INSPECTION MANUAL
PA-34-200T
Member
General Aviation
Manufacturers Association
2
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
INTRODUCTION
Piper Aircraft Corporation (Piper) takes a continuing interest in having the owner get the most efficient
use from his airplane, and keeping the airplane in the best mechanical condition. To that end, Piper
publishes a recurring maintenance schedule which is supplemented with Service Bulletins, Service
Letters and Service Spares Letters as required.
A. The Piper PA-34-200T Seneca II Service Manual (P/N 761-590) constitutes the Instructions for
Continued Airworthiness (ICA) in accordance with Federal Aviation Regulations (FAR) Part 23,
Appendix G. Therein, Section III contains the Inspection Program and the Airworthiness Limitations
are in Section I (and repeated herein, see page 13).
B. The recurring maintenance schedule for the PA-34-200T Seneca II is available in two forms:
(1) an Annual / 100 Hour Inspection Program, which is provided in Section III of the service
manual (and is available separately as P/N 230-856); and,
(2) this Progressive (50 Hour) Inspection Program.
NOTE: This inspection manual is not a stand-alone document. It constitutes a snapshot of the
Airworthiness Limitations and Inspection sections of the Instructions for Continued
Airworthiness (ICA) and is current only at the time of printing. Use it as follows:
(1) Owners/operators desiring to establish a Part 91 Progressive Inspection Program
(PIP) (see 91.409(d)) or a Part 135 Approved Aircraft Inspection Program (AAIP)
(see 135.419) should use this manual as a template for submission to the
appropriate FAA office.
(2) Service centers conducting Event Cycle inspections under a FAA-approved PIP
or AAIP can use this manual as a working check-off list/form, provided they verify
its currency against the FAA-approved PIP or AAIP.
C. Piper Service Bulletins are of special importance and Piper considers compliance mandatory.
D. Service Letters deal with product improvements and service hints pertaining to the affected aircraft.
Owners should give careful attention to service letter information so they can ensure their airplane
is properly serviced and kept up to date with the latest changes.
E. Service Spares Letters offer improved parts, kits and optional equipment which were not originally
available. These may be of interest to the owner.
F. Service Bulletins, Service Letters and Service Spares Letters are emailed to Piper Dealers/Service
Centers. Owners are encouraged to download these service publications from http://www.piper.com/.
NOTE: Piper mails flight manual (AFM / POH) revisions to the registered owner’s name and
address as shown on the Aircraft Registration Certificate. If the aircraft is based and/or
operated at a different location (or locations) and/or by a person (or persons) other than
those recorded on the aircraft registration, then the registered owner(s) is responsible for
forwarding these to the operating location(s) or person(s).
Changes in aircraft registration may take a substantial amount of time to be recorded by
the Federal Aviation Administration and received by Piper to change the mailing address.
Owners and operators should make arrangements to keep abreast of flight manual
revisions during this interim period through their Piper Dealer/Service Center.
Jul 31/09 3
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
The Federal Aviation Administration (FAA) publishes Airworthiness Directives (AD’s) that apply to
specific aircraft. They are mandatory changes and are to be complied within a time limit set by the
FAA. When an AD is issued, it is sent to the latest registered owner of the affected aircraft and also
to subscribers of their service. The owner is solely responsible for being aware of and complying
with airworthiness directives.
NOTE: A searchable database of AD’s is available on the FAA website. See the “Airworthiness
Directives” link at “www1.faa.gov”. Additionally, Avantext offers a free email notification
service for new AD’s as well as the last six weeks worth of AD’s at “www.avantext.com”.
Owners should periodically check with a Piper Dealer/Service Center to find out the latest
information to keep his aircraft up to date.
Service Bulletins, Service Letters, and Service Spares Letters are also available by subscription to
the Avantext TechPubs Maintenance Libraries for Piper Aircraft (see www.Avantext.com).
