You are on page 1of 31
United States Patent (2) Kawaguchi et al ($4) METHOD OF INSTALLING FURNACE WALLS OF A BOILER (75) Inventors: Shigeyoshi Kawaguchi, Chiyodosku (GP); Motoshi Horinoweht, Chiyoda-ku (GP); Shinichi Sagawa, Chiyodku UP) Yoshitaka Masuda, Chie Masakatsu hi Tadayoshi Mariyama, Kure UP) ‘Yasuaki Kawashima, Kure GIP) (73) _Assignoes: Hitachi Plan Technologies, Ltd, Tokyo (JP): Babeok-Hitachi ‘Kabushikt Kalsya, Kureshi JP) (©) Notice: Subject to any disclaimer, the term ofthis patent is extended or adjusted under 35 USC. 154(b) by Odays 21). Appl. Nos 117733,77 (22) Filed: Ape 10,2007 () Prior Publication Data $ 200710272172A1 Nov. 29,2007 0) Forcign Application Priority Data May 29,2006 (1) 2006-14868 G1) Ine BRID 31724 (200601) (2) US.C1 122/450; 122/495; 291890 051 8) Field of Classification Search 2978901051: 1231498, 496,512,480, Sce application file for complet search history 66) References Cited US. PATENT DOCUMENTS 2.75810 A * 1957 Gatehouse 2017 28 iA 'US007726264B2 US 7,726,264 B2 jun. 1, 2010 (10) Patent No. 4s) Date of Patent: 4910888 4 ¢ 31990 Spada eal 727803 B2* 102007 Waseta ta 200u'o02i66s AL* “9/2001 Heidich 29890051 R insio FOREIGN PATENT DOCUMENTS @ os240ws 9/1003 » 0824005 A * 9/1995, aw fs396892 A * LL1993, ” 052885505 A * 10'1994 7 05325503 A * L194 w ao0nio77e7 A * 42007 * cited by examiner Primary Exaniner—Giregory A Wilson (74) Attorney, Agent, or Firm Oli & Beridge, PLC on ABSTRACT ‘New and use method ofinstalling mace was fora oiler that does not require dedicated temporary lifting mechanism ‘and reduces the installation work peried sigaficaaty is dis- closed. The method of installing fumace walls for a boiler configured with an upper portion of boiler proper 30 and a Jower portion of boiler proper 40, temporally suspending 0 left and right face famace water wall panels 48 among four fumace water wall panels, the upper portion of boiler proper is assembled while itis hanged from a top gieder module 28 positioned on the top portion of center portion in a boiler Frame, 2 face rear wall 44 and s fursice front wall 42 among the furnace water wall panels are hangod sequentially, the temporally suspended two Tefl and right face furnace ‘water wall panels 48 are moved to designated positions, and the upper ends ofthe furnace water wall panels 48, 44 and 42 fare connected with the lower end of the upper portion of boiler proper 30. 17 Claitns, 24 Draw “ 12 188 U.S. Patent Jun. 1, 2010 Sheet 1 of 24 US 7,726,264 B2 FIG.1 U.S. Patent Jun. 1, 2010 Sheet 2 of 24 US 7,726,264 B2 U.S. Patent Jun. 1, 2010 Sheet 3 of 24 US 7,726,264 B2 US 7,726,264 B2 Sheet 4 of 24 Jun. 1, 2010 U.S, Patent 58 4 ) (2) FIG.4 US 7,726,264 B2 Sheet 5 of 24 Jun. 1, 2010 U.S, Patent 44 58 () S FIG.5 U.S. Patent Jun, 1, 2010 Sheet 6 of 24 US 7,726,264 B2 60B se FIG.6 U.S. Patent Jun. 1, 2010 Sheet 7 of 24 US 7,726,264 B2 U.S. Patent Jun. 1, 2010 Sheet 8 of 24 US 7,726,264 B2 ( 42(44) FIG.8 U.S. Patent Jun. 1, 2010 Sheet 9 of 24 US 7,726,264 B2 28 18A By 14 30 12 FIG.9 U.S. Patent Jun. 1, 2010 Sheet 10 of 24 US 7,726,264 B2 10 28 188 = 18h. Lo 14 12 30 16 FIG.10 US 7,726,264 B2 FIG.11 U.S. Patent Jun. 1, 2010 Sheet 12 of 24 US 7,726,264 B2 FIG.12 U.S. Patent Jun. 1, 2010 Sheet 13 of 24 US 7,726,264 B2 18A i 7 0 14 12 30 48 rh 42 ceo +44 Ki 16 ALE FIG.13 U.S. Patent Jun. 1, 2010 Sheet 14 of 24 US 7,726,264 B2 28 «18B 10. 18A J 14 \ L—12 z 30 hn CS Ut 48 42 : A 44 He ¢ ee nat FIG.14 U.S. Patent Jun. 1, 2010 Sheet 15 of 24 US 7,726,264 B2 wate tte | _ aaa we eee TeworsiixS ceiret stage) Move Connect! (Fifth Stage) na i 2 Aqueduct Wal! “rut — (Second Stage) emparaliy Suspension Connect Upper Body Post-Can Assemble (Third Stage) Aqueduct Wall semper ae Hipesign — Opanect Pre-Can ee ee (Fourth Stage) ‘Aqueduct Malt Connect wee (Sixth Stare) Inc lined Aqueduct fall Tine FIG.15 U.S. Patent Jun, 1, 2010 Sheet 16 of 24 US 7,726,264 B2 FIG.16 US 7,726,264 B2 Sheet 17 of 24 Jun. 1, 2010 U.S. Patent FIG.17 US 7,726,264 B2 Sheet 18 of 24 Jun. 1, 2010 U.S. Patent < Wey fp te {vf 30 48 FIG.18 US 7,726,264 B2 Sheet 19 of 24 Jun. 1, 2010 U.S. Patent FIG.19 U.S. Patent Jun, 1, 2010 Sheet 20 of 24 US 7,726,264 B2 FIG.20 U.S. Patent Jun, 1, 2010 Sheet 21 of 24 US 7,726,264 B2 US 7,726,264 B2 Sheet 22 of 24 Jun. 1, 2010 U.S. Patent FIG.22 US 7,726,264 B2 Sheet 23 of 24 Jun. 1, 2010 U.S. Patent FIG.23 U.S. Patent Jun. 1, 2010 Sheet 24 of 24 US 7,726,264 B2 FIG.24 US 7,726,264 B2 1 METHOD OF INSTALLING FURNACE WALLS OF A BOILER BACKGROUND ‘The present invention relates to a method of installing fumace walls of a boiler, more specifically a method of installing frace wall ofa oiler suitable for constricting # large-scale boiler such as one for thermal power plan. FIG. 24 shows the exemplary side view ofthe schematic ‘diagram of coal fred large-scale boiler for a thermal power plant. A boiler I chiefly consists ofa central portion 3 with a boiler famace wall 2 and a convoetion pass wall 7, «front portion 5 witha coal bunker 4, snd a sear portion 6 enclosing nr pre-heating device (not shown), Theboilerfumace wall 2 andthe convection pass wal 7 and others are suspended 10 ‘large beam 