REQUEST SECTION to be filled by Work Package Contractor (WPC) / Requestor
Name: Izzat Izzuddin Zulkepli Signature and Date:
Designation: Senior Site Engineer
Date of 20 August 2021 Time of Inspection: 10:00 am Inspection: Location: EASTERN CORRIDOR
DESCRIPTION OF WORKS for Inspection/Testing: References:
1st STAGE POST TENSIONING WORK FOR PIER P8-08 Work Method Statements: N/A Inspection and Test Plans: N/A PIC NAIM : 0173771077 Drawings: N/A Test Procedures: N/A Material Submission for Approval: N/A Others: N/A
INSPECTION SECTION to be filled by Supervising Consultant (S.C) / System Representative / Others
Name: Amiruddin Abdul Kadir Signature and Date: Designation: ARE
Status: Pass Pass with Comments Fail (Re-Inspect) Cancel
Supervising Consultant (SC)'s / System Representative / Others Comments:
WITNESS SECTION to be filled by MRCBGK (If Applicable)