4 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
TABLE OF CONTENTS
SUBJECT PAGE
INTRODUCTION 3
PROGRAM RESPONSIBILITY 9
RECORD OF REVISIONS 11
AIRWORTHINESS LIMITATIONS 13
PROCEDURE 15
Description 15
Definitions 15
Inspection Requirements 17
Progressive Inspection Program 17
Overlimits Inspections 17
Progressive Inspection Procedure 18
Overview 18
Event Inspections 18
Completed Aircraft Inspection Cycle 19
Special Inspections Work Sheet 19
Away From Home Station Requirements 20
Program Responsibility 20
Revisions 20
Forms 21
Access and Inspection Provisions 21
Event Inspection Work Sheet - Event #1 23
Right Propeller, Routine 23
Right Engine, Routine 23
Right Turbocharger, Routine 24
Left Propeller, Detailed 24
Left Engine, Detailed 24
Left Turbocharger, Detailed 26
Cabin and Cockpit, Detailed 26
Fuselage and Empennage, Detailed 26
Right Wing, Detailed 28
Left Wing, Routine 28
Landing Gear, Routine 28
Special Inspections, As Required 29
Operational Inspection 29
General 29
Return to Service Certification 31
Inspection Discrepancy Report 32
Jul 31/09 5
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
SUBJECT PAGE
PROCEDURE (continued)
Event Inspection Work Sheet - Event #2 33
Left Propeller, Routine 33
Left Engine, Routine 33
Left Turbocharger, Routine 34
Right Propeller, Detailed 34
Right Engine, Detailed 34
Right Turbocharger, Detailed 36
Cabin and Cockpit, Routine 36
Fuselage and Empennage, Routine 36
Left Wing, Detailed 36
Right Wing, Routine 37
Landing Gear, Detailed 37
Special Inspections, As Required 39
Operational Inspection 39
General 39
Return to Service Certification 41
Inspection Discrepancy Report 42
Event Inspection Work Sheet - Event #3 43
Right Propeller, Routine 43
Right Engine, Routine 43
Right Turbocharger, Routine 44
Left Propeller, Detailed 44
Left Engine, Detailed 44
Left Turbocharger, Detailed 46
Cabin and Cockpit, Detailed 46
Fuselage and Empennage, Detailed 46
Right Wing, Detailed 48
Left Wing, Routine 48
Landing Gear, Routine 48
Special Inspections, As Required 49
Operational Inspection 49
General 49
Return to Service Certification 51
Inspection Discrepancy Report 52
6 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
SUBJECT PAGE
SAMPLE FORMS 73
Program Responsibility 73
Record of Revisions 75
Event Inspection Record 77
Progressive Inspection Cycle Record 79
Discrepancy Record 81
Service Publication Compliance Record 83
FAA Airworthiness Directives (AD) Compliance Record 85
Equipment Change and Overhaul Record 87
Jul 31/09 7
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
8 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
PROGRAM RESPONSIBILITY
The person responsible for scheduling the inspections required under this program must enter his or her
name below and forward the original copy of this form to their local FAA-FSDO. A duplicate copy should be
maintained in this manual.
Name:
Address:
Telephone Number:
Any change in personnel responsible for scheduling the inspection program, will be added with the
appropriate information on a separate sheet of paper and the original copy sent to the local FAA-FSDO, while
a duplicate copy is attached behind this page. The previous information sheet will be left in the booklet and
the word "CHANGED" will be written across the deleted information.
Jul 31/09 9
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
10 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Revisions to this Inspection Program are the direct responsibility of the manufacturer. However,
owners/operators with an FAA-approved Part 91 Progressive Inspection Program or a Part 135 Approved
Aircraft Inspection Program may not enact any such revisions until approval is obtained from the responsible
FAA-FSDO. A permanent record of revisions and FAA approvals will be maintained by the owner/operator.
RECORD OF REVISIONS
Jul 31/09 11
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
12 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
AIRWORTHINESS LIMITATIONS
NOTE: The Airworthiness Limitations section of the Instructions for Continued Airworthiness (ICA) is
FAA approved and specifies maintenance required under §§ 43.16 and 91.403 of the Federal
Aviation Regulations unless an alternative program has been FAA approved. The following
repeats that information from the currently published ICA.
1. Limitations (PIR-TCDS A7SO, Rev. 17.)
NOTE: Refer to the LIMITATIONS section in the Airplane Flight Manual or Pilot’s Operating Handbook
for a detailed delineation of the flight limitations of the airplane.
The following limitations related to fatigue life of the airplane and its components have been established
for the PA-34-200T Seneca II airplanes:
The bolt and stack-up that connect the upper drag link to the nose gear trunnion are required to be
replaced every 500 hours time-in-service. The part numbers are as follows:
A. P/N 400-274 (AN7-35) bolt or P/N 693-215 (NAS6207-50D) bolt;
B. P/N 407-591 (AN960-716L) washer, as applicable;
C. P/N 407-568 (AN 960-716) washer, as applicable;
D. P/N 404-396 (AN 320-7) nut; and
E. P/N 424-085 cotter pin.
2. Inspections
Refer to Section III for Piper’s recommended Inspection Programs.
3. Major Repairs to Life Limited Components
Major repairs to areas defined in FAR Part 43, Appendix A, must be shown, using approved data, to not
diminish the Life of the component as stated herein.
4. Life Limited Parts Marking and Disposition
14 CFR Part 43.10, Disposition of Life-Limited Aircraft Parts requires that proper procedures are
followed when removing life limited parts with time and/or cycles remaining on them as well as the
disposition of life limited parts with no time and/or cycles left. Life limited parts defined by Type
Certificate (TC) are listed in paragraph 1, above. Other parts which are replaced or rebuilt at specified
intervals are listed in Section III.
A. Parts that are removed prior to accumulating their life limit, are to be marked with indelible ink or
marker with the part number, serial number and accumulated life status as defined in 14 CFR Part
43.10 in a manner that does not affect part structural integrity, i.e. - no surface deformation such as
vibration/etching allowed.
B. Parts that have accumulated the life limit shall be disposed of in accordance with the applicable
FARs. Piper recommends life limited parts with no time and/or cycles remaining be completely
destroyed.
Jul 31/09 13
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
14 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
PROCEDURE
1. Description
WARNING: FAILURE TO CONSULT APPLICABLE VENDOR PUBLICATION(S), WHEN SERVICING
OR INSPECTING VENDOR EQUIPMENT INSTALLED IN PIPER AIRCRAFT, MAY
RENDER THE AIRCRAFT UNAIRWORTHY. (SEE SERVICE MANUAL - INTRODUCTION -
SUPPLEMENTARY PUBLICATIONS.)