8 that is Jocated on the top of boiler frame, so fas to release the thermal expansion ding the burning open- “Accordingly. ina general constuction process forthe con- strvction ofthe boiler furnace wall 2 and the eonvection pass Wal 7, the large beam 8 is attached on top ofthe established bor frame that i as high as 6010 100 meters. Afr that, by hanging various parts For constructing the boiler furnace wall andthe convection pass wall 7 from te lage beam 8, those walls are assembled fom the upper portion toward lower Portion in sequence. However, tis construction process des not have high operating eflieieney because of the dangerous ‘operation in high altitude. Pspecilly, asthe boiler furnace ‘wall 2 has a shape with lage Tength in the lengthsse diree= tion, with the process of constructing from upper portion towanl lower portion, the necessary period forthe instalation ‘work becomes long since the lower portion ean not be assembled until the upper portion is assembled. Therefor, the largest factor to prolong the entire constraction period for the boiler failty Was the installation work for the boilee famace wall 2 order to alleviate tho problem, Japanese patent nid-open publication 15-240405 discloses abaerfornace wall nstal- Jation method dividing the boiler face wal 2 into three portions of an upper potion of boiler proper, left and right ower portions of boiler proper, suspending the upper portion ‘of boiler proper tothe desired position alter assembling cach portion atthe bottom position inside ofthe boiler frame, then ‘connecting the left aa right lower portions of boiler proper by translating them tothe upper portion of boiler proper. With this method, the eonsiruetion period is expected to be short- ‘ened sinee there is less operation in high altitude and the upper portion of boiler proper and the lower portions of biler proper can be assembled in parallel, However, hemethod disclosed requires lange space inthe boiler frame premise for assembling the upper and lower portions of boiler proper since he operation takes place atthe bottom position inside ofthe boiler frame, which introduces large restriction to the establishment of the boiler frame. Additionally, as he upper and lower portions boiler proper ‘are assembled in suspension inthe sime way as the conven tional method, a dedicated temporary suspension mechanism or each portion of boiler proper is required, SUMMARY, ‘The objective of the invention is to provide method of installing boiler farmace walls that can drastically reduce the installation period for the boiler furnace walls, without eaus- ing special restriction when establishing the oiler frame, and without the dedicated temporary suspension mechan 0 o 2 norder to achieve the objective, the installation method of the boiler fumace wall according to the present invention isa boiler furnace wall installation method wih the upper portion of boiler proper and the lower portion of boiler proper, that assembles the upper ponion of boiler proper while it is sus- pended frm the top girder modile deployed in the boiler Tame. At the same time, four faces of furnace water wall pans that constitute the lower portions of oiler proper are pre-assembled on the ground. Upon the completion ofeach ace ofthe Furnace water wall pals this units brought into the boiler frame premise and Tifted toward the upper portion of boiler proper, and upper ends ofeach fice ofthe furnace Water Wall panels are connected 10 lower ends ofthe upper portion of boiler proper, ‘With the installation method of & boiler furnace wall according tothe present invention, the furnace water wall ppancl with Jour faces that constitute the lower portion of boiler proper ean be preassembled atthe more couvenient locaton with safe and ellicient operation. In addition to tha, the installation period for the boiler fumace wall ean be shortened drastically ue to thereasons that there iso special restriction tothe establishment of the boiler frame, theres no ced to make a dedicated temporary suspension mechanism and the upper and lower portions of boiler proper ean be ‘assembled in paral BRIBE DESCRIPTION OF THE DRAWINGS. FIG. 1 a side view for indicating the inital stage ofthe ‘method of installing boiler fumace walls according to the present invention, FIG.2is a perspective view of the main construction ofthe boiler furnace wall FIG, 3 isaside view showing the assemble operation ofthe ‘upper postion of boiler proper FIG. 4 shows perspective views ofthe furnace water wall panel 48 during the assembling stage FIG. 5 shows the furnace reae wall 44 during the assem- bing stage. FIG. 6shows a perspective view ofthe furnace hopper oat wall $2, 4 during the assembling tape. PIG. 7isaside view ofthe first stage ofone embodiment of the present invention. FIG. 8s a plan view showing the two couples of let and right furnace water wall panel 48 while temporarily #us- pended. FIG. 9isaside view f the second stage ofoncembodiment of the present invention. FIG. Iisa side view ofthe thd stage of oneembodiment ofthe present invention FIG. 11 isa partial detailed perspective view ofthe furnace rear wall 