2.F2 Combined Footing Bridge
2.F2 Combined Footing Bridge
NET PRESSUIRE :
Pmax = 83.33 10.00 13.33 106.7 kN/m2 < 300 kN/m2
SAFE IN BASE PRESSURE
Pmin = 83.33 10.00 13.33 60.0 kN/m2 < 300 kN/m2
GL > 0 kN/m2
NO TENSION CONDITION
1600
COLUMNS 400 x 350
H = 2100
500
1500
582.5
350
2000 435
350
582.5
582.5 582.5
500
2000
782.5 435 782.5
1217.5
BMD
108.5 kn 10.5 kn
1146 854.37
SFD
C2 end C1 end
16.5 kn 114.5 kn
LOACATION MOMENT MU REMARK OF Ast Req Min Ast DIA Spacing pt tc Spacing
TENSION per meter Reqd. % Provided in
2 2 2
kN-m mm mm mm mm N/mm mm c/c
Below
C11 49.79 AT BOTTOM 262 600 10 mm 195 c/c 0.140 0.282 150 c/c
AT MIDSPAN 31.83 AT BOTTOM 167 600 10 mm 195 c/c 0.140 1.261 150 c/c
C13 36.75 AT BOTTOM 193 600 10 mm 195 c/c 0.140 0.178 150 c/c
1500
108.5 kn 10.5 kn
19.8 kn 1048
-29.2 kn
C13 C11 SFD
16.5 kn 114.5 kn
782.5 435 782.5
2000 790
840 Col
790
60.00
kN/m2 106.67 kN/m2
83.34
kN/m2
5.1 PUNCHING SHEAR AT COLUMN NO. C11
Punching Shear Force = V = P1 - Pavg x Net Area =
Net Area = ( 840 x 790 / 1000^2 ) = 0.670 m2
Pavg x Net Area = 0.67 x 83.34 = 55.84 kN
Punching Shear Force = V = 125 - 55.84 = 69.16 kN
Effective Depth at Critical Section = d" = 440 mm
( d" = D" - eff.cover)
Effective Perimeter at Critical Section = b" = 3260 mm
Nominal Shear stress = tv = V / b" x d" = 0.048 N/mm2
Designed Nominal Shear Stress = tv = 0.048 N/mm2
Allowable Shear Stress = ks.tc = ( CLAUSE 31.3.3 IS 456 : 2000 )
where, ks = ( 0.5+b )
b = Short Side of Column = 0.4 1.14
Long Side of Column = 0.35
ks = 1.64 but not greater than 1.0 tc = 0.25 sqrt(fck)
2
tc = 0.25 sqrt( 25 1.25 N/mm
2
Allowable Shear stress = ks.tc = 1.25 N/mm SAFE
6.0 SUMMARY :
GL
10 # @ 150 C/C
H = 2100
10 # @ 150 C/C
D = 500
d = 50
B = 1500
10 # @ 150 C/C 10 # @ 150 C/C
SECTION A-A
B = 1500 WIDTH
L = 2000 LENGTH
A
PLAN