The recurring maintenance schedule for the PA-34-200T Seneca II is provided herein as a 50 Hour
Progressive Inspection Program. Successful compliance with this inspection program requires reference
to the latest revision of the PA-34-200T Seneca II Service Manual (i.e., the Instructions for Continued
Airworthiness (ICA)) P/N 761-590 available exclusively by subscription from Avantext, Inc. References to
Paragraph (i.e. - paragraph 2-67) or Section (i.e., Section III) throughout this inspection manual are to
the corresponding entries in the service manual - with the exception of Section III, paragraph 8, which is
reproduced herein as the Special Inspections Work Sheet.
Piper Progressive Inspection Programs comply with the FAA Federal Aviation Regulations Parts 43, 91
and 135. The owner/operator is primarily responsible for maintaining the airplane in an airworthy
condition, including compliance with all applicable Airworthiness Directives and conformity with the
requirements in FAR 91.409, 91.411 and 91.413.
The first overhaul or replacement of components should be performed at the given periods. The
condition of various components can then be used as criteria for determining subsequent periods
applicable to the individual airplane, depending on usage, providing the owner/operator has an
established Part 91 Progressive Inspection Program (see 91.409(d)) or Part 135 Approved Aircraft
Inspection Program (see 135.419).
The time periods given for inspections of various components are based on average usage and
environmental conditions.
NOTE: The listed inspection, overhaul and replacement schedules do not guarantee that a particular
item or component will reach the listed time without malfunction. Unique operating conditions
encountered by individual airplanes cannot be controlled by the manufacturer.
2. Definitions
A. Inspections - Must be performed only by persons authorized by the FAA who are qualified on this
aircraft, using acceptable methods, techniques and practices to determine physical condition and detect
defects.
(1) Routine Inspection - Consists of a visual examination or check of the aircraft and its
components and systems without disassembly.
(2) Detailed Inspection - Consists of a thorough examination of the appliances, the aircraft and the
components and systems with such disassembly as is necessary to determine condition.
(3) Special Inspection - Involves those components, systems or structure which by their
application or intended use require an inspection peculiar to, more extensive in scope or at a
time period other than that which is normally accomplished during the event inspection.
B. Checks - Can be performed by pilots and/or mechanics who are qualified on this aircraft and consist
of examinations in the form of comparisons with stated standards for the purpose of verifying
condition, accuracy and tolerances.
C. Approved Inspection - Means a continuing airworthiness inspection of an airplane and its various
components and systems, at scheduled intervals, in accordance with procedures approved by the
FAA under FAR Part 91.409(d) or Part 135.419.
Jul 31/09 15
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
16 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
3. Inspection Requirements
WARNING: INSTRUCTIONS FOR CONTINUED AIRWORTHINESS (ICA) FOR ALL NON-PIPER
APPROVED STC INSTALLATIONS ARE NOT INCLUDED IN THIS MANUAL. WHEN A
NON-PIPER APPROVED STC INSTALLATION IS INCORPORATED ON THE AIRPLANE,
THOSE PORTIONS OF THE AIRPLANE AFFECTED BY THE INSTALLATION MUST BE
INSPECTED IN ACCORDANCE WITH THE ICA PUBLISHED BY THE OWNER OF THE
STC. SINCE NON-PIPER APPROVED STC INSTALLATIONS MAY CHANGE SYSTEMS
INTERFACE, OPERATING CHARACTERISTICS AND COMPONENT LOADS OR
STRESSES ON ADJACENT STRUCTURES, THE PIPER PROVIDED ICA MAY NOT BE
VALID FOR AIRPLANES SO MODIFIED.
A. Progressive Inspection Program
The Piper Progressive Inspection Program complies with the FAA Federal Aviation Regulations
(FAR) Parts 43, 91 and 135 for progressive inspections. The owner/operator is primarily responsible
for maintaining the airplane in an airworthy condition, including compliance with all applicable
Airworthiness Directives and conformity with the requirements in FAR 91.409, 91.411 and 91.413.
The complete cycle inspection consists of four (4) 50 Hour Events, which provides for a complete
aircraft inspection in 200 aircraft flying hours. The complete inspection, Events (1), (2), (3) and (4),
must be completed within twelve (12) calendar months. Inspections must be accomplished by
persons authorized by the FAA.
The Progressive Inspection Program is designed to permit best utilization of the aircraft through the
use of a planned inspection schedule. This schedule is contained herein (i.e., paragraph 4). Refer to
the Piper Customer Service Information File (P/N 1753-755) revision checklist to ensure you have
the latest issue.
NOTE: This publication, the PA-34-200T Seneca II 50 Hour Progressive Inspection Manual (P/N
761-592), is not a stand-alone document. The Progressive Inspection Manual constitutes a
snapshot of the Airworthiness Limitations and Inspection sections of the Instructions for
Continued Airworthiness (ICA) and is current only at the time of printing. Use it as follows:
(1) Owners/operators desiring to establish a Part 91 Progressive Inspection Program
(PIP) (see 91.409(d)) or a Part 135 Approved Aircraft Inspection Program (AAIP) (see
135.419) should use this publication as a template for submission to the appropriate
FAA office.
(2) Service centers conducting Event Cycle inspections under a FAA-approved PIP or
AAIP can use this publication as a working check-off list/form, provided they verify its
currency against the FAA-approved PIP or AAIP.
