RE/RTO's DAILY REPORT Form Ref : POC-ICA-RSS-Daily Report-Rev.

PROJECT : Construction of a New Annex to ICA Building and Retrofitting of ICA Building (ICAB)
DATE : 1/12/2021

10am

11am

12pm
7am

8am

9am

1pm

2pm

3pm

4pm

5pm

6pm

7pm
Weather Prepared By : Mark
(Highlight the

10pm

11pm

12am
(Name & Signature)
7pm

8pm

9pm

1am

2am

3am

4am

5am

6am

7am
time of rain)

Manpower
Time of Activity Location (Zone/Sty) Trade Total Sub-Contractor Description
M E/C S W
Phase 4 Masonry Works 0 0 0 0 0 Hainei Works not started
Plastering / Skim Coating 0 0 0 0 0 Hainei Completed
Carpenter & Joinery 0 0 0 0 0 Hainei Works not started
Tiler 0 0 0 0 0 Hainei Works not started
Painter 0 0 0 0 0 Hainei Works not started

Waterproofing Works at Upper Roof


Waterproofing 0 0 0 0 0 ADF (GL.C-E/3-4) - POSTPONED

Ceiling Works 0 0 0 0 0 Hainei Works not started


Dry-Wall Works 0 0 0 0 0 Hainei Works not started

Floor Screeding / Hardener 0 0 0 0 0 ADF Completed

Raised Flooring 0 0 0 0 0 Hainei Works not started


Window Installation 0 0 0 0 0 TBA Works not started

Cladding/Curtain wall 0 0 1 2 3 Lindner 1. Installation of Louver Blades at


L1Ventshaft (GL.A-Aa/6-7)

1. Rectification of Floor 1. Rectification of Floor Spider Crack


Spider Crack at Upper at Upper Roof (GL.D-E/2-3) -
Roof (GL.D-E/2-3) - 0 0 0 0 0 ADF POSTPONED
POSTPONED
Landscaping 0 0 0 0 0 TBA Works not started
Roofing System 0 0 0 0 0 TBA Works not started

1. Housekeeping at L1
1. Housekeeping at L1 and Roof
and Roof 1 0 0 1 2 POC

Note :

Raining :
Visitors / Instructions from Architect or Engineer

Manpower : M = Managers ; E/C = Engineers/Coordinators ; S = Supervisors ; W = Workers