This document is a loss control tour report from the Drilling Services division of Oil and Natural Gas Corporation Ltd in Ahmedabad, India. It details 13 areas of observation at an unnamed oil drilling installation, including safety briefing status, crew personal protective equipment usage, safety signage and documentation, emergency response preparedness, and critical equipment status. No other details are provided about the specific findings or location. The report is signed by an executive to confirm the tour.
This document is a loss control tour report from the Drilling Services division of Oil and Natural Gas Corporation Ltd in Ahmedabad, India. It details 13 areas of observation at an unnamed oil drilling installation, including safety briefing status, crew personal protective equipment usage, safety signage and documentation, emergency response preparedness, and critical equipment status. No other details are provided about the specific findings or location. The report is signed by an executive to confirm the tour.
This document is a loss control tour report from the Drilling Services division of Oil and Natural Gas Corporation Ltd in Ahmedabad, India. It details 13 areas of observation at an unnamed oil drilling installation, including safety briefing status, crew personal protective equipment usage, safety signage and documentation, emergency response preparedness, and critical equipment status. No other details are provided about the specific findings or location. The report is signed by an executive to confirm the tour.
LOSS CONTROL TOUR LEVEL: DATE: NAME OF INSTALLATION:
S.N. DESCRIPTION OBSERVATION
1. Safety Briefing Status 2. Security Personal Alertness about safety 3. Safety and Other Display Boards 4. Whether all Crew in PPE 5. Mobile Deposit Box Available and maintained 6. Aesthetic look/ Panting status of Installation 7. Instruction and Handing over taking over Register Status 8. Tool Box Talk and JSA Status 9. Status of Different Mock Drills 10. Permit System Status 11. IM Diary, HSE & Workman Safety Observations 12. Status of Critical Equipment’s 1. BOP 2. Twin Stop Device 3. Remote control Units of BOP 4. Drillo Meter 5. Air intake shut off valve status 6. Fail Safe Braking System Status 7. Gas Detection System & Records 8. CCTV Status 13. Any other observations