Professional Documents
Culture Documents
TO BAS P
PG
S
200
200Ø 200Ø
50Ø FEED WATER VENT
150Ø 150Ø
75Ø BDS VENT
BST BST
1 2 5 5 5 5 5 5
Ts A A
FWT
1 RFP Response:
FROM DCW FROM DCW FROM DCW FROM DCW FROM DCW FROM DCW
25Ø TO DRAIN
25Ø 25Ø 25Ø 25Ø 25Ø 25Ø
32Ø INLET 32Ø INLET 20Ø 20Ø 20Ø 20Ø 20Ø 20Ø
100Ø FFD 100 Ø FFD REFER TO STANDARD 100Ø FFD 100Ø FFD 100 Ø FFD 100 Ø FFD 100Ø FFD 100Ø FFD
TO BOILER 32Ø BLOWDOWN TO BOILER 32Ø BLOWDOWN DETAIL 3/M-908 FOR
BLOWDOWN TANK STEAM HUMIDIFICATION
PIPING DETAIL 19 2018-07-23 UPDATED IFC
LEVEL 2 18 2018-02-23 ISSUED FOR WORK-IN-PROGRESS SET
17 2017-08-29 ISSUED FOR CONSTRUCTION
16 2017-08-11 ISSUED FOR IFC REVIEW SET
15 2017-05-16 ISSUED FOR CD 95% FORMAL RESUBMISSION
14 2016-12-19 ISSUED FOR BUILDING PERMIT
20 FEEDWATER
PERMIT STAMP
LEVEL 1
SEAL
FROM SOFTENING PLANT M-714
NOTES:
DRAWING TITLE
DRAWING ISSUE
UPDATED IFC
M-709 19