44 during the suspension. FIG. 12 isa side view of the fourth stage of one embod oF the present invention. FIG. 13 is aside view of the fifth stage of one embodiment ofthe present invention. FIG. I4isa side view ofthe sixth stage of oneembodiment cof the presen invention. PIG. 18 is @ process diagram showing the generalized stages of instalation, FIG. 16 is a perspective view of the first stage of one cmbodinient of the present invention, FIG. 17 is a perspective view of the socond stage of one embodiment of the present invention FIG. Nis perspective view a the intial phase of the tind stage of one embodiment ofthe present invention, US 7,726,264 B2 3 FIG. 19 is a perspective view of the midlle phase ofthe third stage of one embodiment ofthe present invention. FIG. 203s perspective view of the final phase ofthe third stage of one embodiment ofthe present invention. TIG, 21 isa perspective view of the initial phase of the fourth stage of ane embodiment ofthe present invention IG. 22 is a perspective view of the middle phase of the {fourth stage of ane embodiment ofthe present invention IG. 23 sa perspective view of thefinal phaseofthe fourth stage of one embodiment ofthe present invention, IG. 24 shows the exemplary side view ofthe sehematie diagram of coal fire large-scale boiler for thermal power plant, DETAILED DESCRIPTION OF EMBODIMENTS “The method of installing the boiler Furnace walls according to the present invention isa boiler Furnace wall installation ‘thod withthe upper portion of boiler proper and the lower portion of boiler proper that assembles the upper portion of 2 boiler proper whileits suspended from the wp girder module ‘deployed in the boiler frame. Ate same ine, Four faces of Tumace water wall panels that constitute lower portions of boiler proper are pre-assembled on the ground. Upon the ‘completion of each face of the furnace water wall panels this. > ‘itis brought into the boiler frame premise and life toward the upper portion of boiler proper, ad upper ends ofeach face ‘ofthe furnace water wal panels are connected to lower ends ‘of the upper portion of boiler proper. And the Furnace water ‘wall panel with four faces that constitute the lower portion oF boiler proper can he preassembled atthe more convenient Jocation with safe and efficent operation. Inadition to that the installation period for the boiler fumace wall can be shortened drastically dueto the reasons that there iso special restriction tothe establishmeat of the boiler Frame, there 0 need to make dedicated temporary suspension mechanism, ‘and the upper and lower portions of boiler proper can Be assembled in paral Tt should be born in mind other variation of the present invention is achieved by following sequence: After tempo- rary suspending two sides (left and right) of fumace water wall panes that are the parts of the lower portion of boiler proper, the upper portion of boiler proper is assembled while stis suspended from atop girder module located on the top of boiler frame, after thal, a furnace rear wall and a Tumace Tat wall that are the parts of the lower portion of boiler proper are suspended while the temporarily suspended left ‘and right furnace water wall panel are shifted 10 Use desig nated postion and the wpper ends of the furnace water walls orming four faces are connected to the lower ends of the upper portion of boiler proper. By doing this way the left and ripht fumace water wall panels are temporarily suspended advance, the left and right furnace water wall panels are ‘hited to the designated position when the eouneetion with the upper portion of boiler proper bocomes possible, and each face of the upper end of the furnace water wall panels is ‘connected with each lower end ofthe upper portion of boiler proper. Therefore the unwanted interference i avoids! even ‘cate tha the upper portion of boiler proper is assembled in ‘advance andthe upper portion of boiler proper itself usually bocomes the obstacle when lifting the tw (lft and righ!) furnace water wall panes Iisalso desirable to assemble the accompanying buckstay and wind box together as one body, when each ofthe fumace water wall panels are pre-assembled. By doing this way, the brckstay and the wind box are assembled inthe location with ‘goed workability on the ground saely andefiiently. Addi 4 sionally, the deflection and stress eaused tothe furnace water ‘wal panels inthe process of lilting them will he minimized beeatse the attached buekstay and the wind box inereae the rigidity ofthe furnace water wall panels significantly. Furtbermore, the present invention is characterized i that lifting jacks are located on the top of the boiler frame, and each ofthe farmace water wall panels are pulled up while the ‘upper portions of farace water wall panels are pulled by the iting jacks and the ower portions are dragged onthe ground. In this ease, itis desirable to pul up the pendant evil 10 be placed immediately above the furnace rear wall with the lifting jocks mentioned above at the same time. When each of the pre-assembled furnace water wall panels is lifted, the Titing jocks located on the top of