
235.625 Operation Port - Betung 1 3550
35.3333333333 Operation W/S Palu Rejo 1 5780
18.0833333333 Operation Pit.Malintut 1 4454
166.083333333 Operation Pit Kananai 1 4831
19.5 (Replaced unit P40273)Operation Pit A 1 4223
1209.5 Operation Pit A 1 6654
429 (Replaced unit P40678)Operation Pit Kananai 1 5117
14.3333333333 Operation Pit Malintut 1 5227
591.333333333 Operation Pit.Kananai 1 2985
609.916666667 Operation Pit.A 1 2915
446.083333333 Operation Stockpile Malintut 1 3786
Operation W/S Palu Rejo 1 3354
Operation Pit A 1 2630
16 0
REPLACED WATER COOLANT / 6000Hr LAST REPLACED
ESTIMATE DAY DATE HM DATE
405.833333333 10-Jun-14
365.083333333 9-May-14
184.166666667 3-Nov-13
295.833333333 7-Mar-14
481.666666667 10-Sep-14
371.166666667 6-May-14
402.583333333 23-Jun-14
351.916666667 16-Apr-14
554.5 26-Jan-16 5346 21-Jul-13
426.416666667 17-Jul-14
435.583333333 9-Jul-14
248.75 18-Jan-14 6408 26-Mar-14
242.916666667 28-Dec-13
315.5 28-Mar-14
279.5 20-Feb-14
219.166666667 5-Dec-13
DAILY CHECK LAST SERVICE NEXT SERVICE LOSE TIME
NO UNIT NUMBER
DATE HM DATE HM DATE HM DATE HM
1 101910 - 350KVA 21-Apr-14 11167 8-Apr-14 10991 26-Apr-14 11291 0
2 120344 - 350KVA 6-Feb-14 11971 18-Feb-14 12271 0
3 101024 - 350KVA 28-Apr-14 8390 10-May-14 8690 0
4 117824 - 270KVA 17-Apr-14 5355 29-Apr-14 5655 0
5 116004 - TITAN701 2-Apr-14 690 28-Feb-14 602 7-May-14 902 0
6 P 40138 - CD.200 20-Apr-14 2454 22-Jan-14 2371 8-May-14 2671 0
7 P 40161 - HL.150 22-Apr-14 3686 4-May-14 3986 0
8 120624 - HL.200 20-Apr-14 8011 12-Feb-14 7945 9-May-14 8245 0
9 P 40674 - HL.200 21-Apr-14 6957 16-May-14 7257 0
10 P 40677 - HL.150 22-Apr-14 9996 4-May-14 10296 0
11 120124 - CD.200 20-Apr-14 8475 21-Jan-14 8261 4-May-14 8561 0
12 122044 - LT 23-Apr-14 6796 18-May-14 7096 0
13 122084 - LT 23-Apr-14 7019 18-May-14 7319 0
14 122224 - LT 23-Apr-14 5053 18-May-14 5353 0
15 122324 - LT 15-Apr-14 5340 10-May-14 5640 0
16 122464 - LT 2-May-14 164 27-May-14 464 0

