Professional Documents
Culture Documents
W2003779
This information covers the proper procedure for replacing the EPG housing on the
VOLVO D12D engine.
Contents
• “EPG Housing, Replacement” page 2
PV776-20177442 USA23122.ihval
Volvo Trucks North America Date Group No. Page
Service Bulletin 9.2006 253 22 2(8)
Service Procedures
2539-03-02-04
EPG Housing, Replacement
See also:
Removal
1
Remove inner fender and bracket.
W2004243
2
Remove air filter housing and fresh air pipe; refer to
Service Information, group 25.
W2003859
Volvo Trucks North America Date Group No. Page
Service Bulletin 9.2006 253 22 3(8)
3
Disconnect air supply line to EPG.
W2003872
4
Remove EGR pipe heat shield.
5
Remove the 2 EGR valve exhaust pipes and 4 clamps to
EGR cooler.
W2004257
6
Remove wiring harness rail from EGR valve assembly
and EGR cooler brackets.
W2003828
Volvo Trucks North America Date Group No. Page
Service Bulletin 9.2006 253 22 4(8)
7
Remove EGR valve clamps to exhaust manifold.
W2003822
8
Move aside the EGR valve assembly to enable access
to turbocharger.
9
Remove exhaust clamp from EPG to turbocharger.
W2003871
10
Loosen clamp and remove exhaust pipe from EPG
housing.
W2003869
Volvo Trucks North America Date Group No. Page
Service Bulletin 9.2006 253 22 5(8)
11
Remove gasket between EPG housing and exhaust pipe.
W2003870
12
Separate EPG housing from exhaust pipe and
turbocharger; lift and remove from engine.
W2003892
Installation
1
Lower EPG housing into position between exhaust
pipe and turbocharger.
W2003892
Volvo Trucks North America Date Group No. Page
Service Bulletin 9.2006 253 22 6(8)
2
Install gasket between EPG housing and exhaust pipe.
W2003870
3
Install exhaust clamp from EPG to turbocharger.
W2004217
4
Tighten clamp attaching exhaust pipe to EPG housing.
W2004218
Volvo Trucks North America Date Group No. Page
Service Bulletin 9.2006 253 22 7(8)
5
Position the EGR valve assembly against the exhaust
manifold. Install EGR valve clamps to exhaust manifold.
Torque-tighten clamps to 10 ± 2 Nm (7 ± 1.5 ft-lb).
10 ± 2 Nm
(7 ± 1.5 ft-lb)
W2003822
6
Install wiring harness rail to the EGR valve assembly and
the EGR cooler brackets.
W2003828
7
Install the 2 EGR valve exhaust pipes and 4 clamps to
EGR cooler. Torque-tighten clamps to 10 ± 2 Nm (7
± 1.5 ft-lb).
10 ± 2 Nm
(7 ± 1.5 ft-lb)
W2004257
8
Install EGR pipe heat shield.
Volvo Trucks North America Date Group No. Page
Service Bulletin 9.2006 253 22 8(8)
9
Connect air supply line to EPG.
W2003872
10
Install air filter housing and fresh air pipe; refer to Service
Information, group 25.
W2003859
11
Install inner fender and bracket.
W2004243