the boiler frame can be lized. ‘Therefore, the safety and efficient operation is achieved for pulling and lifting the huge (several hundred fons) fmace water wall panel blocks tobe positioned in their designated positon easily. ‘When the furnace rear wall sited, the pendant col to be located immediately above the furnace ear wal is pulled up ‘with the lifting jacks. Therefore, the installation operation oF ‘the pendant coil is achieved efficiently atthe same time “The embodiment relating tothe method of installing boiler urnice walls aecording to the present invention will be explained together withthe drawings atached. FIG. 1 shows the side view ofthe initial stage of the installation. Same as the above-mentioned FIG. 24, the boiler frame consists of a cvater ponion 12, a front portion 14 and a rear portion 16. ‘Maltiple of lifting jacks 18 and 8B for installation are Tocated on the top portion of the central portion 12 an advance. There are multiple of top girder 24 and multiple of top middle girder 26 that are located inbetween the top girder 24. Atop girder mocile 28 consisting ofthe top girder 24 and the top middle girder 26 formed in a grid stricture creates so-called banging structure; boiler famace walls 20 and con- vection pass walls 22 are lifted by multiple of suspension parts (not shown suspended from the top girder module 28. ‘The total weight ofthe large module reaches to several hun- dred tons. Incase of such a huge top ginler module 28, the ‘operation efficiency will be reduced ifa mobile erane on the top portion is used for the assembly since it requires many stepsot operation i the high altitude. Therefore isdesirable toassemble the top ginder module 28 on the ground, and tolift theentre assembled top girder module 28 withthe mulpleot lifting jacks 18 und 188 to beinstalled oa the op portion of the central portion 12, “The boiler firnace walls 20 surrounded by a chain double: dashed ine in FIG. 1 are sectioned by an uppee portion of boiler proper 30 anda lower portion of boiler proper 40. The per portion of boiler proper 30 is configured with a wot ‘wall 32, side wall portions 34 and oer internal components (not shown}: and one sido ofthe four side wall potions 34 is ‘connected to ane side ofa convection pass wall 22, The lower portion of boiler proper 40 is configired with four fooes of {lrmsee water wall panels; and furmace front wall 42 pos tioned toward the font portion 14 and a furnace rear wll 4 positioned toward the rear portion 16 are equipped with wind boxes 46 for attaching multiple of bumers for bumming. A bopper portion Ss attached fo the lower portions of et and right furnace water wal panels 4 located in faces inbetween the furnace front wall 42 and the fumace rear wall 44% and furnace hopper front walls 82 and 84 are connected the loser portion of the furnee front wall 42 and fumace rear wall 44 50 ao link the apposite sides ofthe hopper portion 50 For your information, each of furnaee water wall panels sch a the roof wall 32, the side wall portions 34 and the lower portion of boiler proper 40 is formed with rectangular US 7,726,264 B2 5 water wall panels that have 2-8 meters of side width by ‘welding connection, The boiler furnace wal 20 is configured by connecting the lower end ofthe side wall portions Mot the ‘upper portion of boiler proper 30 andthe upper end of each fiimace water wall panels the lower portion of boiler peopet 40 In this prefered embodiment, the upper portion of boiler proper 30 in the boiler furnace wall 20 is assembled while it Js suspended from the top girder module 28. In other words, aller liting the roof wall 32 with the multiple of suspension parts §6 suspended from the tp girder module 28, he side Wall portions 34 and itera! components (not shown) are assembled sequentially while they are suspended. FIG. 3 ‘ustates that the side wal portion 34 i partially assembled by welding the water wall panel 8. The lower partof the side wal portion 34 illustrated with the chin double-dashed line js assembled sequentially. The lifting operations t© supply rovessary parte are mainly conducted by amobileerane 7002 the ground ‘AL the same time, each of four face furnace water wall panels are pre-assembled on the ground respectively for Torming the lower portion of oiler proper 40. FIG. 4 (1) indicates the first process: Multiple water wall pancls $8 are ‘aligned on a level block andl welded together. FIG. 4 (2) indicates the second process: buckstays 60 are atachedto the face of connected fumace wate wall panel for Forming a grid suppor. The assembly steps ofthe farce water wall panel 48 can be switched: namely, the buckstays 60 can be assembled together first and then they ean be attached on the top of the furnace water wall panel TTIG.5 shows the slanted perspective view of the assemble sage ofthe furnace rae wal 44. FIG, 5 (1) indicates the frst process: Mulipleo! water wall panel 58 are aligned ona evel block and welded together for forming the vertial face ofthe umace ear wall 44. FIG. 8 (2) indicates the second process: the wind boxes 46 ae attached to the face of eonnected fumace water wall panel for