You are on page 1of 1

Long Term O&M Contracts for Sewage Treatment Plant Package 5 - Manfouha

MN4 Sewage Treatment Plant


MCC-2 (4/4) Daily Log Sheet
Date:
Indications :- ✓ : On/Open  : Off/Close S : Stand-By F : Fault Numbers : Readings
Supernatant Pumping Station Silo Weight Bridge
Pump Flowmeter 1 2 3 4 Transfered Dried Sludge
Time Level
Flow Total Level Inlet Outlet Cooling Level Inlet Outlet Cooling Level Inlet Outlet Cooling Level Inlet Outlet Cooling Net Weight
(m) 1 2 3 S.N Invoice No. Time Vehicle No.
(m3/hr) (m3) (m) Valve Valve Pump (m) Valve Valve Pump (m) Valve Valve Pump (m) Valve Valve Pump (Kg)
12:00 AM 1
1:00 AM 2
2:00 AM 3
3:00 AM 4
4:00 AM 5
5:00 AM 6
6:00 AM 7
7:00 AM 8
8:00 AM 9
9:00 AM 10
10:00 AM 11
11:00 AM 12
12:00 PM 13
1:00 PM 14
2:00 PM 15
3:00 PM 16
4:00 PM 17
5:00 PM 18
6:00 PM 19
7:00 PM 20
8:00 PM 21
9:00 PM 22
10:00 PM 23
11:00 PM 24
Equipments Total Hours For Each Operational Status 25
On/Open 26
Off/Close 27
Stand-By 28
Fault 29
Meters Average Average Difference Average Average Average Average 30
Calculate Total (kg)
Doc No. MEDSCO-QMS-MN4-009-DWS-04-LOG-Rev000
Shift Operation Supervisor Name MN4 Plant Manager
1st Shift
2nd Shift
3rd Shift Eng. Mohammad Embaby