B. Overlimits Inspections
If the airplane has been operated so that any of its components have exceeded their maximum
operational limits, special inspections may be required by Piper and/or the component
manufacturer. See Section III, Unscheduled Maintenance.
Jul 31/09 17
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
18 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 19
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
20 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 21
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
22 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 23
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
24 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
11. Check condition of spark plugs. (Clean and adjust gap as required, see Note 9.)
NOTE: If fouling of spark plugs is apparent, rotate bottom plugs to upper plugs.
12. Check cylinder compression. (See Note 7.)
13. Inspect ignition harness and insulators for security of mounting, tight connections, high tension
leakage and continuity. (See Notes 9 and 23.)
14. Check magneto points for proper clearance. (Maintain clearance at 0.018 +006.) (See Note 9.)
15. Inspect magnetos. (See Note 18).
16. Check breaker felts for proper lubrication.
17. Check magnetos to engine timing.
18. Remove induction air filter and tap gently to remove dirt particles. (Replace as required.)
19. Clean injector nozzles as required. (Clean with acetone only.)
20. Replace the pressure system inlet air filter (i.e., central air filter, gyro filter, etc.) element. (See Note 13.)
21. Remove induction air box valve and inspect for evidence of excessive wear or cracks. Replace
defective parts.
22. Inspect fuel injector attachments for loose hardware.
23. Inspect engine primer system for operation, security, and leaks.
24. Check intake seals for leaks and clamps for tightness.
25. Inspect all air inlet duct hoses. (Replace as required.)
26. Inspect condition of flexible fuel lines.
27. Inspect fuel system for leaks. (See Note 17.)
28. Inspect engine-driven and electric fuel pumps for condition and operation. Replace as required.
(See Note 12.)
29. Inspect dry-air pressure pumps for condition and operation, and security of lines. (See paragraph
10-16a.)
30. Check throttle, alternate air, mixture and propeller governor controls for security, travel and
operating condition.
31. Inspect exhaust stacks, connections and gaskets. (Replace gaskets as required.)
33. Inspect breather tubes for obstructions and security.
34. Inspect crankcase for cracks, leaks and security of seam bolts.
35. Inspect engine mounts for cracks and loose mountings.
36. Check rubber ending mount bushings for deterioration. (Replace as required.)
37. Inspect all engine baffles for condition and security.
38. Inspect firewall seals.
39. Inspect condition of alternator and starter.
39. Inspect all lines, air ducts, electrical leads and engine attachments for security, proper routing,
chafing, cracks, deterioration and correct installation.
40. Check air conditioning compressor oil level.
41. Check condition and tension of compressor drive belt. (Refer to Service Manual, Section XIV.)
42. Check security of compressor mounting.
43. Inspect compressor clutch security and condition of wiring.
44. Lubricate all controls. (See Section II.)
45. Inspect and clean oil pressure relief valve.
46. Inspect engine set-up per TCM SID97-3C or later. (See also paragraph 8-60.)
Jul 31/09 25
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
26 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 27
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
28 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 29
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
30 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
INSPECTION COMPLETED
Jul 31/09 31
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
32 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 33
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
34 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
11. Check condition of spark plugs. (Clean and adjust gap as required, see Note 9.)
NOTE: If fouling of spark plugs is apparent, rotate bottom plugs to upper plugs.
12. Check cylinder compression. (See Note 7.)
13. Inspect ignition harness and insulators for security of mounting, tight connections, high tension
leakage and continuity. (See Notes 9 and 23.)
14. Check magneto points for proper clearance. (Maintain clearance at 0.018 +006.) (See Note 9.)
15. Inspect magnetos. (See Note 18).
16. Check breaker felts for proper lubrication.
17. Check magnetos to engine timing.
18. Remove induction air filter and tap gently to remove dirt particles. (Replace as required.)
19. Clean injector nozzles as required. (Clean with acetone only.)
20. Replace the pressure system inlet air filter (i.e., central air filter, gyro filter, etc.) element. (See Note 13.)
21. Remove induction air box valve and inspect for evidence of excessive wear or cracks. Replace
defective parts.
22. Inspect fuel injector attachments for loose hardware.
23. Inspect engine primer system for operation, security, and leaks.
24. Check intake seals for leaks and clamps for tightness.
25. Inspect all air inlet duct hoses. (Replace as required.)
26. Inspect condition of flexible fuel lines.
27. Inspect fuel system for leaks. (See Note 17.)
28. Inspect engine-driven and electric fuel pumps for condition and operation. Replace as required.
(See Note 12.)
29. Inspect dry-air pressure pumps for condition and operation, and security of lines. (See paragraph
10-16a.)
30. Check throttle, alternate air, mixture and propeller governor controls for security, travel and
operating condition.
31. Inspect exhaust stacks, connections and gaskets. (Replace gaskets as required.)
33. Inspect breather tubes for obstructions and security.
34. Inspect crankcase for cracks, leaks and security of seam bolts.
35. Inspect engine mounts for cracks and loose mountings.
36. Check rubber ending mount bushings for deterioration. (Replace as required.)
37. Inspect all engine baffles for condition and security.
38. Inspect firewall seals.
39. Inspect condition of alternator and starter.
39. Inspect all lines, air ducts, electrical leads and engine attachments for security, proper routing,
chafing, cracks, deterioration and correct installation.
