PILING INSPECTION CHECKLIST

PROJECT NAME DATE

PLOT NO.

LOCATION
SPECIALIZED
CONSULTANT
CONTRACTOR

SECTION S/N ELEMENTS TO BE CHECKED CONSULTANT CONTRACTOR


NOT NOT
GENERAL OK N/A OK N/A
OK OK
1 PILES LAYOUT/GRID LINES
2 SAFETY
3 ACCESS
4 CLEANING
5 DEWATERING SYSTEM
PAPERS
6 VALID BUILDING PERMIT
7 VALID SITE PLAN
8 APPROVED DRAWING BY CREATIVE CLUSTERS AUTHORITY
9 SHORING COMPLETION CERTIFICATE
PILES
10 COVER
11 REINFORCEMENT
12 STARTER BARS
13 GIRDS AND AXIS
14 LEVELS
15 PILES DIAMETERS/LENGTH

REVIEWER’S COMMENT(S):

SPECIALIZED CONTRACTOR CONSULTANT

NAME NAME

DESIGNATION DESIGNATION

STAMP STAMP

SIGN SIGN

DATE DATE

Page 1 of 1 ZD-DC-F-100 Issue 2, Rev 0, Dated 14/06/2015