INTERVAL DAYS CODE REMARKS UNIT


300 25 SERVICE IN WEEK 12
12.5 SERVICE NEXT WEEK 11
18 SERVICE OFF / STANDBY 14
21 NOT UPDATE 0
16 UPDATE 12
OFF HIRE
11 TOTAL 49
44
47
68
9
11
24
493.41666667
495.16666667
651.58333333
250.95833333
469.5
205.79166667
483.16666667
UNIT REPLACED WATER COOLANT / 6
ESTIMATE REMARKS LOCATION
OPR STB BD/OH HM
5.16666666667 (replaced to 120524) Operation Base Camp - Mine Site 1 4870
0 Operation Port - Betung 1 4381
3.91666666667 Operation Base Camp - Mine Site 1 2210
235.625 Operation Port - Betung 1 3550
35.3333333333 Operation W/S Palu Rejo 1 5780
18.0833333333 Operation Pit.Malintut 1 4454
166.083333333 Operation Pit Kananai 1 4831
19.5 (Replaced unit P40273)Operation Pit A 1 4223
1209.5 Operation Pit A 1 6654
429 (Replaced unit P40678)Operation Pit Kananai 1 5117
14.3333333333 Operation Pit Malintut 1 5227
591.333333333 Operation Pit.Kananai 1 2985
609.916666667 Operation Pit.A 1 2915
446.083333333 Operation Stockpile Malintut 1 3786
Operation W/S Palu Rejo 1 3354
Operation Pit A 1 2630
16 0
REPLACED WATER COOLANT / 6000Hr LAST REPLACED
ESTIMATE DAY DATE HM DATE
405.833333333 10-Jun-14
365.083333333 9-May-14
184.166666667 3-Nov-13
295.833333333 7-Mar-14
481.666666667 10-Sep-14
371.166666667 6-May-14
402.583333333 23-Jun-14
351.916666667 16-Apr-14
554.5 26-Jan-16 5346 21-Jul-13
426.416666667 17-Jul-14
435.583333333 9-Jul-14
248.75 18-Jan-14 6408 26-Mar-14
242.916666667 28-Dec-13
315.5 28-Mar-14
279.5 20-Feb-14
219.166666667 5-Dec-13
DAILY CHECK LAST SERVICE NEXT SERVICE LOSE TIME
NO UNIT NUMBER
DATE HM DATE HM DATE HM DATE
1 101910 - 350KVA 21-Apr-14 11167 8-Apr-14 10991 26-Apr-14 11291
2 120344 - 350KVA 6-Feb-14 11971 18-Feb-14 12271
3 101024 - 350KVA 28-Apr-14 8390 23-May-14 8690
4 117824 - 270KVA 17-Apr-14 5355 29-Apr-14 5655
5 120524 - 500kVA 4-May-14 5075 3-Apr-14 4884 8-May-14 5184
6 116004 - TITAN701 4-May-14 724 28-Feb-14 602 2-Jun-14 902
7 P 40138 - CD.200 4-May-14 2474 22-Jan-14 2371 5-Jun-14 2671
8 P 40161 - HL.150 4-May-14 3956 22-Apr-14 3686 9-May-14 3986
9 120624 - HL.200 4-May-14 8162 12-Feb-14 7945 17-May-14 8245
10 P 40674 - HL.200 4-May-14 7044 21-Apr-14 6957 8-Jun-14 7257
11 P 40677 - HL.150 4-May-14 10258 22-Apr-14 9996 7-May-14 10296
12 120124 - CD.200 3-May-14 8585 28-May-14 8885
13 122044 - LT 4-May-14 6914 23-Apr-14 6796 19-May-14 7096
14 122084 - LT 4-May-14 7144 23-Apr-14 7019 18-May-14 7319
15 122224 - LT 4-May-14 5128 23-Apr-14 5053 22-May-14 5353
16 122324 - LT 4-May-14 5549 15-Apr-14 5340 11-May-14 5640
17 122464 - LT 4-May-14 187 2-May-14 164 27-May-14 464

INTERVAL DAYS CODE REMARKS UNIT


300 25 SERVICE IN WEEK 12
12.5 SERVICE NEXT WEEK 11
18 SERVICE OFF / STANDBY 14
21 NOT UPDATE 0
16 UPDATE 12
OFF HIRE
11 TOTAL 49
44
47
68
9
11
24
493.41666667
495.16666667
651.58333333
250.95833333
469.5
205.79166667
483.16666667
LOSE TIME UNIT
ESTIMATE REMARKS LOCATION
HM OPR STB BD/OH
0 20.6666666667 (replaced to 120524) Operation Base Camp - Mine Site 1
0 2045.16666667 Operation Port - Betung 1
0 1448.33333333 Operation Base Camp - Mine Site 1
0 942.5 Operation Port - Betung 1
4.54166666667 Operation Port - Betung 1
0 29.6666666667 Operation W/S Palu Rejo 1
0 32.8333333333 Operation Pit.Malintut 1
0 5 Operation Pit Kananai 1
0 13.8333333333 (Replaced unit P40273)Operation Pit A 1
0 35.5 Operation Pit A 1
0 3.16666666667 (Replaced unit P40678)Operation Pit Kananai 1
24 Operation Pit Malintut 1
15.1666666667 Operation Pit.Kananai 1
14.5833333333 Operation Pit.A 1
18.75 Operation Stockpile Malintut 1
7.58333333333 Operation W/S Palu Rejo 1
23.0833333333 Operation Pit A 1
17 0
REPLACED WATER COOLANT / 6000Hr LAST REPLACED
HM ESTIMATE DAY DATE HM DATE
4870 405.833333333 10-Jun-14
4381 365.083333333 9-May-14
2210 184.166666667 3-Nov-13
3550 295.833333333 7-Mar-14