40. Check air conditioning compressor oil level.
41. Check condition and tension of compressor drive belt. (Refer to Service Manual, Section XIV.)
42. Check security of compressor mounting.
43. Inspect compressor clutch security and condition of wiring.
44. Lubricate all controls. (See Section II.)
45. Inspect and clean oil pressure relief valve.
46. Inspect engine set-up per TCM SID97-3C or later. (See also paragraph 8-60.)
Jul 31/09 35
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
36 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
12. Inspect wing aft rib assembly, WS 49.25., per paragraph 4-16a.
13. Inspect wing fore and aft attach fittings, and bolts, for security, corrosion and condition.
14. Retorque wing aft spar attach bolts per paragraph 4-16b.
15. Inspect fuel tanks and lines for leaks and water.
16. Remove, drain and clean fuel filter bowls.
17. Inspect fuel tanks for minimum octane and capacity markings.
18. Inspect fuel tank vents.
19. Inspect all control cables, air ducts, electrical leads, lines, and attaching parts for security, routing,
chafing, deterioration, wear, and correct installation.
20. Install inspection plates and fairings.
RIGHT WING, ROUTINE
1. Inspect wing surfaces and tips for damage and loose rivets.
2. Lubricate per Lubrication Chart, Section II.
3. Remove, drain and clean fuel filter bowls.
LANDING GEAR, DETAILED
NOTE: The following inspections incorporate the requirements of Piper Service Bulletin (PSB) No.
1123B. Any later revisions to PSB No. 1123 must be complied with separately. See also
AD 2005-13-16.
1. Check oleo struts for proper extension and evidence of fluid leakage. (See Oleo Struts, Section II.)
2. Inspect wheel alignment, if required.
3. Put airplane on jacks per Section II.
4. Inspect tires for cuts, uneven or excessive wear and slippage.
5. Remove wheel, clean, check and repack bearings.
6. Inspect wheels for cracks, corrosion and broken bolts.
7. Check tire pressure per Table II-I.
8. Inspect brake linings and discs for condition and wear. (Refer to paragraph 7-52.)
9. Inspect brake backing plates.
10. Inspect brake lines and retaining clamps.
11. Inspect condition of nose gear centering spring and bungees.
12. Inspect gear forks for damage.
13. Inspect nose and main gear actuators.
14. Inspect main gear trunnion assembly for condition. (See Note 11.)
15. Inspect main gear trunnion pin. Replace, if necessary.
16. Inspect hydraulic lines, electrical leads, and attaching parts for condition and security (i.e. - routing,
chafing, damage, wear, etc.)
17. Inspect drag and side brace link bolts. (Replace as required.)
18. Inspect gear doors and attachments for condition and security.
19. Inspect gear warning horn and light for operation.
20. Retract gear - check operation.
21. Retract gear - inspect doors for clearance and operation.
22. With gear retracted, check “Free Fall” valve operation.
23. Inspect operation of squat switch.
24. Inspect down lock switches, up switches, and electrical leads for security.
25. Check downlocks for operation and adjustment.
Jul 31/09 37
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
38 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 39
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
40 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
INSPECTION COMPLETED
Jul 31/09 41
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
42 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 43
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
44 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
11. Check condition of spark plugs. (Clean and adjust gap as required, see Note 9.)
NOTE: If fouling of spark plugs is apparent, rotate bottom plugs to upper plugs.
12. Check cylinder compression. (See Note 7.)
13. Inspect ignition harness and insulators for security of mounting, tight connections, high tension
leakage and continuity. (See Notes 9 and 23.)
14. Check magneto points for proper clearance. (Maintain clearance at 0.018 +006.) (See Note 9.)
15. Inspect magnetos. (See Note 18).
16. Check breaker felts for proper lubrication.
17. Check magnetos to engine timing.
18. Remove induction air filter and tap gently to remove dirt particles. (Replace as required.)
19. Clean injector nozzles as required. (Clean with acetone only.)
20. Replace the pressure system inlet air filter (i.e., central air filter, gyro filter, etc.) element. (See Note 13.)
21. Remove induction air box valve and inspect for evidence of excessive wear or cracks. Replace
defective parts.
22. Inspect fuel injector attachments for loose hardware.
23. Inspect engine primer system for operation, security, and leaks.
24. Check intake seals for leaks and clamps for tightness.
25. Inspect all air inlet duct hoses. (Replace as required.)
26. Inspect condition of flexible fuel lines.
27. Inspect fuel system for leaks. (See Note 17.)
28. Inspect engine-driven and electric fuel pumps for condition and operation. Replace as required.
(See Note 12.)
29. Inspect dry-air pressure pumps for condition and operation, and security of lines. (See paragraph
10-16a.)
30. Check throttle, alternate air, mixture and propeller governor controls for security, travel and
operating condition.
31. Inspect exhaust stacks, connections and gaskets. (Replace gaskets as required.)
33. Inspect breather tubes for obstructions and security.
34. Inspect crankcase for cracks, leaks and security of seam bolts.
35. Inspect engine mounts for cracks and loose mountings.
36. Check rubber ending mount bushings for deterioration. (Replace as required.)
37. Inspect all engine baffles for condition and security.
38. Inspect firewall seals.
39. Inspect condition of alternator and starter.
39. Inspect all lines, air ducts, electrical leads and engine attachments for security, proper routing,
chafing, cracks, deterioration and correct installation.
