200Ø S 200Ø S

TO BAS P

PG

S
200
200Ø 200Ø
50Ø FEED WATER VENT

150Ø 150Ø
75Ø BDS VENT

VTR PUMP CONTROL VTR PUMP CONTROL


WITH LOW LEVEL WITH LOW LEVEL CV-HUM-01 CV-HUM-02 CV-HUM-03 CV-HUM-04 CV-HUM-05 CV-HUM-06
CUTOFF AND CUTOFF AND 40Ø CV MOD 200Ø 40Ø CV MOD MOD 40Ø CV MOD 40Ø CV MOD MOD
40Ø INLET FROM 40Ø CV 40Ø CV
25Ø DCW

PRV GAUGE GLASS PRV GAUGE GLASS


BOILER
6 6 6 6 6 6
20Ø 20Ø 20Ø 20Ø 20Ø 20Ø
PG PG
AHU-1 75Ø AHU-2 75Ø AHU-3 75Ø AHU-4 75Ø AHU-5 75Ø AHU-6 75Ø
75Ø BDS VENT

12 PSI PACKAGED SYSTEM 12 PSI PACKAGED SYSTEM


1,725 LB/Hr 1,725 LB/Hr 240 KG/HR 240 KG/HR 240 KG/HR 240 KG/HR 240 KG/HR 240 KG/HR
50 BHP 50 BHP 2 2 2 2 2 2
FEEDWATER TANK
50Ø OVERFLOW DRAIN

BST BST
1 2 5 5 5 5 5 5

20Ø 20Ø 20Ø 20Ø 20Ø 20Ø


75Ø TO DRAIN

Ts A A
FWT
1 RFP Response:

FROM DCW FROM DCW FROM DCW FROM DCW FROM DCW FROM DCW

25Ø TO DRAIN
25Ø 25Ø 25Ø 25Ø 25Ø 25Ø
32Ø INLET 32Ø INLET 20Ø 20Ø 20Ø 20Ø 20Ø 20Ø
100Ø FFD 100 Ø FFD REFER TO STANDARD 100Ø FFD 100Ø FFD 100 Ø FFD 100 Ø FFD 100Ø FFD 100Ø FFD
TO BOILER 32Ø BLOWDOWN TO BOILER 32Ø BLOWDOWN DETAIL 3/M-908 FOR
BLOWDOWN TANK STEAM HUMIDIFICATION
PIPING DETAIL 19 2018-07-23 UPDATED IFC
LEVEL 2 18 2018-02-23 ISSUED FOR WORK-IN-PROGRESS SET
17 2017-08-29 ISSUED FOR CONSTRUCTION
16 2017-08-11 ISSUED FOR IFC REVIEW SET
15 2017-05-16 ISSUED FOR CD 95% FORMAL RESUBMISSION
14 2016-12-19 ISSUED FOR BUILDING PERMIT
20 FEEDWATER

13 2016-12-21 CD 95% FORMAL SUBMISSION


12 2016-11-28 ISSUED FOR DBJV REVIEW
11 2016-11-04 ISSUED FOR BCJV INTERNAL REVIEW
10 2016-09-30 CD 95% DRAFT SUBMISSION
9 2016-09-19 CD 95% DRAFT DBJV REVIEW
8 2016-07-20 FORMAL 50% CD SUBMISSION
7 2016-07-04 ISSUED 50% CD FOR DBJV INTERNAL REVIEW
K1 2016-06-24 ISSUED TO KELSON FOR CONTROL VALVES
6 2016-05-06 FORMAL DD SUBMISSION
5 2016-04-08 ISSUED FOR M&E WORKSHOP APRIL 12-13
4 2016-03-04 DESIGN DEVELOPMENT SUBMISSION - FORMAL
3 2016-01-25 COORDINATION
2 2016-01-04 DRAFT DESIGN DEVELOPMENT SUBMISSION
1 2015-12-11 DD DRAFT SUBMISSION INTERNAL REVIEW
REV. YYYY-MM-DD REVISION / DRAWING ISSUE REVIEW
CONSULTANT

CR O S S E Y 2255 Sheppard Avenue E.


ENGINEERING Suite E. 331
L TD North York, On M2J 4Y1
(416)497.3111 fax (416)497.7210

PERMIT STAMP

LEVEL 1

SEAL
FROM SOFTENING PLANT M-714

NOTES:

1 SLOPE PIPE BY 12MM ( 1_2") PER 3048MM (120")

2 STEAM TRAP ASSEMBLY

3 REFER TO LAYOUT DRAWING FOR LOCATION OF FLOOR DRAINS.


COMBINE DRAIN OUTLETS FROM EQUIPMENT TO DRAIN INTO
FLOOR DRAIN.

4 PACKAGED STEAM BOILER SYSTEM BY MANUFACTURER.


CONTRACTOR SHALL COORDINATE FIELD PIPING WITH PIPING BY
MANUFACTURER.
5 HUMIDIFIER GRID IS PROVIDED w/ STEAM FOR JACKET.
HUMIDIFIER GRID IS PROVIDED w/ STEAM FOR DISPERSION
INTO THE AIR STREAM, CONTROLLED VIA A MODULATING
CONTROL VALVE.

6 CONTROL VALVE SHALL BE INSTALLED ON THE INLET TO THE


STEAM SEPARATOR. REFER TO STANDARD DETAIL 3/M-908
FOR CORRECT LOCATION OF VALVE. PROJECT

STANTON TERRITORIAL HOSPITAL


RENEWAL PROJECT
SC795017
550 BYRNE ROAD, YELLOWKNIFE, NWT

DRAWING TITLE

LEVEL 0 HUMIDIFICATION SYSTEM


SCHEMATIC

DRAWING ISSUE

UPDATED IFC

PROJECT NO. PLOT DATE DRAWN


2015-10-02 DM
14211 SCALE REVIEWED
VS
DRAWING NO. REVISION

M-709 19