You are on page 1of 1

C 0.44 1.68 1.01 0.36 0.44 1.44 1.03 0.37 0.44 1.21 1.05 0.

38 PEMERINTAH KABUPATEN SAMPANG


B DINAS PEKERJAAN UMUM DAN
PENATAAN RUANG
A 11.57
JL. JAKSA AGUNG SUPRAPTO NO. 31 TELP. (0323) 321387 SAMPANG

0.38 1.05
NAME OF ACTIVITY :
0.36 1.0

1.21
PEMBANGUNAN JALAN JEMBATAN
P1-R LINGKAR SELATAN (JLS)
3.06 0.40 2.69 0.40 0.40 2.47 0.40 0.40 2.27 0.40
1

5.46 3.49 3.28 3.07


P1-L

0.44
SECTION A SECTION B SECTION C AS BUILT DRAWING
1.68

3.08 SCALE 1:100 SCALE 1:100 SCALE 1:100

LOCATION :
0.44 1.56 1.02 0.37
0.44

0.44 1.33 1.04 0.37


11.59
KECAMATAN SAMPANG DAN KECAMATAN
TORJUN
PLAN VIEW (P1)

1.99

1.91
SCALE 1:100

REVIEWED BY :

3.38

0.99 0.41
11.00

3.24

0.93 0.40
PT. MONO HEKSA
1.00 9.00 1.00
KSO
PT. KENCANA LAYANA KONSULTAN

+35.281
P1-L

2.62
Ac-Wc, t = 5.0 cm

2.62
P1-R

2.40
2.40
FAJAR ARISTIONO, ST.
SITE ENGINEER

KNOW BY :
3.38

3.37
DINAS PEK-PUPR PPTK

1.75

1.75

1.75
1.75
SIDE VIEW (CENTRE P1-L) SIDE VIEW (CENTRE P1-R)
SCALE 1:100 SCALE 1:100

M.HASAN MUSTOFA, ST.,MSi


2.74

2.62

0.74
2.51

2.40

2.28

NIP. 19760809 200501 1 010


1.99
1.82 DRAWING TITLE :
P1-L P1-R 1.94
1.77 DETAIL PILAR P-1
2.06 STA 6+111.183
0.66
5.46
1.75

1.75

SCALE: 1 : 100
0.82

D D
DRAWING NO. 01

6.00
1.51

P1-R
ASRI DPK KSO
5.46
P1-L DRAWN BY : SIGN DATE
1.52

IDRIS AKHMAD.W
1.54

5 @ 1.9 = 9.50 ACKNOWLEDGE BY : SIGN DATE


0.75 0.75 11.01
0.66

11.00
FRONT VIEW (P1) SECTION D
SCALE 1:100 SCALE 1:100 Ir. Ukkas Tjoteng

You might also like