40. Check air conditioning compressor oil level.
41. Check condition and tension of compressor drive belt. (Refer to Service Manual, Section XIV.)
42. Check security of compressor mounting.
43. Inspect compressor clutch security and condition of wiring.
44. Lubricate all controls. (See Section II.)
45. Inspect and clean oil pressure relief valve.
46. Inspect engine set-up per TCM SID97-3C or later. (See also paragraph 8-60.)
Jul 31/09 45
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
46 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 47
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
48 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 49
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
50 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
INSPECTION COMPLETED
Jul 31/09 51
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
52 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 53
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
54 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
11. Check condition of spark plugs. (Clean and adjust gap as required, see Note 9.)
NOTE: If fouling of spark plugs is apparent, rotate bottom plugs to upper plugs.
12. Check cylinder compression. (See Note 7.)
13. Inspect ignition harness and insulators for security of mounting, tight connections, high tension
leakage and continuity. (See Notes 9 and 23.)
14. Check magneto points for proper clearance. (Maintain clearance at 0.018 +006.) (See Note 9.)
15. Inspect magnetos. (See Note 18).
16. Check breaker felts for proper lubrication.
17. Check magnetos to engine timing.
18. Remove induction air filter and tap gently to remove dirt particles. (Replace as required.)
19. Clean injector nozzles as required. (Clean with acetone only.)
20. Replace the pressure system inlet air filter (i.e., central air filter, gyro filter, etc.) element. (See Note 13.)
21. Remove induction air box valve and inspect for evidence of excessive wear or cracks. Replace
defective parts.
22. Inspect fuel injector attachments for loose hardware.
23. Inspect engine primer system for operation, security, and leaks.
24. Check intake seals for leaks and clamps for tightness.
25. Inspect all air inlet duct hoses. (Replace as required.)
26. Inspect condition of flexible fuel lines.
27. Inspect fuel system for leaks. (See Note 17.)
28. Inspect engine-driven and electric fuel pumps for condition and operation. Replace as required.
(See Note 12.)
29. Inspect dry-air pressure pumps for condition and operation, and security of lines. (See paragraph
10-16a.)
30. Check throttle, alternate air, mixture and propeller governor controls for security, travel and
operating condition.
31. Inspect exhaust stacks, connections and gaskets. (Replace gaskets as required.)
33. Inspect breather tubes for obstructions and security.
34. Inspect crankcase for cracks, leaks and security of seam bolts.
35. Inspect engine mounts for cracks and loose mountings.
36. Check rubber ending mount bushings for deterioration. (Replace as required.)
37. Inspect all engine baffles for condition and security.
38. Inspect firewall seals.
39. Inspect condition of alternator and starter.
39. Inspect all lines, air ducts, electrical leads and engine attachments for security, proper routing,
chafing, cracks, deterioration and correct installation.
40. Check air conditioning compressor oil level.
41. Check condition and tension of compressor drive belt. (Refer to Service Manual, Section XIV.)
42. Check security of compressor mounting.
43. Inspect compressor clutch security and condition of wiring.
44. Lubricate all controls. (See Section II.)
45. Inspect and clean oil pressure relief valve.
46. Inspect engine set-up per TCM SID97-3C or later. (See also paragraph 8-60.)
Jul 31/09 55
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
56 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
12. Inspect wing aft rib assembly, WS 49.25., per paragraph 4-16a.
13. Inspect wing fore and aft attach fittings, and bolts, for security, corrosion and condition.
14. Retorque wing aft spar attach bolts per paragraph 4-16b.
15. Inspect fuel tanks and lines for leaks and water.
16. Remove, drain and clean fuel filter bowls.
17. Inspect fuel tanks for minimum octane and capacity markings.
18. Inspect fuel tank vents.
19. Inspect all control cables, air ducts, electrical leads, lines, and attaching parts for security, routing,
chafing, deterioration, wear, and correct installation.
20. Install inspection plates and fairings.
RIGHT WING, ROUTINE
1. Inspect wing surfaces and tips for damage and loose rivets.
2. Lubricate per Lubrication Chart, Section II.
3. Remove, drain and clean fuel filter bowls.
LANDING GEAR, DETAILED
NOTE: The following inspections incorporate the requirements of Piper Service Bulletin (PSB) No.
1123B. Any later revisions to PSB No. 1123 must be complied with separately. See also
AD 2005-13-16.
1. Check oleo struts for proper extension and evidence of fluid leakage. (See Oleo Struts, Section II.)
2. Inspect wheel alignment, if required.
3. Put airplane on jacks per Section II.
4. Inspect tires for cuts, uneven or excessive wear and slippage.
5. Remove wheel, clean, check and repack bearings.
6. Inspect wheels for cracks, corrosion and broken bolts.
7. Check tire pressure per Table II-I.
8. Inspect brake linings and discs for condition and wear. (Refer to paragraph 7-52.)
9. Inspect brake backing plates.
10. Inspect brake lines and retaining clamps.
11. Inspect condition of nose gear centering spring and bungees.
12. Inspect gear forks for damage.
13. Inspect nose and main gear actuators.
14. Inspect main gear trunnion assembly for condition. (See Note 11.)
15. Inspect main gear trunnion pin. Replace, if necessary.
16. Inspect hydraulic lines, electrical leads, and attaching parts for condition and security (i.e. - routing,
chafing, damage, wear, etc.)
