Column C1 (: Design of Columns

The document describes the design of a column (C1) with dimensions 230mm x 450mm using steel grade Fe 415 and concrete grade M20. It provides the design calculations for the column for different load cases from 1841.33kN to 508kN. For each load case, it calculates the required steel reinforcement and checks if the provided reinforcement is adequate to resist the load in a safe manner. Torsional links of 8mm diameter are provided at 230mm c/c.

Uploaded by

Shwetha Hanvi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
535 views6 pages

Column C1 (: Design of Columns

The document describes the design of a column (C1) with dimensions 230mm x 450mm using steel grade Fe 415 and concrete grade M20. It provides the design calculations for the column for different load cases from 1841.33kN to 508kN. For each load case, it calculates the required steel reinforcement and checks if the provided reinforcement is adequate to resist the load in a safe manner. Torsional links of 8mm diameter are provided at 230mm c/c.

Uploaded by

Shwetha Hanvi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

DESIGN OF COLUMNS

Column C1 ( 230 x 450 ) Steel: Fe 415


Concrete: M 20
Load on column = 1841.33 kn

Pu = 1841.33 kn Mu = 2.21 kn-m


Pu = 1841.33 x 10 3
fck.b.d 20 x 230 x 450
= 0.89

Mu = 2.21 x 10 6
fck.b.D 2 20 x 230 x 450 2
= 0.0024

d' = 50 = 0.11
D 450

p = 0.14
fck
p = 0.14 x 20
= 2.8 %

Ast- req = 2.8 x 230 x 450


100
= 2898 mm 2
Provide 6 nos -Tor 20 + 6 nos - Tor 20

( 3770 mm 2 )

230
Provide Tor-8 links @ 230 c/c.

6 nos -Tor 20
450

6 nos - Tor 20

Tor 8 @ 230 c/c


Pu = ( 0.4 x 20 x 230 x 450
+ 0.67 x 415 x 3770 )
= 1876 kn > 1841.33 kn (safe)

DESIGN OF COLUMNS
Column C1 ( 230 x 450 ) Steel: Fe 415
Concrete: M 20
Load on column = 900 kn

Pu = 1269 kn Mu = 4.5 kn-m


Pu = 1269 x 10 3
fck.b.d 20 x 230 x 450
= 0.61

Mu = 4.5 x 10 6
fck.b.D 2 20 x 230 x 450 2
= 0.0048

d' = 50 = 0.11
D 450

p = 0.09
fck
p = 0.09 x 20
= 1.8 %

Ast- req = 1.8 x 230 x 450


100
= 1863 mm 2
Provide 6 nos -Tor 16 + 6 nos - Tor 12

( 1885 mm 2 )

230
Provide Tor-8 links @ 230 c/c.

6 nos -Tor 16
450
6 nos - Tor 12

Tor 8 @ 230 c/c

Pu = ( 0.4 x 20 x 230 x 450


+ 0.67 x 415 x 1885 )
= 1352 kn > 1269 kn (safe)

Column C1 ( 230 x 450 ) Steel: Fe 415


Concrete: M 20
Load on column = 1015 kn

Pu = 1015 kn Mu = 5.09 kn-m


Pu = 1015 x 10 3
fck.b.d 20 x 230 x 450
= 0.49

Mu = 5.09 x 10 6
fck.b.D 2 20 x 230 x 450 2
= 0.0055

d' = 50 = 0.11
D 450

p = 0.06
fck
p = 0.06 x 20
= 1.2 %

Ast- req = 1.2 x 230 x 450


100
= 1242 mm 2
Provide 4 nos -Tor 16 + 4 nos - Tor 12

( 1257 mm 2 )

230
Provide Tor-8 links @ 230 c/c.
4 nos -Tor 16
450

4 nos - Tor 12

Tor 8 @ 230 c/c

Pu = ( 0.4 x 20 x 230 x 450


+ 0.67 x 415 x 1257 )
= 1177 kn > 1015 kn (safe)

Column C1 ( 230 x 450 ) Steel: Fe 415


Concrete: M 20
Load on column = 762 kn

Pu = 762 kn Mu = 5.54 kn-m


Pu = 762 x 10 3
fck.b.d 20 x 230 x 450
= 0.37

Mu = 5.54 x 10 6
fck.b.D 2 20 x 230 x 450 2
= 0.0059

d' = 50 = 0.11
D 450

p = 0.03
fck
p = 0.03 x 20
= 0.6 %

Ast- req = 0.6 x 230 x 450


100
= 621 mm 2
Provide 3 nos -Tor 16 + 3 nos - Tor 12

( 942 mm 2 )
230
Provide Tor-8 links @ 230 c/c.

3 nos -Tor 16
450

3 nos - Tor 12

Tor 8 @ 230 c/c

Pu = ( 0.4 x 20 x 230 x 450


+ 0.67 x 415 x 942 )
= 1090 kn > 762 kn (safe)

Column C1 ( 230 x 450 ) Steel: Fe 415


Concrete: M 20
Load on column = 508 kn

Pu = 508 kn Mu = 5.54 kn-m


Pu = 508 x 10 3
fck.b.d 20 x 230 x 450
= 0.25

Mu = 5.54 x 10 6
fck.b.D 2 20 x 230 x 450 2
= 0.0059

d' = 50 = 0.11
D 450

p = 0.01
fck
p = 0.01 x 20
= 0.2 %

Ast- req = 0.2 x 230 x 450


100
= 207 mm 2
Provide 3 nos -Tor 12 + 3 nos - Tor 12
( 679 mm 2 )

230
Provide Tor-8 links @ 230 c/c.

3 nos -Tor 12
450

3 nos - Tor 12

Tor 8 @ 230 c/c

Pu = ( 0.4 x 20 x 230 x 450


+ 0.67 x 415 x 679 )
= 1017 kn > 508 kn (safe)

Column C1 ( 230 x 450 ) Steel: Fe 415


Concrete: M 20
Load on column = 254 kn

Pu = 254 kn Mu = 5.54 kn-m


Pu = 254 x 10 3
fck.b.d 20 x 230 x 450
= 0.12

Mu = 5.54 x 10 6
fck.b.D 2 20 x 230 x 450 2
= 0.0059

d' = 50 = 0.11
D 450

p = 0.02
fck
p = 0.02 x 20
= 0.4 %