You are on page 1of 1

DAILY SITE ACTIVITY PROGRESS REPORT

LOGO LOGO PROJECT: ABCDEFGHIJKLMNOP

Client - XYZABC Contractors - XXXYYYZZZ Project Status Date Monday, January 6, 2020
Safe Manhours Timeline Tracker Report No: Project Name_DPR_ProgressDate
Completed days 5 Shift I Shift II
555

10:00 AM
11:00 AM
12:00 PM

10:00 PM
11:00 PM
12:00 AM
Total Contract Days 203

7:00 AM
8:00 AM
9:00 AM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM

1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM

6:00 AM
Weather
Shift I Shift II Total
Manpower 32 0 32
Working Hour 10 0 10 Clear / Sunny            
Manhour 320 0 320 Cloudy
Critical Issues - Installtion & Safety (Today) Drizzle
1 Rainy
Manpower Shift I Shift II Equipment& tools Nos. Material delivery Today's Qty Cumm. Till date Qty
Project Manager Handcutter 4 Concrete Ready Mix (m3) 545.00
Sr. Engineer (Construction) 1 Pilling Machine Rebar (ton) 86.50
QA/QC Engineer 1 Cutting machine 2 Aggregate-Stone Chips (m3) 242.00
Planner / Document Controller 1 Welding machine 1 Cement V (nos.) 56.00
Sr. Superviser / Officer (Safety) 1 Excavator 3 Brick (nos.) 4000.00
Sr. Executive (Admin) 1 Hydraulic Jack Hammer Waterproof Membrane (Set) 24.00
Project Supervisor 2 Total Station 1 Nitofloor Hardtop (Bags) 94.00
Foreman 2 Vibrator machine 3 Epoxy Chemical Index (Nos.) 11.00
Surveyor 1 Power Brush Machine 2 Decking Sheet (ton) 11.00
Storekeeper 1 Man Lift Machine 2 Floor Tiles (Sft) 400.00
Maintenance 1 Welding Tig Machine 2 Sika Grout-214 (bags) 25.00
Operators 2 Stud Bolt Machine 1 Shear Stud 20 mm (pcs) 3600.00
Workers 17 Dump truck HDPE Pipe (M) 162.00
Office Boy 1 Crane truck 2 HDPE Pipe Fittings (Piece) 24.00
Fire Doors 2.00
TOTAL MANPOWER 32 0 TOTAL MACHINARIES 23 Point & Channel Blucher(nos) 13.00
DAILY ACTIVITIES
Cum upto Program
Cum. Today's %
No. Item Description Location Unit BOQ Qty. Balance Previous for next Start Date Finish Date
Complete Progress Complete
day day
1 Activity 1 Location A Cum 316 206 110 95 111 82 65% D-M-YYY D-M-YYY
2 Activity 2 Location B m 615 600 15 120 480 98 98% D-M-YYY D-M-YYY
3 Activity 3 Location C Cum 745 468 277 158 310 35 63% D-M-YYY D-M-YYY
4 Activity 4 Location D Cum 610 240 370 50 190 25 39% D-M-YYY D-M-YYY
5 Activity 5 Location A Cum 655 269 386 19 250 112 41% D-M-YYY D-M-YYY
6 Activity 6 Location B Cum 96 0 96 23 0% D-M-YYY D-M-YYY
7 Activity 7 Location C Ton 86.5 0 86.5 58 0% D-M-YYY D-M-YYY
8 Activity 8 Location D Cum 100 0 100 41 0% D-M-YYY D-M-YYY
9 Activity 9 Location A Sqm 330 0 330 141 0% D-M-YYY D-M-YYY
10 Activity 10 Location B nos 5 3 2 1 2 1 60% D-M-YYY D-M-YYY
11 Activity 11 Location C Sqm 290 0 290 0% D-M-YYY D-M-YYY
12 Activity 12 Location D Rm 162 0 162 0% D-M-YYY D-M-YYY
13 Activity 13 Location A Ton 0.5 0 0.5 0% D-M-YYY D-M-YYY
14 Activity 14 Location B Sqm 33 0 33 0% D-M-YYY D-M-YYY
15 Activity 15 Location C Sqm 1610 0 1610 0% D-M-YYY D-M-YYY
16 Activity 16 Location D Cum 0.5 0 0.5 0% D-M-YYY D-M-YYY
17 Activity 17 Location A Sqm 920 0 920 0% D-M-YYY D-M-YYY
18 Activity 18 Location B Sqm 320 0 320 0% D-M-YYY D-M-YYY
19 Activity 19 Location C Sqm 110 0 110 0% D-M-YYY D-M-YYY
20 Activity 20 Location D Cum 303 0 303 0% D-M-YYY D-M-YYY
21 Activity 21 Location A Rm 162 0 162 0% D-M-YYY D-M-YYY
22 Activity 22 Location B Nos 3 0 3 0% D-M-YYY D-M-YYY
23 Activity 23 Location C Nos 10 0 10 0% D-M-YYY D-M-YYY
24 Activity 24 Location D Sqm 2400 0 2400 0% D-M-YYY D-M-YYY
SITE PHOTOGRAPHS (TODAY)

Photo 1: Photo 2:

Photo 3: Photo 4:
NOTE / REMARK

asdfghjkl;asdfghjkl;sdfghjkl;note123456789

Sign: Sign:

Prepared By "Contractor" Checked By "Client"


Project Code: AABBCC DPR

You might also like