17. Inspect drag and side brace link bolts. (Replace as required.)
18. Inspect gear doors and attachments for condition and security.
19. Inspect gear warning horn and light for operation.
20. Retract gear - check operation.
21. Retract gear - inspect doors for clearance and operation.
22. With gear retracted, check “Free Fall” valve operation.
23. Inspect operation of squat switch.
24. Inspect down lock switches, up switches, and electrical leads for security.
25. Check downlocks for operation and adjustment.
Jul 31/09 57
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
58 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 59
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
60 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
INSPECTION COMPLETED
Jul 31/09 61
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
62 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
NOTES
(Sheet 1 of 2)
1. Refer to Piper's Customer Service Information File (P/N 1753-755) for latest revision dates to Piper
Inspection Reports/Manuals and the PA-34-200T Service Manual, P/N 761-590. References to Section
are to the appropriate Section in the service manual.
WARNING: INSTRUCTIONS FOR CONTINUED AIRWORTHINESS (ICA) FOR ALL NON-PIPER
APPROVED STC INSTALLATIONS ARE NOT INCLUDED IN THIS MANUAL. WHEN A
NON-PIPER APPROVED STC INSTALLATION IS INCORPORATED ON THE AIRPLANE,
THOSE PORTIONS OF THE AIRPLANE AFFECTED BY THE INSTALLATION MUST BE
INSPECTED IN ACCORDANCE WITH THE ICA PUBLISHED BY THE OWNER OF THE
STC. SINCE NON-PIPER APPROVED STC INSTALLATIONS MAY CHANGE SYSTEMS
INTERFACE, OPERATING CHARACTERISTICS AND COMPONENT LOADS OR
STRESSES ON ADJACENT STRUCTURES, THE PIPER PROVIDED ICA MAY NOT BE
VALID FOR AIRPLANES SO MODIFIED.
2. Inspections or operations are to be performed as indicated in each 50 hour inspection event. Inspections
or operations (i.e., component overhauls/replacements, etc.) required outside the 50 hour cycle are
listed as special inspections in the Special Inspections Work Sheet. Inspections must be accomplished
by persons authorized by the FAA.
NOTE: A log book entry should be made upon completion of any inspections.
3. Piper Service Bulletins are of special importance and Piper considers compliance mandatory. In all cases,
see Service Bulletin/Service Letter Index P/N 762-332 to verify latest revision. See also Table III-II.
4. Piper Service Letters are product improvements and service hints pertaining to servicing the airplane
and should be given careful attention.
5. Inspections given for the power plant are based on the engine manufacturer’s operator’s manual (TCM
P/N X30583) for this airplane. Any changes issued to the engine manufacturer’s operator’s manual shall
supersede or supplement the inspections outlined in this report.
6. Verify compliance with Piper Service Bulletin No. 1113.
7. Refer to the latest revision of Continental Motors Service Bulletin M73-19.
8. Not used.
9. For operation at higher altitudes (12,000 feet and up), more frequent ignition system maintenance is
required. (Refer to the latest revision of Continental Service Bulletin M78-8.)
10. For airplanes which have not complied with Part II of Piper Service Bulletin No. 956 or completed the
hardware replacement in paragraph 7-24b, each 100 hours time-in-service, inspect the Main Landing
Gear Trunnion Attach Fittings Hardware per paragraph 7-24a.
Jul 31/09 63
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
NOTES
(Sheet 2 of 2)
CAUTION: IF TIME-IN-SERVICE FOR MAIN GEAR TRUNNION ASSEMBLIES OTHER THAN P/N’S
67926-030 OR 67926-032 (LEFT) AND 67926-031 OR 67926-033 (RIGHT) (EACH
EMBOSSED WITH FORGING NUMBER 02599-2) CANNOT BE DETERMINED, THEN
THOSE MAIN GEAR TRUNNION ASSEMBLIES MUST BE REPLACED BEFORE FURTHER
FLIGHT.
11. For airplanes which have not installed new main landing gear trunnion assemblies P/N’s 67926-030 or
67926-032 (Left) and 67926-031 or 67926-033 (Right) (each embossed with forging number 02599-2) per
Piper Service Bulletin No. 787C; and, have accumulated 500 hours time-in-service on one or both of the
installed main landing gear trunnion assemblies: perform Main Gear Trunnion Assembly Dye-Penetrant
Inspection, Section VII, on one or both trunnion assemblies, as required.
12. Replace engine-driven fuel pump at engine overhaul.
13. Early Seneca II’s had inline filters in the cabin; later airplanes have a filter located in each nacelle.
14. Refer to Section V, paragraph 5-34 for allowable rudder tab and trim free play.
15. Maintain cable tensions specified in Section V.
16. Replacement brushes are no longer available. When brushes wear out, replace the Prestolite pump with a
new Oildyne pump.
17. See also AD 78-21-03.
18. For airplanes equipped with TCM/Bendix Magnetos: inspect magneto(s) per the procedures in the Periodic
Maintenance section of the applicable Service Support Manual, available from Teledyne Continental Motors,
Inc., PH: (800) 718-3411, or http://www.tcmlink.com/.
19. The compressor oil level should not be checked unless a Freon leak has occurred which requires an addition
of Freon to the system.