forming @ grid support. The buckstays 60 are attached 10 the other face of connected fumace water wall panel tha does not have the wind boxes 46 ‘oe forming a grid suppor. The assembly steps ofthe Furnace front wall 42 can he switched: namely, the wind box 46 and buckstays 60A ean be assembled together first and then the furnace water wall piel can be connected on the top of these wind box 46 and buckstays 60, ‘As for lumace hopper Iroat and rear walls 2 and 84 to be ‘connected tothe fumace front wall 42 and furnace rear wall, 444, the famace water wall panel with buckstay 60 10 be ‘attaches are formed asa one body pa IG. 7indicatesthe st ste ofthe installation process. At fis, the funace water wal panel 48 (one ofa left and right pair ofthe furnace water wall panels 48) thats located in the viewer side relative tothe paper surface i pulled horizontally thenplaced immediately below the center portion 12.Then by ttlizinga wine (not shown, the famace water wall panel 48 js pulled with twists inthe route of arrow B 80 a tempo- rarily suspend and position the furnace water wall pane! 48 vertically in the mide height. FIG. 8 shows plan view ofthe sage when the temporary suspension ofboth left snd right umace water wall panels 48 has been completed. As shown nthe drawing, the gapd Berween the lef and righ pai ofthe Jrmace water wal panels 48 temporarily suspended is larger than the final gap d relative tothe upper portion of boiler proper 30, maintaining the open status, By utilizing this ‘improved method, the assembly operation ofthe upper por tion of boiler proper 30 and the pulling and iting operation of the furnace water wall panel 44 and the furnace front wall 42 (G0 be explained later) hecome easier 0 o 6 FIG. 9 shows the second stage. In this second stage, the ‘upper portion of boiler proper 30 is assembled om the top of the boiler frame. 'FIG. 10 shows the third stage, In this third stage, upon the completion of the assembly of the upper portion of boiler proper 30 to certain stage, the famace rear wall 44 i pulled And lifted, and the lower end of the upper portion of boiler proper 30 and the upper end ofthe fumace rear wall 44 are connecied. At first, the fomace rear wall 4 is pulled in the direction showa by an arrow A horizontally so as to reach t0 the immediately below the upper portion of boiler proper 30. ‘Then the upper portion of the fumace rear wall 44s pulled up witha iting jack 188 while the lower porto the ground s9 as to be lifted as indicated wi ‘et snot with te owe orton of oie raper 30 is conducted at an appropriate i TG. 11 shows the perspective vew usating the pata atsils during th time of lifting the furnace rear wall 44. In the top part of the center portion 12 ofthe boiler frame See FIG. 1), there are 12 center hole system lifting jacks 72,72, “T2arepre-installedasan installation lifingjack 18D. These ceater-hole sytem lifting jacks 72 are positioned immedi- ately shove the vicinity ofthe upper surlace of the furnace ‘war wall 44 soso pull up the post-fumsee water wal panel 44 smoothly. The center-hote system iting jack 72 sa ihing jackwith asling rod 74 made by connecting unit rods screwed {ogether whoge unit length is several fens of centimeters that is equivaleat to one or several strokes; and the iting jack ‘move the sling rod 74 going through a center hole of the ceator-hole system iting jack 72 up and down ina stoke by stoke fashion with a hydmlie pressure activation mecha- nism. Sinceit is easier to form along sing rod 74by selecting 4 number of connecting unit rod, is preferable for conige uring the high-lift lifting jock means, The unit Iiting eapa- bility ofa center-hole system lifting jack 72 is, for example, 200 tons. With 12 lifting jocks, overall lilting capability is 2.400 tons. As a center hole system lifting jack 72 ean be the real system as explained or the strand sysiem. 118 also pos- sible to employ a lifting jack other than the center-hole sys- tem. Tnan ontinary large-sale boiler, pendant coil 78 that sa ‘intemal component ofthe upper portion of boiler proper 30 is located immediately above the furnace rear wall 44. There- ‘or, in this embodiment, the construction method of more cilficen installation operation is employed by pulling up the pendant coil 78 nd the fimace reat wall 44 athe same timo. Inthis method, the upper balance beam 76 is suspended by the sling rods 74 suspended from each center-hole system iting jack 72. The pendant coil 78 is lifted together by a bolt ‘connection device (not shown) connecting the coil 10 the ‘upper hugging balance 76, From the upper balance beam 76 ‘multipleo sling bolts80are hanging through the pendant coi TH by selecting its gaps: uad a lower balance bea 82 is attached tothe endo the sing bolts 80. The Furnace rear wll ‘44s suspended from the lower halanoe beam 82 with s hinge device (not shown). By forminga iting mechanism like this, the pendant coi 78 whose weight is approximately 1,000 tons and the furnce rear wall 4 whose Weight is approximately 350 tons are lifted tovether then installed to the designated positions respectively FIG, 12. shows the fourth stage, In this