PRODUCED BY AN AUTODESK STUDENT VERSION

Concrete Block K325


Shore Line
0 Layer 1 Batu Pecah ±
0.89m (W=1.88 ton)
Layer 2 Batu Pecah ±
0.41m (W=0.18 ton)

Road

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

1.03

2
Toe Batu Pecah
(W= 0.05 ton)
1 1.02

0.98
MWL
0.13
0.29

1 0.60

30

1.20 1.52

1.78 2.05 1.78 3.61 0.49 1.96 2.05 0.50

POTONGAN MELINTANG REVETMENT


SKALA 1:50

SEPULUH NOPEMBER INSTITUTE OF TECHNOLOGY Provinsi :


FACULTY OF MARINE ENGINEERING
OCEAN ENGINEERING DEPARTMENT BALI
Judul :
POTONGAN MELINTANG Pekerjaan : DESAIN REVETMENT
PANTAI PEBUAHAN
REVETMENT
Kabupaten : JEMBRANA
Diperiksa

Disetujui

Diperiksa Dosen Pembimbing Dr. Ir. Hasan Ikhwani, M.Sc.


Disetujui Dosen Pembimbing Dr. Ir. Hasan Ikhwani, M.Sc. Tanggal :