20. Not Used.
21. Not Used.
22. Refer to flight manual supplement for preflight and flight check, for intended function in all modes.
23. Refer to the latest revision of Bendix Service Bulletin 612 for inspection of magnetos and ignition harness.
24. Refer to Teledyne Continental Service Bulletin M86-11, latest revision.
25. Not used.
26. Flexible hose replacement times are in-service times. In-service must be determined by (1) the date the
aircraft was licensed, if new or (2) the date entered in the logbook for the replacement hose placed in service.
Do not use the date stamped on the hose, as time may be included for shelf life, and not in-service use.
27. Not used.
28. Examine cables for broken strands by wiping them with a cloth for their entire length. Visually inspect the
cable thoroughly for damage not detected by the cloth. Replace any damaged or frayed cables.
(a) See Special Inspections, Procedures, Control Cable Inspection, or the latest edition of FAA AC 43.13-1.
(b) At fifteen (15) years time-in-service, begin Cable Fittings 100 Hour Special Inspection. See Special
Inspections, Procedures, Control Cable Inspection, below.
64 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
(Sheet 1 of 8)
Jul 31/09 65
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
(Sheet 2 of 8)
66 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
(Sheet 3 of 8)
Jul 31/09 67
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
(Sheet 4 of 8)
68 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
(Sheet 5 of 8)
Jul 31/09 69
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
(Sheet 6 of 8)
70 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
(Sheet 7 of 8)
Jul 31/09 71
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
(Sheet 8 of 8)
72 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
PROGRAM RESPONSIBILITY
The person responsible for scheduling the inspections required under this program must enter his or her
name below and forward the original copy of this form to their local FAA-FSDO. A duplicate copy should be
maintained in this manual.
Name:
Address:
Telephone Number:
Any change in personnel responsible for scheduling the inspection program, will be added with the
appropriate information on a separate sheet of paper and the original copy sent to the local FAA-FSDO, while
a duplicate copy is attached behind this page. The previous information sheet will be left in the booklet and
the word "CHANGED" will be written across the deleted information.
Jul 31/09 73
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
74 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Revisions to this Inspection Program are the direct responsibility of the manufacturer. However,
owners/operators with an FAA-approved Part 91 Progressive Inspection Program or a Part 135 Approved
Aircraft Inspection Program may not enact any such revisions until approval is obtained from the responsible
FAA-FSDO. A permanent record of revisions and FAA approvals will be maintained by the owner/operator.
RECORD OF REVISIONS
Jul 31/09 75
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
76 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
1. Proper inspection procedures are the responsibility of the individuals performing the inspection and must
be made in accordance with all applicable current Federal Aviation Regulations and Piper Service
Manuals and Publications.
2. Work order column is applicable only to FAA approved repair stations.
3. Always check for and use only current information.
4. The signatures below signify that this aircraft has been thoroughly inspected and found airworthy in
accordance with applicable and current FAR’s, Piper Service Manual and Service Publications (including
Service Bulletins and Mandatory Service Letters). Further, the signatures verify that all appropriate
entries have been made in Aircraft and Engine Logbooks and Progressive Inspection Program Records
(i.e., Event Inspection Record, Progressive Inspection Cycle Record, Discrepancy Record, Service
Publication Compliance Record, FAA AD Compliance Record, and Equipment Change and Overhaul
Record).
Event No. A/C Hours Date W.O. No. Signature - Certificate No.
1 50 HR
2 100 HR
3 150 HR
4 200 HR
1 50 HR
2 100 HR
3 150 HR
4 200 HR
1 50 HR
2 100 HR
3 150 HR
4 200 HR
1 50 HR
2 100 HR
3 150 HR
4 200 HR
1 50 HR
2 100 HR
3 150 HR
4 200 HR
Jul 31/09 77
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
78 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
1. Current and correct Pilot’s Operating Handbook or Airplane Flight Manual is in the aircraft.
2. Aircraft and Engine Logbooks are in the aircraft and appropriate entries made in these logbooks.
3. Registration certificate is in the aircraft and properly displayed.
4. Airworthiness certificate in aircraft and properly displayed.
5. Aircraft Equipment List, Weight and Balance and FAA Form 337 (if applicable) are in the aircraft and in
proper order.
6. Applicable FAA Airworthiness Directives are complied with.
7. Piper Progressive Inspection Records in order and properly signed off.
8. Outstanding conditions have been corrected as listed on condition record.
Jul 31/09 79
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
80 Jul 31/09
Jul 31/09
DISCREPANCY A/C SIGNATURE DATE CORRECTIVE ACTION W.O.# SIGNATURE AND DATE
HOURS CERTIFICATE NO.
82 Jul 31/09
Jul 31/09
MANUFACTURER PUBLICATION NUMBER COMPLIANCE A/C W.O.# SIGNATURE AND CERTIFICATE NO.
DATE HOURS
84 Jul 31/09
Jul 31/09
86 Jul 31/09
Jul 31/09
DATE A/C REMOVED PART NO. SERIAL INSTALLED PART NO. SERIAL SIGNATURE AND CERTIFICATE NO.
HOURS NUMBER NUMBER
88 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 89
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
90 Jul 31/09
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
Jul 31/09 91
PIPER AIRCRAFT CORPORATION
PA-34-200T, SENECA II
50 HOUR PROGRESSIVE INSPECTION MANUAL
92 Jul 31/09