fourth stage, che furnace font wall 42 is suspended and attached to the lsser end ofthe upper ponion of boiler proper 30 andthe upper end ‘ofthe furnace front wall 42. A first, the furnace front wall 42 is pulled the direction shown by an arrow A horizontally $0 fas to reach to the immediately below the upper portion of boiler proper 30. Then the upper portion of the furnace front US 7,726,264 B2 1 wall 42 is pulled up with lifing jack 8A. while the lower portion is dragging on the ground so as to be lille as indie ‘cated with an amow D. Alter that, the connection with the Jower portion of boiler proper 30 is conducted st an appro- priate timing, In the ease that the wind boxes 46 and the bruckstays 60. are located in the upper side as shown in FIG. is inconvenient when iting the furnace front wall 42 craw D direction since the orientation of fumace font ‘wall 42 is opposite. Therefore, itis more convenient t0 assemble the himace font wall 42 to make the wind boxes 46 ‘andthe buckstays 60 to be in the lower side, then pull it ‘owanl the immediate below the upper portion of boiler proper 30, FIG. 13 shows the fit stage. Inthe fit stage, the furnace water Wall panels 48 hanging on inthe medium height tem- porarly separated with a gap d! wider than the final gap d (shows in FIG. 8) is pulled up inthe direction shown with an arrow E to be a designate position. Aer that, the connec- tions with the lower end ofthe upper portion of boiler proper 30, adjacent furnace front wall 42 and furnace rear wall 44 ‘ill be conducted at appropriate timing respectively. IG. A4shows the sixth stage. Inthesisth stage, the furnace hopper front and rear walls 2 and 84 are pled in the iree- tion shown by an arrow A horizontally so as to reach to the ‘immediately below the left and right farnace water wall pan- ‘els 48, furnace front wall 42 and furnace rear wall 44, Theo, the furmace hopper fret and rear walls 82 and 4 are pled up witha iting device (aot shown inthe way’ arow C shows, Aer that, the eomneetion with the lower end of the furnace ‘water walls is conducted at an appropriate timing; the lower hopper portion located on the bottom of the boiler fumace walls 20s completed, FIG. 18 is the process diagram showing the generalized steps of installation explained above. The first stage is the temporary suspension ofthe Ff and right faces ofthe furnace ‘water wal panels 48, the second stage isthe assembly ofthe ‘upper portion of boiler proper 30 at the top portion of the boiler frame, the third stage isthe suspension (including the suspension of the pendant coil simultaneously) and eonnee- liom ofthe frmace rear walls 4 pre-assembled onthe ground, the fourth stage isthe suspension and connection ofthe fur nace frat wall 42 assembled on the ground, the ff stage is the movement and connection ofthe left and eight Furnace ater wal panels 48, and hesixth tages the suspension and ‘connection of the furnace hopper front and rear panels 52, 54 sssembled on the ground, FIG. 16 through FIG. 23 isthe prospective view of each stage of above-mentioned installation stages. FIG. 16 shows the first stage, FIG. 17 shows the second stage, FIG, 18 through FIG. 20 how the third stage, FIG. 21 through FIG. 22 show the fourth stage, and FIG, 23 shows the fh stage As explained above, the boiler umoce wall installation method aecording to the embodiment, the upper portion of boiler proper 40 is assembled while suspended from the lop girder mode 28 located onthe top ofthe center portion 120 the boiler frame, while the four faces of furnace Water Wall panels 48, 48, 44 and 42 re pre-assembled on the ground and pulled up, and he upper end of each ofthe fumace water Wall pan! is connected with the lower end ofthe lower portion of boiler proper. Therefor, the assembly of each fumace water ‘wall panels 48, 48, 44 and 42 arc conducted on the high ‘workability place on the ground safely and efficiently. Ad tionally, there is no special restriction while consracting the boiler frame; there is no ned to utilize the dedicated tempo- rary lifting mechanism; an drastically reduce the inst work time due © the simultaneous assembly of the upper 0 o 8 portion of boiler proper 30, the Furnace rear wall 44 and furnace front wall 42 and s0 on ‘Among the furnace wate Wall panels, two faces of left and right farnace water wall panels 48 is suspended temporarily in advance, the to faces of left and right funace Water Wall panels 48 are moved to the designated postions when the ‘connection with the upper portion of boiler proper 30 become possible, and connection of upper end of each face of the Turnoce water wall panels with the lower end of the upper portion of boiler proper iscondoced. Therefore, th unwanted fnterlerence is avoided even i ease that the Upper portion of boiler proper 40 is assembled in advance snd the upper por ‘ion of boiler proper itself 30 usually becomes the obstacle ‘whe lifing the two (lft and right) furnace water wal panes Additionally, in assembling the furnace water wall panels, 48,48, 4. and-42, the buckstays 60 and 60 A together withthe ‘Wind boxes 46 are assembled together, so the attachment of