TECHNOLOGICAL UNIVERSITY (TAUNGGYI )


DEPARTMENT OF CIVIL ENGINEERING

STUDY ON CONSTRUCTION SITES


PRESENTATION

PRESENTED BY
6.11.2019 (Wednesday) GROUP 3
FIFTH YEAR CIVIL
2
Members List
NO. NAME ROLL NO.
1. Ma Than Thar Lin Lae 5C - 17
2. Sai Han Linn Tun 5C - 19
3. Mg Kaung Myat Thu 5C - 20
4. Mg Oke Soe Kyaw 5C - 26
5. Sai Aung Naing 5C - 28
6. Khun Moe Kyaw Toe 5C - 29
7. Khun Naing Oo 5C - 30
8. Mg Chan Myae Htun 5C - 32
9. Mg Arkar Myo 5C - 35
10. Sai Fa Zin 5C - 42
3
Outlines Of Presentation

1. Introduction

2. Objectives of Study

3. Theory

4. Site Visit

5. Discussion

6. Conclusion

4
Introduction
 The site visit of the precast construction and Times City Project were
organized by the respective engineers, project manager and supervisors on
21st October 2019.

 The location of the precast site visit was at North Dagon, Yangon and Times
City was between Hantharwady Road and Kyun Taw Road, Yangon.

 The agenda of the visits consist of in-depth explanation by the contractors,


engineers and consultants on the operations of the projects.

 At the end of the session, there was a questionings and answering session
between the students and the hosts.
5
Objectives of study
1. To get experiences and learn more about construction site that will face after
entering construction site.
2. To know about the process of precast construction and buildings complex
construction project by observing a real example of working space.
3. To understand about construction technology of buildings and different
methods of constructing.
4. To get more information and experiences from site engineers working at
construction site.

6
Outlines of Site Visit
• Chapter 1 – Introduction

• Chapter 2 – Theory

• Chapter 3 – Site Visit

• Chapter 4 – Discussion and Conclusion

7
Theory
Precast Construction
 Concrete Elements, cast and cured in a manufacturing plant, transported
to the construction site and lifted to the place.

Figure (1) Precast Concrete Building 8


Precast Concrete Construction Process
1. Production of reinforced cages and main connections

2. Assembly of molds

3. Mix being poured

4. Compaction of concrete using poker vibrator

5. Precast concrete being moved to the storage area

6. Storage of high-quality units in works area

7. Transport to site

8. Erection at site
9
Types of Precast Construction System

10
Methods of Attachment of Precast Members
Two types of attachment…

Welding
Plate Rebar and
grouting

Figure (2) Welding Plate Figure (3) Rebar and Grouting


11
Advantages

1. Construction in less time

2. Fire resistance and low cost

3. High quality because of the controlled condition in the factory

4. Easy installation

5. Durability

6. No need plastering work

12
Disadvantages
1. Skilled labors are required in the application if the panel on site

2. Heavy machines such as cranes are required to lift panels

3. Need more workspace for cranes

4. Handling difficulties

5. If not properly handled, the precast units may be damaged during transport

6. Difficult in modification of the structure

7. It is difficult to produce satisfactory connections between the precast members

13
Pile Foundation
Bored pile, also called drilled shaft, is a type of reinforced-concrete
foundation that supports structures with heavy vertical loads. A bored pile is a cast-
in-place concrete pile, meaning the pile is cast on the construction site.

Figure (4) Square Pile Figure (5) Pile Installation


14
Site Visit
(1) Precast Concrete Construction Site
 The site is under construction by the Myanmar V-Pile Group.

 Bo Ba Htoo fair price apartments

 Pile Foundation type , Square piles

Figure (6) Precast Construction Building


15
(1) Transportation of precast from industry
The precast elements should be delivered with supports and frames
to prevent in transit damage.

Figure (7) Transportation using vehicles


16
(2) Installation of precast panels using cranes
The precast panels are installed using suitable machines.
The precast panels are installed in the case of large panel system.

Figure (8) Installation Figure (9) Crane


17
(3) Shear keys
The shear keys are important because they are capable to transfer
the shear forces.

Figure (10) Shear keys

18
(4) Shear Keys Welding
Welded with consider quality of weld.

Figure (11) Welding Figure (12) Welding with Plate


19
(5) Vertical corner joints
Wall to wall corners jointed using shear keys.

Figure (13) Vertical Corners Welding


20
(6) Grouting Cement Work
Fill with grouting cement between the vertical joints.

Figure (14) Panel Number Figure (15) Grouting Cement Work 21


(7) Propping of precast panels after installation
The panels must be braced and supported during installation to ensure
proper alignment and until permanent structural connections are completed. All
temporary propping requirements must be shown on the erection drawings.

Figure (16) Props


22
(8)Pile Foundation

• 8”x 8” Square pile

• U – 600 ( 148 piles )

• U – 900 ( 224 piles )

• Pile depth ( 70’ – 140’ )

23
(2) Times City Yangon – Myanmar
• By Crown Advanced Construction

• Times City Project

Figure (17) Times City Complex Figure (18) Times City Logo 24
 This buildings complex consists of eleven buildings in total

 Under construction since 2013

Figure (19) Buildings 1 to 6 Figure (20) Buildings 7,8 and 9


25
(1) Explanation of contraction joint by the Engineer
The width is about 1 ft and getting narrow to the inner direction. The
purpose of the contraction joint is to allow for horizontal movement while being
rigid against rotational and vertical movements.

Figure (21) Contraction Joint Figure (22) Explanation by Engineer


26
(2) Beams and Columns
The beam’s depth is about 2 meters and 1 m x 1 m column.

Figure (23) Beams Figure (24) Columns


27
(3) Before plastering work
Making the shear wall surface rough before plastering to get good
attachment for the plaster.

Figure (25) Wire Mesh


28
(4) Ethics and Safety
Safety is one of the important factors in construction.

Figure (26) Ethics Figure (27) Safety


29
(5) Fire Protection System
High-tech fire protecting system with some detector and sensor.

Figure (28) Fire Protection System Figure (29) Fire Resistance Curtain

30
(6) Light weight Brick
To reduce the weight of the building used in partition wall.

Figure (30) Light Weight Brick


31
(7) Swimming pool on the 6th floor
Use two methods of water proofing system and good water
circulation system for the swimming pool.

Figure (31) Swimming Pool Figure (32) Plantation on 6th Floor


32
(8) Glass Bridge
Three layers of glass. 85 feet long glass bridge.

Figure (33) Glass Bridge

33
Discussion
1. Site visited to Precast Concrete Construction and Times City Project on 21st
October, 2019.

2. Experienced about precast, high-rised R.C building and modern


construction techniques.

3. In precast construction site, the molding process is important for specific


panel dimension but it hasn’t been seen because of insufficient time.

4. It’s a big challenge for such a big project as Times City Project in concern
with the great management for the whole project.

34
Conclusion
This site visit has many advantages for students as the
precast construction could be widely used for the increasing population
and economic blooming in the future.