SCHEDULE OF GROUND & PLINTH BEAMS.

M20 GRADE OF CONCRETE


PB6
C13
230X450 PB6 03
C12 C14 BEAM SIZE STIRRUPS END STIRRUPS
230X380 230X380 TOP BAR BOTTOM BAR CURTAIL BAR EXTRA TOP REMARK
GROUP B XD ZONE L/4 MIDDLE HALF
PB0 150X300 2-10 Dia 2-12 Dia - - 8 dia - 175mm c/c 8 dia - 175mm c/c

PB1 230X380 2-10 Dia 2-12 Dia - 1-12 Dia 8 dia - 150mm c/c 8 dia - 200mm c/c
PB1

PB2

PB2
PB3

PB3
PB2 230X380 2-12 Dia 2-12 Dia 1-12 Dia 1-12 Dia 8 dia - 150mm c/c 8 dia - 200mm c/c
PB1
PB3 230X380 2-12 Dia 3-12 Dia 1-12 Dia 2-12 Dia 8 dia - 125mm c/c 8 dia - 175mm c/c
PB0

C10 PB4 230X380 2-12 Dia 2-12 Dia - 1-12 Dia 8 dia - 150mm c/c 8 dia - 200mm c/c
230X530
C9 C11
230X450 230X450 PB5 230X450 2-12 Dia 3-12 Dia 1-12 Dia 2-12 Dia 8 dia - 150mm c/c 8 dia - 200mm c/c
PB7 PB7
PB6 230X450 2-12 Dia 2-12 Dia 2-12 Dia 2-12 Dia 8 dia - 125mm c/c 8 dia - 175mm c/c
PB1

PB1

PB1

PB2
PB7 230X450 2-12 Dia 3-12 Dia 2-12 Dia 8 dia - 125mm c/c 8 dia - 175mm c/c
PB3

1-12 Dia

PBR 230X380 4-12 Dia 3-12 Dia - - 8 dia - 100mm c/c 8 dia - 125mm c/c
PBR
C8 PB2
230X380
C6 C7
Min. Ld
FIRST FLOOR LEVEL =50xbar dia
230X450 230X450

PB7

125
0.3
L
PB2

SLAB AND BEAM


PB2

AS PER SCHEDULE Main steel


10dia@100mm c/c

SECOND FLIGHT OF STAIRCASE 0.3 MID LANDING LEVEL


TYPICAL RING / STIRRUP Top Bars
PB5

WAIST SLAB THK. L Bent in Beams


C4
PB6 C5 125mm thick
75mm

230X450 230X450

LEGENDS : MID LANDING LEVEL


Top Bars
PB1

L Bent in Beams
0.3 75mm

PLINTH BEAMS MId Landing


Beam
secondary steel
08dia@150mm c/c secondary steel
PB4

C2
PB4 C3 GROUND BEAMS 08dia@150mm c/c
230X530 230X450
L L
BEAM BOTTOM MIN. 150MM 0.3
BELOW NGL Main steel

125
PB1

PLINTH LEVEL 10dia@100mm c/c PLINTH LEVEL


PB1

150

C1 COLUMN Development Length (Ld=50*d) : WAIST SLAB THK.


230X450 125mm thick
UPTO Plinth Beams
COMPOUND CC3 BAR DIAMETER MIN. LAP LENGTH As per shedule FIRST FLIGHT OF STAIRCASE
PB1

WALL TOP PB6 230X300 10 mm 500 mm


ONLY CC2 COLUMN 12 mm 600 mm
TYPICAL SECTION THROUGH FLIGHTS OF STAIRCASE
230X300 UPTO 16 mm 800 mm
CC1 PB6
COMPOUND 20 mm 1000 mm
230X300 STRUCTURAL LAYOUT OF GROUND & PLINTH
WALL TOPBEAMS.
ONLY

End bent to All


Top,Bottom & Continue
Extra Top Bars extra top
(d=depth of beam) Column links at
Ld=Development upto L/4 IMPORTANT NOTES :-
end zone stirrups Rest span column-beam junction are necessary
Length ( L/4 ) stirrups (Middle zone) Ld=50xbar dia
1. All work shall be strictly executed as per the drawing.
Ld=50xbar dia
Ld= 42xbar dia.
2. Structure is designed for G+2 (3 SLABS) only.
3. Concrete Grade M20 and Steel Fe500 shall be used. TITLE
4. Load of Bricks for partition walls are considered for design. OF THE STRUCTURAL SCHEDULE OF
5. Take permission from structural engineer before concreting at site. SHEET GROUND AND PLINTH BEAM
50mm max
Ld=50xbar dia 6. Clear Cover to R/F bars shall be - Column 40mm , Footings 50mm
Curtail Bar Ld=50xbar dia
anchorage pins first stirrup Position at Middle 0.65L At intermediate beam junctions 7. Developement/Lap length shall be used as 50 times dia of bar.
16mmØ Continue Top & Bottom bars as per 8. Stripping time of formwork Shall be as per I.S.456-2000.
L=Length of Beam TITLE
development Length(Ld) criteria
9. False work/ Shuttering Stability is responsibility of contractor.
PROPOSED CONSTRUCTION OF
Column Column OF THE
10. Live load considered over these slab is 2.25 kN/m2 PROJECT RESIDENTIAL BUILDING
11. If any Special Loads are there kindly inform to structural engineer before applying. FOR MR. JAISING PANDIT
12. Any descripency shall be asked and discussed to Structural Engineer.
TYP. DETAILS OF LONGITUDINAL SECTION OF BEAM. 13. Structure is designed only for Gravity Loads. DATE 02.09.2023 REVISIONS R0