the buckstays 60 and the wind boxes 46 can be done at the high workability location on the ground safely andeficienty. It should also be noted thatthe buckstay 60 and 60A or the Wind boxes 46 significantly increase the rigidity ofthe fur race water wall panos: therefore the deflstions and stresses cused inthe furnace water wall panels 48,48, 44 and 42 by Titing the pre-assembled furnace water wails sre minimize Punbermore, the lifting jacks 18 and 18B equipped on the top of the boiler frame are utilized for iting the pre- ‘assembled famace front walls 42 and furnace rear wall 4, he aizantie furnace water wall panel blocks weigh several hun- {red tonsean be pulled upto the desired location easly, whieh the safety of operation and the efficiency are obtained. ‘Moreover, sinee the pendant coil 78t0 be positioned imme itely above the furnace rear wall is pulled up together with the furnace ear wall 44 withthe [2 center hole system iting {ck 72a the same time, the efficient installation operation of the pendant coil 78 is achieved "The above prefered embodiment is explained as an instal. Jation method ineluding the steps of sospending pair of left and right furnace water wall panels 48 temporarily in ‘advance, assembling the upper potion of boiler proper 30 hile suspended fom the top giner module located on the {op of the boiler frame, suspending the furnace rear wall 44 ‘and furnaee front wall 42 one by one, moving the temporarily suspended let and right famace water wall panels 48 to the designated position, and connecting the upper end ofthe each ace ofthe furnace water wall panel and the lower end ofthe ‘upper portion of boiler proper. However, the present invention js not limited to the installation method disclosed in the embodiment. For example, it includes the method of assem- bling the upper portion of boiler proper 30 in dance, then lifting the Tour faces of the furnace water Wall panes pre- assembled on the ground. and connecting the upper end of ‘each face othe fumace water wall panel and the lower endo the upper portion of boiler proper, ‘While the invention herein disclosed has been described by ‘of specific embodiments and applications thereof, ous mixlifeations and variations could be made thereto by those skilled in thean without departing from the scopeof the invention set forth inthe claims. ‘What is claimed is: 1A method of installing boiler furnace walls witha. upper portion ofa boile proper and a lower portion of the beiler Proper comprising: assembling the upper portion ofthe oiler proper while its, suspended foma top ginder module placed on atop of boiler frame; US 7,726,264 B2 9 sre-assembling each four face Furnace Water wall panels individually for forming the lower portion ofthe beiler proper respectively onthe ground; Tifing each of said four face furnace water wall panels individually after the completion of the pre-assembling; and connecting an upper portion of each face of sad four face furnace water wall pancls witha lower portion of the ‘upper portion of the boiler proper while the upper pot= tion ofthe boiler proper is suspended within the boiler feame, wherein a ifting jack is located on the top of said boiler feame, theifing jack simultaneously hanging the upper portions ofthe furmace water wall panels and drogging the lower portions on the ground and Tifting the lower portions into position 2. The method ofelsim 1 wherein left and right face fare race water wall panels within said four face furnace water ‘wall panels are temporarily suspended in alvanee, the uppet portion ofthe boiler properis assembled whileitis suspended 2 from ssid top girder module beam module placed onthe top oF si boiler frame, a furnace fron Wal ala fumace rea Wall ‘of the aver portion of boiler proper are suspended seqien- ‘ally, said left and right face furnace water wall panels tem- porarly suspended are moved to designated postions, and the upper portion of each face of said furnace water wall panels andthe ower ponion ofthe upper portion he boiler proper is connected 3. The method of claim 1 wherein buckstays and a wind box to be attached to the fiimace water wall panels are assembled together when cach of std fumace water wall panels ae formed. ‘4. The method of claim 1 wherein a pendant col to be positioned immediately above a furnace rear wall among said face water wall pancls is pulled up together with said Juraace rea wall with said lifting jack a the same time, '5.,\ method of installing boiler kumace walls with an upper portion ofa boiler proper and a lower portion of the boiler proper, comprising: assembling the upper portion of the boiler proper while itis ‘uspended froma op girder module placed ona top of 2 boiler fame re-assembling eachof four face Furnace water wall panels individually for forming the lower portion ofthe boiler proper respectively on the ground lifting wo opposite fae furnace water wal panels after the ‘completion ofthe pre-assembling and suspeoding them temporarily in positon; lifting two other opposite face famace water wall panels afer the completion of the pre-assembling; moving all Tour face furnace water wall