5780 481.666666667 10-Sep-14


4454 371.166666667 6-May-14
4831 402.583333333 23-Jun-14
4223 351.916666667 16-Apr-14
6654 554.5 26-Jan-16 5346 21-Jul-13
5117 426.416666667 17-Jul-14
5227 435.583333333 9-Jul-14
2985 248.75 18-Jan-14 6408 26-Mar-14
2915 242.916666667 28-Dec-13
3786 315.5 28-Mar-14
3354 279.5 20-Feb-14
2630 219.166666667 5-Dec-13
DAILY CHECK LAST SERVICE NEXT SERVICE LOSE TIME
NO UNIT NUMBER
DATE HM DATE HM DATE HM DATE
1 101910 - 350KVA 19-May-14 11344 19-May-14 11344 14-May-14 11644
2 120344 - 350KVA 6-Feb-14 11971 18-Feb-14 12271
3 101024 - 350KVA 28-Apr-14 8734 23-May-14 9034
4 117824 - 270KVA 22-May-14 5870 6-May-14 5656 31-May-14 5956
5 120524 - 500kVA 13-May-14 5235 13-May-14 5235 5535
6 116004 - TITAN701 4-May-14 724 28-Feb-14 602 2-Jun-14 902
7 P 40138 - CD.200 18-May-14 2502 22-Jan-14 2371 15-Jun-14 2671
8 P 40161 - HL.150 4-May-14 3956 9-May-14 3986 28-Jun-14 4286
9 120624 - HL.200 24-May-14 8200 24-May-14 8200 8500
10 P 40674 - HL.200 4-May-14 7044 24-May-14 6957 8-Jun-14 7257
11 P 40677 - HL.150 31-May-14 10557 22-Apr-14 10270 26-Apr-15 10570
12 120124 - CD.200 11-May-14 8592 3-May-14 8585 22-Jun-14 8885
13 122044 - LT 22-May-14 7111 22-May-14 7111 7411
14 122084 - LT 21-May-14 7335 21-May-14 7335 7635
15 122224 - LT 22-May-14 5301 22-May-14 5301 5601
16 122324 - LT 16-May-14 5640 16-May-14 5640 5940
17 122464 - LT 21-May-14 470 21-May-14 470 770

INTERVAL DAYS CODE REMARKS UNIT


300 25 SERVICE IN WEEK 12
12.5 SERVICE NEXT WEEK 11
18 SERVICE OFF / STANDBY 14
21 NOT UPDATE 0
16 UPDATE 12
OFF HIRE
11 TOTAL 49
44
47
68
9
11
24
493.41666667
495.16666667
651.58333333
250.95833333
469.5
205.79166667
483.16666667
LOSE TIME UNIT
ESTIMATE REMARKS LOCATION
HM OPR STB BD/OH
300 Base Camp - Mine Site 1 4870
0 2045.16666667 Operation Port - Betung 1
0 1505.66666667 Operation Base Camp - Mine Site 1
0 14.3333333333 Operation Port - Betung 1
Operation Port - Betung 1
0 29.6666666667 Operation W/S Palu Rejo 1
0 28.1666666667 Operation Pit.Malintut 1
0 55 Operation Pit Kananai 1
0 50 (Replaced unit P40273)Operation Pit A 1
0 35.5 Operation Pit A 1
0 330 (Replaced unit P40678)Operation Pit Kananai 1
24 50 Operation Pit Malintut 1
25 Operation Pit.Kananai 1
25 Operation Pit.A 1
25 Operation Stockpile Malintut 1
25 Operation W/S Palu Rejo 1
25 Operation Pit A 1
15 0
REPLACED WATER COOLANT / 6000Hr LAST REPLACED
HM ESTIMATE DAY DATE HM DATE
405.83333 10-Jun-14
4381 365.083333333 9-May-14
2210 184.166666667 3-Nov-13
3550 295.833333333 7-Mar-14

5780 481.666666667 10-Sep-14


4454 371.166666667 6-May-14
4831 402.583333333 23-Jun-14
4223 351.916666667 16-Apr-14
6654 554.5 26-Jan-16 5346 21-Jul-13
5117 426.416666667 17-Jul-14
5227 435.583333333 9-Jul-14
2985 248.75 18-Jan-14 6408 26-Mar-14
2915 242.916666667 28-Dec-13
3786 315.5 28-Mar-14
3354 279.5 20-Feb-14
2630 219.166666667 5-Dec-13

You might also like