You are on page 1of 1

4 3 2 1

HOLD

470
D D
240
90°
Ø80

a
G

x
DE
W

y
AL
ER
BE

500

b
AM

500
C C

PLAN VIEW
SCALE 1:20

Index Description Designed By Site Engineer Date


Purushothaman Y
- Initial creation Ramakrishnan 20.04.2023

1 Issued for approval Vignesh Purushothaman Y 19.05.2023


Revised as per comments Purushothaman Y
2 and issued for approval Vignesh 26.06.2023
C C
± 0.00 ≙ 0 m üNN
All dimensions and services have to be confirmed on site.
This drawing is under copyright and is not to copied or presented to unauthorized parties
without special permission.

BAUER Spezialtiefbau GmbH


Hauptverwaltung
BAUER-Strasse 1
86529 Schrobenhausen
Telefon (08252)97-0
Telefax (08252)97-1359
www.bauer.de

Client Lanco Teesta Hydro Power Limited

Jaiprakash Associates Limited


Main Contractor

Project Teesta Hydroelectric Project


Stage-VI- Singtam, Sikkim, India.
A A
Drawing Anchor concrete pad detail for upper pile wall
(Zone-1).
NOTES:- .
Scale: Drawn by: Ramakrishnan. Date: 20.04.2023
1. ALL DIMENSION ARE IN MM UNLESS OTHERWISE SPECIFIED. 1:20
2. FOR ANCHOR HEAD AND ASSOCIATED DETAILS REFER LATEST DRAWING FROM ANCHOR VENDOR. Checked by: Purantharan. Date: 20.04.2023
3. FOR ALREADY EXECUTED WALER BEAM, DRILLED REBAR WITH CHEMICAL GROUT SHALL BE PROVIDED. DRG Size: 210 x 297
Agent: Purushothaman Y.
Site Engineer: Purushothaman Y.
Date: 20.04.2023
DIAMETER OF 16MM, NOS - 8, SHEAR FORCE = 80 kN PER REBAR.
4. CLEAR COVER 40MM, GRADE OF CONCRETE M35 & GRADE OF STEEL Fe 500 Project No. Plan Nr. T 21 01 05121 2