panels to the des: ignated positions; and ‘connecting an upper potion ofeach face of suid furnace ‘water wall panels with a lower portion of the upper portion ofthe boiler proper that i formed by said four face fumace water wall panels being connected while the upper portion of the boiler proper is suspended ‘within the boiler frame, ‘wherein a lifting jack is located on the top of said boiler frame, theifling jack simultaneously hanging the upper portions ofthe furnace water wall panels and dregging the lower portions on the ground and lifting the lower portions into position 6. The method of elsim wherein left and right face fur- race water wall panels within said four fice furnace wate ‘wall panels are temporarily suspended in advance, the wpper portion ofthe boiler properis assembled while tis suspended 0 o 10 {rom sid top girder module bears module placed oa top of suid boiler frame, a furnace front wall anda furnace rear wall of the lower portion of boler proper are suspended sequen tially, said left and right face furnace water wall panels tem- porary suspended are moved to designated postions, and the upper portion of each face of said furnace water wall panels and the ower portion ofthe upper portion a the boiler proper is connected "TThe method of claim 5 wherein bockstays and a wind box to be attached to the farnace water wall panels are assembled together when each of said furnace Water wall panes ae Formed '8. The method of claim § wherein a pendant coil t0 be positioned immediately abovea fumace rer wall among said Tumace water wall panels is pulled up together with said ‘urmsee rear wall with said iting jack at the same time. 9. The method of claim 5 wherein sid lower portion of the boiler proper comprise pair of left and right fumace water ‘wal panel, farnace front Wall, fumace ree wall and furnace bopper walls 10, method of installing boiler furnace walls with an ‘upper portion of a boiler proper and a lower portion of the boiler proper comprising: assembling the upper portion ofthe oiler proper while its, suspended from top ginfer module placed ona top ofa boiler frame; pre-assembling each of Tour face furnace water wall panels individually for fonning the ower portion of the boiler proper respectively on the ground beneath the boiler frame, attaching buckstays anda wind box toa couple of said four face furnace water Wall panels to be one Body construe Tiling wo opposite face furnace water wall panels after the ‘completion of the pre-assembling and spending them temporarily in postion: lifting two other opposite face famace water wall panels after the completion of preassembly; moving all the four face furnace water wall panels to the designated positions; and ccannecting an upper portion ofeach face of said furnace ‘water Wall panel witha lower portion ofthe upper pot= tion of the Boiler proper thats Tormed by said four face fumace water wall panels being connected while the upper portion of the boiler proper is suspended within the boiler fame, ‘wherein a Tifting jack is located on the top of said boiler frame, the iling jack simultaneously hanging the upper portions ofthe fimace water wall panels and dragging ‘the lower portions on the ground and Tifting the lower portions into postin, 11. The method of elaim 10 wherein left and right face {luraaee water Wal panels within said fou foe furnace water ‘wal panels are temporarily suspended in advance, the upper portionof the boiler properisassembled while tis suspended from sail top gitder module beam module placed on top of said boiler frame, furnace front wall anda furnace rear Wall of the lower portion of boiler proper are suspended sequen ‘ally, suid lft and right face furnace Water Wall panels tem- porary suspended are moved to designated postions, and the upper portion of each lace of said furnace water wall panels andthe ower portion of the upper portion of the boiler proper i connected 12, The method ofelaim 10 wherein buckstays and a wind box to he attached to the farace water wall panels are assembled together when cach of said furnace water wall panes ae formed. US 7,726,264 B2 u 13, The method of claim 10 wherein a pendant eoil to be positioned immediately above a furnace rear wall among said Jumace water wall panels is pulled up together with said famace rear wall with said lifting jack a the same time. 14, The method of claim 10 wherein sid lower portion of 5 the boiler proper comprises & pir of left and right furnace ‘water wall panels, fumace front wall, furnace rear wall and furnace hopper walls 15. The method oi claim 10 further comprising moving 2 pair of Furnace hopper walls sequentially and forming said. 10 hopper portion 12 16, The method of claim 15 wherein a pendant coil to be positioned immestiately above a fumace rear wall among said furnace water wall panels is pulled up together with suid {urmoee rear wall with said lifting jock at the same time. 17. The method of claim 16 wherein ssid lower portion of the boiler proper comprises a par of feft and right furnace ‘waterwall panels, afmace front walla fumace rear wall and furnace hopper walls.

You might also like