Location Participants Auditors RLs / Interfaces Audit time?

Day 天 Time 时间 Subject/Process 内容/过程 Reference 要求 Dept 部门 CSR(s) 顾客特殊要求


地点 参与者 审核员 支持场地 / 接口 审核时间?
Audit planning information verification Brose,Bosch,Hell,Magana,Kieker
1 0800 All ICT A N
审核策划信息确认 t, Mitsui

1 0900 Opening meeting 首次会议 All managers A, B, C


Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
Y
1 0930 Site tour 参观 A, B, C
Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
Y
Brose,Bosch,Hell,Magana,Kieker
1 1000 Management 4,5,6 Top QMR,MD A 20001473QSM, strategic planning
t, Mitsui
Y
2001473HR,train,IT,IA,Warrant Brose,Bosch,Hell,Magana,Kieker
1 1100 Performance Monitoring 9,10 QMR QMR A Y
y; 50150070HR,Train t, Mitsui

B:
assembly; B: assembly; Brose,Bosch,Hell,Magana,Kieker
1 1000 Manufacturing & Quality Control 8.1,8.5,8.6,8.7,10 B,C Y
C: ISO C: ISO assy. t, Mitsui

assy.
1 1300 Lunch 午餐 N
20001473 contract
Brose,Bosch,Hell,Magana,Kieker
1 1330 Order Management 8.1,8.2,9.1 A review,logistics; 50150070 t, Mitsui
Y
sales
C&S Brose,Bosch,Hell,Magana,Kieker
1 1300 Incoming Quality Control 8.4,8.5,8.6,8.7,10 C&S B 20001473, purchasing, supplier Y
machine t, Mitsui
Brose,Bosch,Hell,Magana,Kieker
1 1300 Manufacturing & Quality Control 8.1,8.5,8.6,8.7,10 ISO assy. ISO assy. C t, Mitsui
Y
Brose,Bosch,Hell,Magana,Kieker
1 t, Mitsui
1 1700 Summary 小结 QMR QMR ABC
Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
Y
1 1730 End of Day 当日结束 Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
N
Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
20001473 product/process
Brose,Bosch,Hell,Magana,Kieker
2 0900 Document Control 7.5,8.3 Module Module A design,R&D,Engineering; t, Mitsui
Y
50150026 R&D
20001473 Test,calibration; Brose,Bosch,Hell,Magana,Kieker
2 1100 Calibration & Control of Measurement Device 7.1 Module Module A Y
50150026 Lab, testing t, Mitsui

B: C&S;
B: C&S; C:
C: ISO Brose,Bosch,Hell,Magana,Kieker
2 0900 Manufacturing & Quality Control 8.1,8.5,8.6,8.7,10 ISO switch B,C Y
switch t, Mitsui
lines
lines
2 1300 Lunch 午餐 N
A:Module A:Module Brose,Bosch,Hell,Magana,Kieker
2 1400 Manufacturing & Quality Control 8.1,8.5,8.6,8.7,10 AB Y
B:C&S B:C&S t, Mitsui

2 1700 End of Day 当日结束 Brose,Bosch,Hell,Magana,Kieker


t, Mitsui
N
A: assy lines;
A: assy; Brose,Bosch,Hell,Magana,Kieker
2 1900 Manufacturing & Quality Control 8.1,8.5,8.6,8.7,10 B: C&S AB Y
B: C&S t, Mitsui
machine
2 2000 End of Day 当日结束 Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
N
Brose,Bosch,Hell,Magana,Kieker
2 t, Mitsui
Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
Brose,Bosch,Hell,Magana,Kieker
3 0900 Manufacturing & Quality Control 8.1,8.4,8.5,8.6,8.7,10 Actuator assymbly lines A t, Mitsui
Y
Brose,Bosch,Hell,Magana,Kieker
3 0900 Inbound & Material Stock-in 8.1,8.5,8.6,8.7,10 C&S C&S B t, Mitsui
Y
Brose,Bosch,Hell,Magana,Kieker
3 1100 Facilities Management 8.5 ADM ADM B 20001473 facility, equipment t, Mitsui
Y
3 1300 Lunch 午餐 Brose,Bosch,Hell,Magana,Kieker
t, Mitsui

CF152i_HK_Audit Plan_IATF Rev 2021-6-22 2/4


Brose,Bosch,Hell,Magana,Kieker
3 1330 Continual Improvement 6.9,10 QA QA AB t, Mitsui
Y
Brose,Bosch,Hell,Magana,Kieker
3 1330 Facilities Management 8.5 ADM ADM B 20001473 facility, equipment t, Mitsui
Y
Brose,Bosch,Hell,Magana,Kieker
3 t, Mitsui
Report Preparation 报告准备,Use of Logo & max 15% audit time Brose,Bosch,Hell,Magana,Kieker
3 1430 max15%time AB Y
marks 认证标志的使用 =3.6h(IATF) t, Mitsui

3 1630 Closing Meeting 末次会议 All managers AB


Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
Y
1730 End of Audit 结束 Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
Y
Brose,Bosch,Hell,Magana,Kieker
4 t, Mitsui
4 0800 Verification of previous NCs 上次不符合项的验证 10.2 QMR QMR A
Brose,Bosch,Hell,Magana,Kieker
t, Mitsui
N
4 1200 End of Day 当日结束 N
4
4
4
4
4
4

Information for Customers


- interactions to existing remote locations are audited in the corresponding processes
- Every production process is listed with the respective shift information
- The customer specific requirements are audited in the individual processes

Audit time per day (hours)


Lead auditor A Co-auditor B Co-auditor C Co-auditor D Co-auditor E
1. Day 8 8 8
2. Day 8 8 4
3. Day 8 8
4. Day
5. Day
Total 24 24 12

Audit time in production per day


1. Day 2 8
2. Day 4 8 4
3. Day 4
4. Day
5. Day
Total 8 10 12

CF152i_HK_Audit Plan_IATF Rev 2021-6-22 3/4